42 U.S.C. § 17232
Sections in this chapter
- § 17001
- § 17002
- § 17011
- § 17012
- § 17013
- § 17014
- § 17021
- § 17022
- § 17031
- § 17032
- § 17033
- § 17034
- § 17035
- § 17051
- § 17052
- § 17053
- § 17054
- § 17061
- § 17062
- § 17063
- § 17064
- § 17071
- § 17081
- § 17082
- § 17083
- § 17084
- § 17085
- § 17086
- § 17091
- § 17092
- § 17093
- § 17094
- § 17095
- § 17096
- § 17111
- § 17112
- § 17113
- § 17113a
- § 17113b
- § 17114
- § 17115
- § 17115a
- § 17116
- § 17121
- § 17122
- § 17123
- § 17124
- § 17131
- § 17141
- § 17142
- § 17143
- § 17144
- § 17151
- § 17152
- § 17153
- § 17154
- § 17155
- § 17156
- § 17157
- § 17158
- § 17171
- § 17172
- § 17173
- § 17175
- § 17191
- § 17192
- § 17193
- § 17194
- § 17195
- § 17195a
- § 17196
- § 17197
- § 17198
- § 17200
- § 17201
- § 17202
- § 17203
- § 17204
- § 17211
- § 17212
- § 17213
- § 17214
- § 17215
- § 17216
- § 17217
- § 17218
- § 17231
- § 17232
- § 17233
- § 17241
- § 17242
- § 17243
- § 17244
- § 17251
- § 17252
- § 17253
- § 17254
- § 17255
- § 17256
- § 17271
- § 17272
- § 17281
- § 17282
- § 17283
- § 17284
- § 17285
- § 17286
- § 17301
- § 17302
- § 17303
- § 17304
- § 17305
- § 17321
- § 17331
- § 17332
- § 17333
- § 17334
- § 17335
- § 17336
- § 17337
- § 17351
- § 17352
- § 17353
- § 17354
- § 17355
- § 17356
- § 17357
- § 17371
- § 17372
- § 17373
- § 17374
- § 17375
- § 17381
- § 17382
- § 17383
- § 17384
- § 17384a
- § 17385
- § 17386
- § 17387
- § 17388
- § 17389
- § 17390
- § 17391
- § 17392
§ 17232. Better energy storage technology
- (a) In this section:
- (1) The term “energy storage system” means any system, equipment, facility, or technology that—
- (A) is capable of absorbing or converting energy, storing the energy for a period of time, and dispatching the energy; and
- (B)
- (i) uses mechanical, electrochemical, thermal, electrolysis, or other processes to convert and store electric energy that was generated at an earlier time for use at a later time;
- (ii) uses mechanical, electrochemical, biochemical, or thermal processes to convert and store energy generated from mechanical processes that would otherwise be wasted, for delivery at a later time; or
- (iii) stores energy in an electric, thermal, or gaseous state for direct use for heating or cooling at a later time in a manner that avoids the need to use electricity or other fuel sources at that later time, such as a grid-enabled water heater.
- (2) The term “program” means the Energy Storage System Research, Development, and Deployment Program established under subsection (b)(1).
- (3) The term “Secretary” means the Secretary of Energy.
- (1) The term “energy storage system” means any system, equipment, facility, or technology that—
- (b)
- (1) Not later than 180 days after December 27, 2020 , the Secretary shall establish a program, to be known as the Energy Storage System Research, Development, and Deployment Program.
- (2) The program shall focus on research, development, and deployment of—
- (A) energy storage systems, components, and materials designed to further the development of technologies—
- (i) for large-scale commercial deployment;
- (ii) for deployment at cost targets established by the Secretary;
- (iii) for hourly and subhourly durations required to provide reliability services to the grid;
- (iv) for daily durations, which have the capacity to discharge energy for a minimum of 6 hours;
- (v) for weekly or monthly durations, which have the capacity to discharge energy for 10 to 100 hours, at a minimum; and
- (vi) for seasonal durations, which have the capability to address seasonal variations in supply and demand;
- (B) distributed energy storage technologies and applications, including building-grid integration;
- (C) long-term cost, performance, and demonstration targets for different types of energy storage systems and for use in a variety of regions, including rural areas;
- (D) transportation energy storage technologies and applications, including vehicle-grid integration;
- (E) cost-effective systems and methods for—
- (i) the sustainable and secure sourcing, reclamation, recycling, and disposal of energy storage systems, including critical minerals; and
- (ii) the reuse and repurposing of energy storage system technologies;
- (F) advanced control methods for energy storage systems;
- (G) pumped hydroelectric energy storage systems to advance—
- (i) adoption of innovative technologies, including—
- (I) systems with adjustable-speed and other new pumping and generating equipment designs;
- (II) modular systems;
- (III) closed-loop systems, including mines and quarries; and
- (IV) other innovative equipment and materials as determined by the Secretary; and
- (ii) reductions of civil works costs and construction times for hydropower and pumped storage systems, including comprehensive data and systems analysis of hydropower and pumped storage construction technologies and processes in order to identify areas for whole-system efficiency gains;
- (i) adoption of innovative technologies, including—
- (H) models and tools to demonstrate the costs and benefits of energy storage to—
- (i) power and water supply systems;
- (ii) electric generation portfolio optimization; and
- (iii) expanded deployment of other renewable energy technologies, including in integrated energy storage systems;
- (I) energy storage use cases from individual and combination technology applications, including value from various-use cases and energy storage services; and
- (J) advanced manufacturing technologies that have the potential to improve United States competitiveness in energy storage manufacturing or reduce United States dependence on critical materials.
