Skip to content
Sections in this chapter

§ 2213a. Treatment of certain benefits and costs

  • (a) In the case of a flood risk management or coastal storm risk management project in a region of moderate or high seismic hazard, for the purpose of a benefit-cost analysis for the project, the Secretary shall not include in that analysis any additional design and construction costs resulting from addressing seismic concerns.
  • (b) Except with respect to the benefit-cost analysis, the additional costs referred to in subsection (a) shall be—
    • (1) included in the total project cost; and
    • (2) subject to cost-share requirements otherwise applicable to the project.
OpenLaw Git Workbench

Statutory Version Intelligence & Diffs

Quick Presets:
0 official releases tracked