Title 16, Chapter 12
Conservation — 214 active sections, 11 inactive
Table of Contents (225 sections)
- § 1 Southwestern area sale and transmission of electric power; disposition of receipts; creation of continuing fund; use of fund
- § 1 Approval of plans by Board as condition precedent to construction and operation; restraining action without approval; other laws unaffected
- § 1 Repealed. Pub. L. 88–426, title III, § 305(36) , Aug. 14, 1964 , 78 Stat. 427
- § 1 Taxation and assessments; applicability of State laws
- § 1 Construction of additional facilities by Secretary of Energy for mutually beneficial power sales between Pacific Northwest and California; contribution of funds by non-Federal entities
- § 1 Federal projects in Pacific Northwest
- § 2 Southeastern area sale and transmission of electric power; disposition of receipts; creation of continuing funds; use of fund
- § 2 Bonds; limitation of issuance under sections 831n and 831n–1
- § 2 Authorization of appropriations; establishment of Columbia Basin Land Development Account
- § 3 Southwestern area sale at uniform systemwide rates of electric power over transmission lines constructed with appropriated funds or used under contractual arrangements
- § 3 Use of funds; limitation of issuance
- § 3 Repealed. Pub. L. 87–728, § 3 , Oct. 1, 1962 , 76 Stat. 678
- § 4 Southwestern Power Administration; deposit and availability of advance payments
- § 4 Bonds for financing power program
- § 4 General powers of Secretary of the Interior; delegation to authorized representatives
- § 5 Southeastern Power Administration; deposit and availability of advance payments
- § 5 Repealed. Pub. L. 87–728, § 3 , Oct. 1, 1962 , 76 Stat. 678
- § 6 Southeastern Power Administration; deposit and availability of discretionary offsetting collections
- § 7 Southwestern Power Administration; deposit and availability of discretionary offsetting collections
- § 8 Southeastern Power Administration: rates of basic and premium pay
- § 791 Repealed. Aug. 26, 1935, ch. 687 , title II, § 212, 49 Stat. 847
- § 791a Short title
- § 792 Federal Power Commission; creation; number; appointment; term; qualifications; vacancies; quorum; chairman; salary; place of holding sessions
- § 793 Appointment of officers and employees of Commission; duties, and salaries; detail of officers and employees from other departments; expenditures authorized
- § 793a Repealed. Pub. L. 87–367, title I, § 103(5) , Oct. 4, 1961 , 75 Stat. 787
- § 795 Omitted
- § 796 Definitions
- § 797 General powers of Commission
- § 797a Congressional authorization for permits, licenses, leases, or authorizations for dams, conduits, reservoirs, etc., within national parks or monuments
- § 797b Duty to keep Congress fully and currently informed
- § 797c Dams in National Park System units
- § 797d Third party contracting by FERC
- § 798 Purpose and scope of preliminary permits; transfer and cancellation
- § 799 License; duration, conditions, revocation, alteration, or surrender
- § 800 Issuance of preliminary permits or licenses
- § 801 Transfer of license; obligations of transferee
- § 802 Information to accompany application for license; landowner notification
- § 803 Conditions of license generally
- § 804 Project works affecting navigable waters; requirements insertable in license
- § 805 Participation by Government in costs of locks, etc.
- § 806 Time limit for construction of project works; extension of time; termination or revocation of licenses for delay
- § 807 Right of Government to take over project works
- § 808 New licenses and renewals
- § 809 Temporary use by Government of project works for national safety; compensation for use
- § 810 Disposition of charges arising from licenses
- § 811 Operation of navigation facilities; rules and regulations; penalties
- § 812 Public-service licensee; regulations by State or by commission as to service, rates, charges, etc.
- § 813 Power entering into interstate commerce; regulation of rates, charges, etc.
