43 U.S.C. § 12p

Title 43 Chapter 12 Current through PL 119-73 Last updated: March 29, 2026 View on OLRC →
Sections in this chapter

§ 390h–12p. Tooele Wastewater Treatment and Reuse Project

  • (a) The Secretary, in cooperation with Tooele City, Utah, is authorized to participate in the design, planning, and construction of the Tooele Wastewater Treatment and Reuse Project.
  • (b) The Federal share of the cost of a project described in subsection (a) shall not exceed 25 percent of the total cost.
  • (c) The Secretary shall not provide funds for the operation or maintenance of a project described in subsection (a).