Skip to content
Sections in this chapter

§ 905. Fees for certain loan guarantees

  • (a) For electrification baseload generation loan guarantees, the Secretary shall, at the request of the borrower, charge an upfront fee to cover the costs of the loan guarantee.
  • (b) The fee described in subsection (a) for a loan guarantee shall be equal to the costs of the loan guarantee (within the meaning of section 661a(5)(C) of title 2 ).
  • (c) Funds received from a borrower to pay the fee described in this section shall not be derived from a loan or other debt obligation that is made or guaranteed by the Federal Government.
OpenLaw Git Workbench

Statutory Version Intelligence & Diffs

Quick Presets:
0 official releases tracked