- § 814 Exercise by licensee of power of eminent domain
- § 815 Contract to furnish power extending beyond period of license; obligations of new licensee
- § 816 Preservation of rights vested prior to June 10, 1920
- § 817 Projects not affecting navigable waters; necessity for Federal license, permit or right-of-way; unauthorized activities
- § 818 Public lands included in project; reservation of lands from entry
- § 819 Repealed. Aug. 26, 1935, ch. 687 , title II, § 212, 49 Stat. 847
- § 820 Proceedings for revocation of license or to prevent violations of license
- § 821 State laws and water rights unaffected
- § 822 Reservation of right to alter or repeal chapter
- § 823 Repeal of inconsistent laws
- § 823a Conduit hydroelectric facilities
- § 823b Enforcement
- § 823c Alaska State jurisdiction over small hydroelectric projects
- § 823d Alternative conditions and prescriptions
- § 823e Promoting hydropower development at existing nonpowered dams
- § 823f Closed-loop pumped storage projects
- § 823g Considerations for relicensing terms
- § 824 Declaration of policy; application of subchapter
- § 824a Interconnection and coordination of facilities; emergencies; transmission to foreign countries
- § 824b Disposition of property; consolidations; purchase of securities
- § 824c Issuance of securities; assumption of liabilities
- § 824d Rates and charges; schedules; suspension of new rates; automatic adjustment clauses
- § 824e Power of Commission to fix rates and charges; determination of cost of production or transmission
- § 824f Ordering furnishing of adequate service
- § 824g Ascertainment of cost of property and depreciation
- § 824h References to State boards by Commission
- § 824i Interconnection authority
- § 824j Wheeling authority
- § 824k Orders requiring interconnection or wheeling
- § 824l Information requirements
- § 824m Sales by exempt wholesale generators
- § 824n Repealed. Pub. L. 109–58, title XII, § 1232(e)(3) , Aug. 8, 2005 , 119 Stat. 957
- § 824o Electric reliability
- § 824p Siting of interstate electric transmission facilities
- § 824q Native load service obligation
- § 824r Protection of transmission contracts in the Pacific Northwest
- § 824s Transmission infrastructure investment
- § 824t Electricity market transparency rules
- § 824u Prohibition on filing false information
- § 824v Prohibition of energy market manipulation
- § 824w Joint boards on economic dispatch
- § 825 Accounts and records
- § 825a Rates of depreciation; notice to State authorities before fixing
- § 825b Requirements applicable to agencies of United States
- § 825c Periodic and special reports; obstructing filing reports or keeping accounts, etc.
- § 825d Officials dealing in securities
- § 825e Complaints
- § 825f Investigations by Commission
- § 825g Hearings; rules of procedure
- § 825h Administrative powers of Commission; rules, regulations, and orders
- § 825i Appointment of officers and employees; compensation
- § 825j Investigations relating to electric energy; reports to Congress
- § 825k Publication and sale of reports
- § 825l Review of orders
- § 825m Enforcement provisions
- § 825n Forfeiture for violations; recovery; applicability
- § 825o Penalties for violations; applicability of section
- § 825p Jurisdiction of offenses; enforcement of liabilities and duties
- § 825q Repealed. Pub. L. 109–58, title XII, § 1277(a) , Aug. 8, 2005 , 119 Stat. 978
- § 825r Separability
- § 825s Sale of electric power from reservoir projects; rate schedules; preference in sale; construction of transmission lines; disposition of moneys
- § 825t Utilization of power revenues
- § 825u Interest rate on power bonds held by Administrator of General Services
- § 828 Facilitation of development and construction of water conservation facilities; exemption from certain Federal requirements
- § 828a Definitions
- § 828b Exemption from formula, books and records, and project cost statement requirements; annual charges
- § 828c Applicability of this subchapter
- § 831 Creation; short title
- § 831a Membership, operation, and duties of the Board of Directors
- § 831aa Laws repealed
- § 831b Officers and employees; wages of laborers and mechanics; application of employees’ compensation provisions
- § 831bb Reservation of right to amend or repeal
- § 831c Corporate powers generally; eminent domain; construction of dams, transmission lines, etc.