- (A) energy storage systems, components, and materials designed to further the development of technologies—
- (3) In coordination with 1 or more National Laboratories, the Secretary shall support the development, standardized testing, and validation of energy storage systems under the program, including test-bed and field trials, by developing testing and evaluation methodologies for—
- (A) storage technologies, controls, and power electronics for energy storage systems under a variety of operating conditions;
- (B) standardized and grid performance testing for energy storage systems, materials, and technologies during each stage of development;
- (C) reliability, safety, degradation, and durability testing under standard and evolving duty cycles; and
- (D) accelerated life testing protocols to predict estimated lifetime metrics with accuracy.
- (4) Not less frequently than once every calendar year, the Secretary shall evaluate and, if necessary, update the program objectives to ensure that the program continues to advance energy storage systems toward widespread commercial deployment by lowering the costs and increasing the duration of energy storage resources.
- (5)
- (A) The Secretary shall develop a 10-year strategic plan for the program, and update the plan, in accordance with this paragraph.
- (B) The strategic plan developed under subparagraph (A) shall—
- (i) be coordinated with and integrated across other relevant offices in the Department;
- (ii) to the extent practicable, include metrics that can be used to evaluate storage technologies;
- (iii) identify Department programs that—
- (I) support the research and development activities described in paragraph (2) and the demonstration projects under subsection (c); and
- (II)
- (iv) include expected timelines for—
- (I) the accomplishment of relevant objectives under current programs of the Department relating to energy storage systems; and
- (II) the commencement of any new initiatives within the Department relating to energy storage systems to accomplish those objectives; and
- (v) incorporate relevant activities described in the Grid Modernization Initiative Multi-Year Program Plan.
- (C) Not later than 180 days after December 27, 2020 , the Secretary shall submit to the Committee on Energy and Natural Resources of the Senate and the Committees on Energy and Commerce and Science, Space, and Technology of the House of Representatives the strategic plan developed under subparagraph (A).
- (D) The Secretary—
- (i) shall annually review the strategic plan developed under subparagraph (A); and
- (ii) may periodically revise the strategic plan as appropriate.
- (6) The program may be led by a specific office of the Department, but shall be cross-cutting in nature, so that in carrying out activities under the program, the Secretary (or a designee of the Secretary charged with leading the program) shall leverage existing Federal resources, including, at a minimum, the expertise and resources of—
- (A) the Office of Electricity;
- (B) the Office of Energy Efficiency and Renewable Energy, including the Water Power Technologies Office; and
- (C) the Office of Science, including—
- (i) the Basic Energy Sciences Program;
- (ii) the Advanced Scientific Computing Research Program;
- (iii) the Biological and Environmental Research Program; and
- (D) the Electricity Storage Research Initiative established under section 16315 of this title .
- (7) In carrying out this subsection, the Secretary shall identify, incorporate, and follow best practices for protecting the privacy of individuals and businesses and the respective sensitive data of the individuals and businesses, including by managing privacy risk and implementing the Fair Information Practice Principles of the Federal Trade Commission for the collection, use, disclosure, and retention of individual electric consumer information in accordance with the Office of Management and Budget Circular A–130 (or successor circulars).
- (c)
- (1) Not later than September 30, 2023 , the Secretary shall, to the maximum extent practicable, enter into agreements to carry out 3 energy storage system demonstration projects, including—
- (A) at least 1 energy storage system demonstration project designed to further the development of technologies described in clause (v) or (vi) of subsection (b)(2)(A); and
- (B) 1 project to demonstrate second-life applications of electric vehicle batteries as aggregated energy storage installations to provide services to the electric grid, in accordance with paragraph (3).
