Skip to content
Sections in this chapter

§ 6123. Acceleration of depleted uranium manufacturing processes

  • (a) The Administrator shall require the nuclear security enterprise to accelerate the modernization of manufacturing processes for depleted uranium by 2030 so that the nuclear security enterprise—
    • (1) demonstrates bulk cold hearth melting of depleted uranium alloys to augment existing capabilities on an operational basis for war reserve components;
    • (2) manufactures, on a repeatable and ongoing basis, war reserve depleted uranium alloy components using net shape casting;
    • (3) demonstrates, if possible, a production facility to conduct routine operations for manufacturing depleted uranium alloy components outside of the current perimeter security fencing of the Y-12 National Security Complex, Oak Ridge, Tennessee; and
    • (4) has available high purity depleted uranium for the production of war reserve components.
  • (b) Not later than March 31, 2023 , and annually thereafter through 2030, the Administrator shall provide to the congressional defense committees a briefing on—
    • (1) progress made in carrying out subsection (a);
    • (2) the cost of activities conducted under such subsection during the preceding fiscal year; and
    • (3) the ability of the nuclear security enterprise to convert depleted uranium fluoride hexafluoride to depleted uranium tetrafluoride.
OpenLaw Git Workbench

Statutory Version Intelligence & Diffs

Quick Presets:
0 official releases tracked