- § 831cc Separability
- § 831d Directors; maintenance and operation of plant for production, sale, and distribution of fertilizer and power
- § 831dd Liberal construction of chapter; sale of surplus lands
- § 831e Officers and employees; nonpolitical appointment; removal for violation
- § 831ee Essential stewardship activities
- § 831f Control of plants and property vested in Corporation; transfer of other property to Corporation
- § 831g Principal office of Corporation; books; directors’ oath
- § 831h Annual financial statement; purchases and contracts; audit by Comptroller General
- § 831i Sale of surplus power; preferences; experimental work; acquisition of existing electric facilities
- § 831j Equitable distribution of surplus power among States and municipalities; improvement in production of fertilizer
- § 831k Transmission lines; construction or lease; sale of power over other than Government lines; rates when sold for resale at profit
- § 831l Financial assistance to States and local governments in lieu of taxation; apportionment; limitation on contracts for sale of power to municipalities; report to Congress
- § 831m Allocation and charge of value and cost of plants to particular objects; cost accounting; reports of costs of operation; sale of surplus power at profit
- § 831n Bonds for future construction; amount, terms, and conditions
- § 831o Completion of unfinished plants authorized
- § 831p Repealed. Pub. L. 89–554, § 8(a) , Sept. 6, 1966 , 80 Stat. 648
- § 831q Eminent domain; contracts for relocation of railroads, highways, industrial plants, etc.
- § 831r Patents; access to Patent and Trademark Office and right to copy patents; compensation to patentees
- § 831s Possession by Government in time of war; damages to contract holders
- § 831t Offenses; fines and punishment
- § 831u Surveys; cooperation with States or other agencies
- § 831v Legislation to carry out purposes of chapter; recommendation by President
- § 831w Acquisition of real or personal property; payment by delivery of power; sale or lease of vacant land for industrial purposes
- § 831x Condemnation proceedings; institution by Corporation; venue
- § 831y Net proceeds over expense payable into Treasury
- § 831z Authorization of appropriations
- § 832 Completion and maintenance of project; generation of electricity
- § 832a General administrative provisions
- § 832b Definitions
- § 832c Distribution of electricity; preference to public bodies and cooperatives
- § 832d Contracts for sale of electricity
- § 832e Rate schedules
- § 832f Elements in determining rates
- § 832g Purchase of supplies and services
- § 832h Miscellaneous administrative provisions
- § 832i Employment of personnel
- § 832j Deposit of receipts; authorization of appropriations
- § 832k Authority of Administrator
- § 832l Separability
- § 832m Sale of excess Federal power; fish and wildlife conservation within Federal Columbia River Power System; residential exchange; personnel flexibility
- § 833 Completion and maintenance of project; generation of electricity
- § 833a Administration of project
- § 833b Definitions
- § 833c Preference to public bodies and cooperatives
- § 833d Rate schedules; preparation, approval, and uniformity
- § 833e Factors in determining rate schedules
- § 833f Purchase of supplies and services
- § 833g Miscellaneous administrative provisions
- § 833h Personnel; appointment and compensation
- § 833i Deposit of receipts; establishment of continuing fund; authorization of appropriations
- § 833j Suits for and against project; legal representation
- § 833k Separability
- § 833l Acquisition of Indian lands
- § 833m Determination of compensation for acquisition of Indian lands; funds payable from; disposition of moneys
- § 833n Use of deposits by allottees; nontaxability of lands
- § 833o Authority of Secretary of the Interior for acquisition of Indian land
- § 833p Reversion of title
- § 833q Educational costs of dependents of employees; payments to school districts; reimbursement from continuing fund
- § 835 Project authorized; laws applicable
- § 835b Repealed. Pub. L. 87–728, § 3 , Oct. 1, 1962 , 76 Stat. 678
- § 835c Duties of Secretary of the Interior
- § 835d Acquisition of Indian lands, Spokane and Colville Reservations
- § 835e Payment for lands acquired from Spokane and Colville Reservations
- § 835f Use of funds deposited to allottees; land and improvements
- § 835g Relocation of Indian cemeteries
- § 835h Acts and regulations by Secretary of the Interior
- § 835i Contracts with State of Washington for maintenance and operation of fish hatcheries
