Skip to content

43 U.S.C. § 50e

Title 43 Chapter 2 Current through PL 118-3 Last updated: March 29, 2026 View on OLRC →
Sections in this chapter

§ 50e. USGS energy and minerals research facility

  • (a) The Director of the United States Geological Survey (referred to in this section as the “Director”), 1 1 So in original. The comma probably should not appear. shall fund, through a cooperative agreement with an academic partner, the design, construction, and tenant build-out of a facility to support energy and minerals research and appurtenant associated structures.
  • (b) The United States Geological Survey shall retain ownership of the facility and associated structures described in subsection (a).
  • (c) The Director may enter into agreements with, and to collect and expend funds or in-kind contributions from, academic, Federal, State, or other tenants over the life of the facility described in subsection (a) for the purposes of—
    • (1) facility planning;
    • (2) design;
    • (3) maintenance;
    • (4) operation; or
    • (5) facility improvements.
  • (d) The Director may enter into a lease or other agreement with the academic partner with which the Director has entered into a cooperative agreement under subsection (a), at no cost to the Federal Government, to obtain land on which to construct the facility described in that subsection for a term of not less than 99 years.
  • (e) The Director shall submit to Congress annual reports on—
    • (1) the facility described in subsection (a); and
    • (2) the authorities used under this section.
  • (f) There is authorized to be appropriated to the Secretary of the Interior to carry out this section $167,000,000 for fiscal year 2022, to remain available until expended.

Change History

No history yet for this section.