- (2)
- (A) In this paragraph, the term “eligible entity” means—
- (i) a State energy office (as defined in section 15821(a) of this title );
- (ii) an Indian Tribe (as defined in section 4103 of title 25 ; 1 1 So in original. A closing parenthesis probably should precede the semicolon.
- (iii) a Tribal organization (as defined in section 3765 of title 38 );
- (iv) an institution of higher education (as defined in section 1001 of title 20 );
- (v) an electric utility, including—
- (I) an electric cooperative;
- (II) a political subdivision of a State, such as a municipally owned electric utility, or any agency, authority, corporation, or instrumentality of a State political subdivision; and
- (III) an investor-owned utility; and
- (vi) a private energy storage company.
- (B) The Secretary shall establish a competitive grant program under which the Secretary shall award grants to eligible entities to carry out demonstration projects for pilot energy storage systems.
- (C) In selecting eligible entities to receive a grant under subparagraph (B), the Secretary shall, to the maximum extent practicable—
- (i) ensure regional diversity among eligible entities awarded grants, including ensuring participation of eligible entities that are rural States and States with high energy costs;
- (ii) ensure that grants are awarded for demonstration projects that—
- (I) expand on the existing technology demonstration programs of the Department;
- (II) are designed to achieve 1 or more of the objectives described in subparagraph (D); and
- (III) inject or withdraw energy from the bulk power system, electric distribution system, building energy system, or microgrid (grid-connected or islanded mode) where the project is located;
- (iii) give consideration to proposals from eligible entities for securing energy storage through competitive procurement or contract for service; and
- (iv) prioritize projects that leverage matching funds from non-Federal sources.
- (D) Each demonstration project carried out by a grant awarded under subparagraph (B) shall have 1 or more of the following objectives:
- (i) To improve the security of critical infrastructure and emergency response systems.
- (ii) To improve the reliability of transmission and distribution systems, particularly in rural areas, including high-energy cost rural areas.
- (iii) To optimize transmission or distribution system operation and power quality to defer or avoid costs of replacing or upgrading electric grid infrastructure, including transformers and substations.
- (iv) To supply energy at peak periods of demand on the electric grid or during periods of significant variation of electric grid supply.
- (v) To reduce peak loads of homes and businesses.
- (vi) To improve and advance power conversion systems.
- (vii) To provide ancillary services for grid stability and management.
- (viii) To integrate renewable energy resource production.
- (ix) To increase the feasibility of microgrids (grid-connected or islanded mode).
- (x) To enable the use of stored energy in forms other than electricity to support the natural gas system and other industrial processes.
- (xi) To integrate fast charging of electric vehicles.
- (xii) To improve energy efficiency.
- (A) In this paragraph, the term “eligible entity” means—
- (3)
- (A) The Secretary shall enter into an agreement to carry out a project to demonstrate second-life applications of electric vehicle batteries as aggregated energy storage installations to provide services to the electric grid.
- (B) The purposes of the project under subparagraph (A) shall be—
- (i) to demonstrate power safety and the reliability of the applications demonstrated under the program;
- (ii) to demonstrate the ability of electric vehicle batteries—
- (I) to provide ancillary services for grid stability and management; and
- (II) to reduce the peak loads of homes and businesses;
- (iii) to extend the useful life of electric vehicle batteries and the components of electric vehicle batteries prior to the collection, recycling, and reprocessing of the batteries and components; and
- (iv) to increase acceptance of, and participation in, the use of second-life applications of electric vehicle batteries by utilities.
- (C) In selecting a project to carry out under subparagraph (A), the Secretary shall give priority to projects in which the demonstration of the applicable second-life applications is paired with 1 or more facilities that could particularly benefit from increased resiliency and lower energy costs, such as a multi-family affordable housing facility, a senior care facility, and a community health center.
- (4) Not less frequently than once every 3 years for the duration of the programs under paragraphs (1) and (2), the Secretary shall submit to Congress and make publicly available a report describing the performance of those programs.
- (5) The Federal Government shall not hold any equity or other ownership interest in any energy storage system that is part of a project under this subsection unless the holding is agreed to by each participant of the project.
- (1) Not later than September 30, 2023 , the Secretary shall, to the maximum extent practicable, enter into agreements to carry out 3 energy storage system demonstration projects, including—
- (d)
- (1) In this subsection:
- (A) The term “Initiative” means the demonstration initiative established under paragraph (2).
- (B) The term “Joint Program” means the joint program established under paragraph (4).
- (2) Not later than 180 days after December 27, 2020 , the Secretary shall establish a demonstration initiative composed of demonstration projects focused on the development of long-duration energy storage technologies.