- § 835j Projects marketing commercial power and energy; consolidated financial statement to President and Congress; adjustment of rates to assure return of reimbursable construction costs within prescribed period
- § 835k Return of construction costs from marketing revenues in event of inability of irrigation water users to repay within repayment period and lack of other sources of revenue
- § 835l Congressional declaration of financial policy; limitations on assistance; analyses and studies; “net revenues” defined
- § 835m Recommendations for changes in limitations on financial assistance; time and frequency of submission
- § 836 Authorization to license construction and operation; licensing conditions
- § 836a Rules governing issuance of license
- § 837 Definitions
- § 837a Limitation of sale, delivery, and exchange of electric energy and electric peaking capacity for use outside Pacific Northwest to surplus energy and surplus peaking capacity; notice to customers; inspection of contract drafts
- § 837b Contract terms and conditions for use of electric energy outside Pacific Northwest
- § 837c Contract limitations and conditions for use of electric energy and peaking capacity of plants in other marketing areas for use within Pacific Northwest
- § 837d Exchange contracts
- § 837e Transmission lines for other electric energy; rates
- § 837f Purchaser priority on Pacific Northwest power; amendment of existing contracts and new contracts to include priority provisions
- § 837g Transmission lines between Pacific Northwest and Pacific Southwest; prohibition against construction of lines or related facilities; exceptions of lines and facilities recommended by Secretary or authorized by Congress; authority of Secretary to construct other transmission lines unaffected
- § 837h Provisions not applicable to Canyon Ferry project or benefits and exchanges under Treaty between Canada and United States; preference of power users in Montana not modified
- § 838 Congressional findings; authority and duties of Secretary of Energy relating to Federal Columbia River Power System unaffected
- § 838a Definitions
- § 838b Operation and maintenance of Federal transmission system; construction of improvements, betterments, additions and replacements; criteria
- § 838c Acquisition by condemnation of transmission facilities
- § 838d Transmission of non-Federal power
- § 838e Acquisition of property
- § 838f Marketing of Federal power; sales agent
- § 838g Schedules of rates and charges for sale of Federal power and transmission of non-Federal power; confirmation and approval; criteria for modification and establishment
- § 838h Uniform schedules of rates and charges for sale of Federal power and transmission of non-Federal power; allocation of cost recovery
- § 838i Bonneville Power Administration fund
- § 838j Investment of excess moneys; deposit of moneys
- § 838k Bonneville Power Administration bonds
- § 838l Bonneville Power Administration refinancing
- § 839 Congressional declaration of purpose
- § 839a Definitions
- § 839b Regional planning and participation
- § 839c Sale of power
- § 839d Conservation and resource acquisition
- § 839e Rates
- § 839f Administrative provisions
- § 839g Savings provisions
- § 839h Separability
§ 825s–1. Southwestern area sale and transmission of electric power; disposition of receipts; creation of continuing fund; use of fund
All receipts from the transmission and sale of electric power and energy under the provisions of section 825s of this title , generated or purchased in the southwestern power area, shall be covered into the Treasury of the United States as miscellaneous receipts, except that the Treasury shall set up and maintain from such receipts a continuing fund of $300,000, including the sum of $100,000 in the continuing fund established under the Administrator of the Southwestern Power Administration in the First Supplemental National Defense Appropriation Act, 1944 ( 57 Stat. 621 ), which shall be transferred to the fund established; and said fund of $300,000 shall be placed to the credit of the Secretary and shall be subject to check by him to defray emergency expenses necessary to insure continuity of electric service and continuous operation of the facilities, and to cover all costs in connection with the purchase of electric power and energy and rentals for the use of facilities for the transmission and distribution of electric power and energy to public bodies, cooperatives, and privately owned companies: Provided , That expenditures from this fund to cover such costs in connection with the purchase of electric power and energy and rentals for the use of facilities are to be made only in such amounts as may be approved annually in appropriation Acts.
