Skip to content

10 U.S.C. § 2448a

Title 10 Chapter 144 Current through PL 116-220 ~1 min read Last updated: March 30, 2026 View on OLRC →
Sections in this chapter

§ 2448a. Program cost, fielding, and performance goals in planning major defense acquisition programs

  • (a)
    • (1) Before funds are obligated for technology development, systems development, or production of a major defense acquisition program, the designated milestone decision authority for the program shall ensure, by establishing the goals described in paragraph (2), that the program will—
      • (A) be affordable;
      • (B) incorporate program planning that anticipates the evolution of capabilities to meet changing threats, technology insertion, and interoperability; and
      • (C) be fielded when needed.
    • (2) The goals described in this paragraph are goals for—
      • (A) the procurement unit cost and sustainment cost (referred to in this section as the “program cost targets”);
      • (B) the date for initial operational capability (referred to in this section as the “fielding target”); and
      • (C) technology maturation, prototyping, and a modular open system approach to evolve system capabilities and improve interoperability.
  • (b) In this section:
    • (1) The term “procurement unit cost” has the meaning provided in section 2432(a)(2) of this title .
    • (2) The term “initial capabilities document” has the meaning provided in section 2366a(d)(2) of this title .

Change History

No amendments tracked yet for this section.

Change history will appear here automatically when the pipeline detects modifications between US Code release points.