20 U.S.C. § 76m
Title 20
Chapter 3
Current through PL 116-220
~1 min read
Last updated: March 30, 2026
View on OLRC →
Sections in this chapter
- § 1
- § 2
- § 3
- § 4
- § 5
- § 6
- § 7
- § 8
- § 9
- § 9a
- § 10
- § 11
- § 12
- § 13
- § 14
- § 15
- § 41
- § 42
- § 43
- § 44
- § 45
- § 46
- § 46a
- § 47
- § 48
- § 49
- § 50
- § 50a
- § 51
- § 52
- § 53
- § 53a
- § 54
- § 55
- § 56
- § 57
- § 58
- § 59
- § 60
- § 64
- § 65
- § 65a
- § 66
- § 67
- § 68
- § 69
- § 70
- § 71
- § 71a
- § 71b
- § 72
- § 73
- § 74
- § 74a
- § 75
- § 75a
- § 75b
- § 75c
- § 75d
- § 75e
- § 75f
- § 75g
- § 76a
- § 76aa
- § 76b
- § 76bb
- § 76c
- § 76cc
- § 76d
- § 76dd
- § 76e
- § 76ee
- § 76f
- § 76g
- § 76h
- § 76i
- § 76j
- § 76k
- § 76l
- § 76m
- § 76n
- § 76o
- § 76p
- § 76q
- § 76r
- § 76s
- § 77
- § 77a
- § 77b
- § 77c
- § 77d
- § 78
- § 78a
- § 79
- § 79a
- § 79b
- § 79c
- § 79d
- § 79e
- § 80
- § 80a
- § 80b
- § 80c
- § 80d
- § 80e
- § 80f
- § 80g
- § 80h
- § 80i
- § 80j
- § 80k
- § 80l
- § 80m
- § 80n
- § 80o
- § 80p
- § 80q
- § 80r
- § 80s
§ 76m. Photovoltaic system
- (a) The Board may study, plan, design, engineer, and construct a photovoltaic system for the main roof of the John F. Kennedy Center for the Performing Arts.
- (b) Not later than 60 days before beginning construction of the photovoltaic system pursuant to subsection (a), the Board shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report on the feasibility and design of the project.
Change History
No amendments tracked yet for this section.
Change history will appear here automatically when the pipeline detects modifications between US Code release points.