§ 831y–1. Approval of plans by Board as condition precedent to construction and operation; restraining action without approval; other laws unaffected
The unified development and regulation of the Tennessee River system requires that no dam, appurtenant works, or other obstruction, affecting navigation, flood control, or public lands or reservations shall be constructed, and thereafter operated or maintained across, along, or in the said river or any of its tributaries until plans for such construction, operation, and maintenance shall have been submitted to and approved by the Board; and the construction, commencement of construction, operation, or maintenance of such structures without such approval is prohibited. When such plans shall have been approved, deviation therefrom either before or after completion of such structures is prohibited unless the modification of such plans has previously been submitted to and approved by the Board. In the event the Board shall, within sixty days after their formal submission to the Board, fail to approve any plans or modifications, as the case may be, for construction, operation, or maintenance of any such structures on the Little Tennessee River, the above requirements shall be deemed satisfied, if upon application to the Secretary of the Army, with due notice to the Corporation, and hearing thereon, such plans or modifications are approved by the said Secretary of the Army as reasonably adequate and effective for the unified development and regulation of the Tennessee River system. Such construction, commencement of construction, operation, or maintenance of any structures or parts thereof in violation of the provisions of this section may be prevented, and the removal or discontinuation thereof required by the injunction or order of any district court exercising jurisdiction in any district in which such structures or parts thereof may be situated, and the Corporation is authorized to bring appropriate proceedings to this end. The requirements of this section shall not be construed to be a substitute for the requirements of any other law of the United States or of any State, now in effect or hereafter enacted, but shall be in addition thereto, so that any approval, license, permit, or other sanction now or hereafter required by the provisions of any such law for the construction, operation, or maintenance of any structures whatever, except such as may be constructed, operated, or maintained by the Corporation, shall be required, notwithstanding the provisions of this section.
§ 1. Repealed. Pub. L. 88–426, title III, § 305(36) , Aug. 14, 1964 , 78 Stat. 427
§ 832a–1. Repealed. Pub. L. 88–426, title III, § 305(36) , Aug. 14, 1964 , 78 Stat. 427
§ 835c–1. Taxation and assessments; applicability of State laws
- (a) The Secretary may enter into agreements to pay annual sums in lieu of taxes to any State or political subdivision thereof with respect to any real property situated therein after it is acquired pursuant to the authority of this Act and before execution by the United States of a contract of sale covering it, out of funds derived from the leasing of such lands. The amount so paid for any year upon any such property shall not exceed the taxes that would be paid to the State or subdivision as the case may be upon such property if it were not exempt from taxation thereby.
- (b) Any public lands within the project and any lands or interests in lands acquired by the United States under this Act, beginning at such date or dates and subject to such provisions and limitations as may be fixed or provided by regulations made under section 8 [ 16 U.S.C. 835c–4 ], shall be (i) subject to the provisions of the laws of the State of Washington relating to the organization, government, and regulation of irrigation, reclamation, and conservancy districts, and (ii) subject to legal assessment or taxation by any such district, and to liens for such assessments and taxes and to all proceedings for the enforcement thereof, in the same manner and to the same extent as privately owned lands of like character. The United States does not assume any obligation for amounts so assessed or taxed; and any proceedings to enforce them shall be subject to any title then remaining in the United States, to any prior lien reserved to the United States for unpaid installments under land sale contracts made under this Act, and to any lien for any other charges, accrued or unaccrued, under and by virtue of such contracts or any contract between the United States and the district in which the land is located.
- (c) In addition to taxation or assessment under subsection (b) upon execution by the United States of a contract of sale of any lands within the project, the lands under contract may be taxed by the State or political subdivision thereof in the same manner and to the same extent as privately owned lands of a like character. All taxes legally so assessed may be enforced in the same manner and under the same proceeding whereby said taxes are enforced against privately owned lands, subject to the limitations in favor of the United States that govern the enforcement of district assessments or taxes as provided in subsection (b). If lands under any such contract shall at any time revert to the United States before transfer of title under the contract by reason of default thereunder, all liens or tax titles resulting from taxes levied pursuant to the authority of this subsection upon such lands shall be thereupon extinguished; and the levying of any such tax by such State or political subdivision shall be deemed to be an agreement on its part, in the event of such reversion, to execute and record a formal release of such lien or tax title.
§ 837g–1. Construction of additional facilities by Secretary of Energy for mutually beneficial power sales between Pacific Northwest and California; contribution of funds by non-Federal entities
Notwithstanding the provisions of section 837g of this title , the Secretary of Energy is authorized to construct or participate in the construction of such additional facilities as he deems necessary to allow mutually beneficial power sales between the Pacific Northwest and California and to accept funds contributed by non-Federal entities for that purpose.