- (3) To the maximum extent practicable, in selecting demonstration projects to participate in the Initiative, the Secretary shall—
- (A) ensure a range of technology types;
- (B) ensure regional diversity among projects; and
- (C) consider bulk power level, distribution power level, behind-the-meter, microgrid (gridconnected or islanded mode), and off-grid applications.
- (4)
- (A) As part of the Initiative, the Secretary, in consultation with the Secretary of Defense, shall establish within the Department a joint program to carry out projects—
- (i) to demonstrate promising long-duration energy storage technologies at different scales; and
- (ii) to help new, innovative long-duration energy storage technologies become commercially viable.
- (B) Not later than 200 days after December 27, 2020 , the Secretary shall enter into a memorandum of understanding with the Secretary of Defense to administer the Joint Program.
- (C) In carrying out the Joint Program, the Secretary and the Secretary of Defense shall—
- (i) use existing test-bed infrastructure at—
- (I) Department facilities; and
- (II) Department of Defense installations; and
- (ii) develop new infrastructure for identified projects, if appropriate.
- (i) use existing test-bed infrastructure at—
- (D) The Secretary and the Secretary of Defense shall develop goals and metrics for technological progress under the Joint Program consistent with energy resilience and energy security policies.
- (E)
- (i) To the maximum extent practicable, in selecting projects to participate in the Joint Program, the Secretary and the Secretary of Defense shall—
- (I) ensure that projects are carried out under conditions that represent a variety of environments with different physical conditions and market constraints; and
- (II) ensure an appropriate balance of—
- (ii) In carrying out the Joint Program, the Secretary and the Secretary of Defense shall give priority to demonstration projects that—
- (I) make available to the public project information that will accelerate deployment of long-duration energy storage technologies; and
- (II) will be carried out in the field.
- (i) To the maximum extent practicable, in selecting projects to participate in the Joint Program, the Secretary and the Secretary of Defense shall—
- (A) As part of the Initiative, the Secretary, in consultation with the Secretary of Defense, shall establish within the Department a joint program to carry out projects—
- (1) In this subsection:
- (e)
- (1) In this subsection, the term “eligible entity” means—
- (A)
- (i) an electric utility, including—
- (I) a political subdivision of a State, such as a municipally owned electric utility; or
- (II) an instrumentality of a State composed of municipally owned electric utilities;
- (ii) an electric cooperative; or
- (iii) an investor-owned utility;
- (i) an electric utility, including—
- (B) an Indian Tribe or Tribal organization;
- (C) a State energy office;
- (D) an institution of higher education; and
- (E) a consortium of the entities described in subparagraphs (A) through (D).
- (A)
- (2)
- (A) Not later than September 30, 2023 , the Secretary shall, to the maximum extent practicable, enter into an agreement with an eligible entity to provide financial assistance to the eligible entity to carry out project design, transmission studies, power market assessments, and permitting for a pumped storage hydropower project to facilitate the long-duration storage of intermittent renewable electricity.
- (B) To be eligible for financial assistance under subparagraph (A), a project shall—
- (i) be designed to provide not less than 1,000 megawatts of storage capacity;
- (ii) be able to provide energy and capacity for use in more than 1 organized electricity market;
- (iii) be able to store electricity generated by intermittent renewable electricity projects located on Tribal land; and
- (iv) have received a preliminary permit from the Federal Energy Regulatory Commission.
- (C) An eligible entity receiving financial assistance under subparagraph (A) shall provide matching funds equal to or greater than the amount of financial assistance provided under that subparagraph.
- (3) There is authorized to be appropriated to carry out this subsection $2,000,000 for each of fiscal years 2022 through 2026.
- (1) In this subsection, the term “eligible entity” means—
- (f)
- (g) To the maximum extent practicable, the Secretary shall coordinate the activities under this section (including activities conducted pursuant to the amendments made by this section) among the offices and employees of the Department, other Federal agencies, and other relevant entities—
- (1) to ensure appropriate collaboration;
- (2) to avoid unnecessary duplication of those activities; and
- (3) to increase domestic manufacturing and production of energy storage systems, such as those within the Department and within the National Institute of Standards and Technology.
- (h) There are authorized to be appropriated—
- (1) to carry out subsection (b), $100,000,000 for each of fiscal years 2021 through 2025, to remain available until expended;
- (2) to carry out subsection (c), $71,000,000 for each of fiscal years 2021 through 2025, to remain available until expended; and
- (3) to carry out subsection (d), $30,000,000 for each of fiscal years 2021 through 2025, to remain available until expended.
Change History