50 U.S.C. § 2523c
Title 50
Chapter 42
Current through PL 116-220
~1 min read
Last updated: March 30, 2026
View on OLRC →
Sections in this chapter
- § 2501
- § 2511
- § 2512
- § 2513
- § 2514
- § 2515
- § 2521
- § 2522
- § 2523
- § 2523a
- § 2523b
- § 2523c
- § 2524
- § 2524a
- § 2525
- § 2526
- § 2527
- § 2528
- § 2528a
- § 2529
- § 2530
- § 2531
- § 2532
- § 2533
- § 2534
- § 2535
- § 2536
- § 2537
- § 2538
- § 2538a
- § 2538b
- § 2538c
- § 2538d
- § 2541
- § 2542
- § 2543
- § 2544
- § 2545
- § 2561
- § 2562
- § 2563
- § 2564
- § 2565
- § 2566
- § 2567
- § 2568
- § 2569
- § 2570
- § 2571
- § 2572
- § 2573
- § 2574
- § 2575
- § 2576
- § 2577
- § 2581
- § 2582
- § 2582a
- § 2583
- § 2584
- § 2585
- § 2586
- § 2587
- § 2588
- § 2589
- § 2590
- § 2601
- § 2602
- § 2603
- § 2621
- § 2622
- § 2623
- § 2624
- § 2625
- § 2626
- § 2627
- § 2631
- § 2632
- § 2633
- § 2637
- § 2638
- § 2651
- § 2652
- § 2653
- § 2654
- § 2655
- § 2656
- § 2657
- § 2658
- § 2659
- § 2660
- § 2661
- § 2671
- § 2672
- § 2673
- § 2674
- § 2675
- § 2701
- § 2702
- § 2703
- § 2704
- § 2705
- § 2721
- § 2722
- § 2723
- § 2731
- § 2732
- § 2733
- § 2734
- § 2735
- § 2736
- § 2741
- § 2742
- § 2743
- § 2743a
- § 2744
- § 2745
- § 2746
- § 2747
- § 2748
- § 2749
- § 2750
- § 2751
- § 2752
- § 2753
- § 2754
- § 2755
- § 2756
- § 2761
- § 2762
- § 2771
- § 2772
- § 2773
- § 2781
- § 2782
- § 2782a
- § 2783
- § 2784
- § 2785
- § 2786
- § 2787
- § 2791
- § 2791a
- § 2791b
- § 2792
- § 2793
- § 2794
- § 2795
- § 2811
- § 2812
- § 2813
- § 2814
- § 2821
- § 2822
§ 2523c. Major warhead refurbishment program
In fiscal year 2015 and subsequent fiscal years, the Secretary of Energy shall submit to the congressional defense committees (as defined in U.S.C. 101(a)(16) 1 1 So in original. Probably should be “ 10 U.S.C. 101(a)(16) ”. ) a report, on each major warhead refurbishment program that reaches the Phase 6.3 milestone, that provides an analysis of alternatives. Such report shall include—
- (1) a full description of alternatives considered prior to the award of Phase 6.3;
- (2) a comparison of the costs and benefits of each of those alternatives, to include an analysis of trade-offs among cost, schedule, and performance objectives against each alternative considered;
- (3) identification of the cost and risk of critical technology elements associated with each alternative, including technology maturity, integration risk, manufacturing feasibility, and demonstration needs;
- (4) identification of the cost and risk of additional capital asset and infrastructure capabilities required to support production and certification of each alternative;
- (5) a comparative analysis of the risks, costs, and scheduling needs for any military requirement intended to enhance warhead safety, security, or maintainability, including any requirement to consolidate and/or integrate warhead systems or mods as compared to at least one other feasible refurbishment alternative the Nuclear Weapons Council considers appropriate; and
- (6) a life-cycle cost estimate for the alternative selected that details the overall cost, scope, and schedule planning assumptions.
Change History
No amendments tracked yet for this section.
Change history will appear here automatically when the pipeline detects modifications between US Code release points.