§ 839d–1. Federal projects in Pacific Northwest
Without further appropriation and without fiscal year limitation, the Secretaries of the Interior and Army are authorized to plan, design, construct, operate and maintain generation additions, improvements and replacements, at their respective Federal projects in the Pacific Northwest Region as defined in the Pacific Northwest Electric Power Planning and Conservation Act (Northwest Power Act), Public Law 96–501 ( 16 U.S.C. 839a(14) ), and to operate and maintain the respective Secretary’s power facilities in the Region, that the respective Secretary determines necessary or appropriate and that the Bonneville Power Administrator subsequently determines necessary or appropriate, with any funds that the Administrator determines to make available to the respective Secretary for such purposes. Each Secretary is authorized, without further appropriation, to accept and use such funds for such purposes: Provided , That, such funds shall continue to be exempt from sequestration pursuant to section 905(g)(1) of title 2 : Provided further , That this section shall not modify or affect the applicability of any provision of the Northwest Power Act [ 16 U.S.C. 839 et seq.]. This provision shall be effective on October 1, 1993 .
§ 825s–2. Southeastern area sale and transmission of electric power; disposition of receipts; creation of continuing funds; use of fund
All receipts from the transmission and sale of electric power and energy under the provisions of section 825s of this title , generated or purchased in the southeastern power area, shall be covered into the Treasury of the United States as miscellaneous receipts, except that the Treasury shall set up and maintain from such receipts a continuing fund of $50,000, and said fund shall be placed to the credit of the Secretary, and shall be subject to check by him to defray emergency expenses necessary to insure continuity of electric service and continuous operation of Government facilities in said area.
§ 831n–2. Bonds; limitation of issuance under sections 831n and 831n–1
No bonds shall be issued by the Corporation after the date of enactment of this section under section 831n or 831n–1 of this title.
§ 835c–2. Authorization of appropriations; establishment of Columbia Basin Land Development Account
There are authorized to be appropriated, out of any money in the Treasury not otherwise appropriated, such moneys as may be necessary to carry out the provisions of this Act, to be reimbursable to the extent required by this Act. All revenues received in carrying out the provisions of section 4 hereof [ 16 U.S.C. 835c ] shall be covered into the General Treasury as miscellaneous receipts. Amounts equal to appropriated funds requisitioned by the Secretary and made available for disbursement on the books of the Treasurer of the United States shall be debited in a special account in the Treasury, to be known as the Columbia Basin Land Development Account. Amounts equal to revenues covered into the General Treasury as miscellaneous receipts shall be credited in said special account. After such credits equal the amount of the debits with interest thereon at the rate of 3 per centum per annum from the respective dates of the debits, additional credits in said special account shall be made by the Secretary, in the manner determined by him, the basis of corresponding credits to the construction cost obligations of the district or districts entering into contracts for the repayment thereof.
§ 825s–3. Southwestern area sale at uniform systemwide rates of electric power over transmission lines constructed with appropriated funds or used under contractual arrangements
Power and energy marketed by the Southwestern Power Administration pursuant to section 825s of this title , shall be sold at uniform systemwide rates, without discrimination between customers to whom the Southwestern Power Administration delivers such power and energy by means of transmission lines or facilities constructed with appropriated funds, and customers to whom the Southwestern Power Administration delivers such power and energy by means of transmission lines or facilities, the use of which is acquired by lease, wheeling, or other contractual arrangements.
§ 831n–3. Use of funds; limitation of issuance
With the approval of the Secretary of the Treasury the Corporation is authorized, after the date of enactment of this section, to issue bonds not to exceed in the aggregate $61,500,000. Such bonds may be sold by the Corporation to obtain funds which may be used for the following purposes only:
- (1) Not to exceed $46,000,000 may be used for the purchase of electric utility properties of the Tennessee Electric Power Company and Southern Tennessee Power Company, as contemplated in the contract between the Corporation and the Commonwealth and Southern Corporation and others, dated as of May 12, 1939 .
- (2) Not to exceed $6,500,000 may be used for the purchase and rehabilitation of electric utility properties of the Alabama Power Company and Mississippi Power Company in the following named counties in northern Alabama and northern Mississippi: The counties of Jackson, Madison, Limestone, Lauderdale, Colbert, Lawrence, Morgan, Marshall, De Kalb, Cherokee, Cullman, Winston, Franklin, Marion, and Lamar in northern Alabama, and the counties of Calhoun, Chickasaw, Monroe, Clay, Lowndes, Oktibbeha, Choctaw, Webster, Noxubee, Winston, Neshoba, and Kemper in northern Mississippi.
