Skip to content

43 U.S.C. § 620a

Title 43 Chapter 12 Current through PL 119-73 Last updated: March 29, 2026 View on OLRC →
Sections in this chapter

§ 620a. Priority to planning reports of certain additional participating projects; reports to States; San Juan-Chama project; Juniper project

  • (1) be limited to a single offstream dam and reservoir on a tributary of the Chama River,
  • (2) be used solely for control and regulation and no power facilities shall be established, installed or operated thereat, and
  • (3) be operated at all times by the Bureau of Reclamation of the Department of the Interior in strict compliance with the Rio Grande Compact as administered by the Rio Grande Compact Commission. The preparation of detailed designs and specifications for the works proposed to be constructed in connection with projects shall be carried as far forward as the investigations thereof indicate is reasonable in the circumstances. The Secretary, concurrently with the investigations directed by the preceding paragraph, shall also give priority to completion of a planning report on the Juniper project.

Change History

No history yet for this section.