- (3) Not to exceed $3,500,000 may be used for rebuilding, replacing, and repairing electric utility properties purchased by the Corporation in accordance with the foregoing provisions of this section.
- (4) Not to exceed $3,500,000 may be used for constructing electric transmission lines, substations, and other electrical facilities necessary to connect the electric utility properties purchased by the Corporation in accordance with the foregoing provisions of this section with the electric power system of the Corporation.
- (5) Not to exceed $2,000,000 may be used for making loans under section 831k–1 of this title to States, counties, municipalities, and nonprofit organizations to enable them to purchase any electric utility properties referred to in the contract between the Corporation and the Commonwealth and Southern Corporation and others, dated as of May 12, 1939 , or any electric utility properties of the Alabama Power Company or Mississippi Power Company in any of the counties in northern Alabama or northern Mississippi named in paragraph (2). The Corporation shall file with the President and with the Congress in December of each year a financial statement and complete report as to the expenditure of funds derived from the sale of bonds under this section covering the period not covered by any such previous statement or report. Such bonds shall be in such forms and denominations, shall mature within such periods not more than fifty years from the date of their issue, may be redeemable at the option of the Corporation before maturity in such manner as may be stipulated therein, shall bear such rates of interest not exceeding 3½ per centum per annum, shall be subject to such terms and conditions, shall be issued in such manner and amount, and sold at such prices, as may be prescribed by the Corporation with the approval of the Secretary of the Treasury: Provided , That such bonds shall not be sold at such prices or on such terms as to afford an investment yield to the holders in excess of 3½ per centum per annum. Such bonds shall be fully and unconditionally guaranteed both as to interest and principal by the United States, and such guaranty shall be expressed on the face thereof, and such bonds shall be lawful investments, and may be accepted as security, for all fiduciary, trust, and public funds, the investment or deposit of which shall be under the authority or control of the United States or any officer or officers thereof. In the event that the Corporation should not pay upon demand when due, the principal of, or interest on, such bonds, the Secretary of the Treasury shall pay to the holder the amount thereof, which is authorized to be appropriated out of any moneys in the Treasury not otherwise appropriated, and thereupon to the extent of the amount so paid the Secretary of the Treasury shall succeed to all the rights of the holders of such bonds. The Secretary of the Treasury, in his discretion, is authorized to purchase any bonds issued hereunder, and for such purpose the Secretary of the Treasury is authorized to use as a public-debt transaction the proceeds from the sale of any securities hereafter issued under chapter 31 of title 31, and the purposes for which securities may be issued under such chapter are extended to include any purchases of the Corporation’s bonds hereunder. The Secretary of the Treasury may, at any time, sell any of the bonds of the Corporation acquired by him under this section. All redemptions, purchases, and sales by the Secretary of the Treasury of the bonds of the Corporation shall be treated as public-debt transactions of the United States. With the approval of the Secretary of the Treasury, the Corporation shall have power to purchase such bonds in the open market at any time and at any price. None of the proceeds of the bonds shall be used for the performance of any proposed contract negotiated by the Corporation under the authority of section 831k–1 of this title until the proposed contract shall have been submitted to and approved by the Federal Power Commission. When any such proposed contract shall have been submitted to the said Commission, the matter shall be given precedence and shall be in every way expedited and the Commission’s determination of the matter shall be final. The authority of the Corporation to issue bonds under this section shall expire January 1, 1941 , except that if at the time such authority expires the amount of bonds issued by the Corporation under this section is less than $61,500,000, the Corporation may, subject to the foregoing provisions of this section, issue, after the expiration of such period, bonds in an amount not in excess of the amount by which the bonds so issued prior to the expiration of such period is less than $61,500,000, for refunding purposes, or, subject to the provisions of paragraph (5) of this section (limiting the purposes for which loans under section 831k–1 of this title of funds derived from bonds proceeds may be made) to provide funds found necessary in the performance of any contract entered into by the Corporation prior to the expiration of such period, under the authority of section 831k–1 of this title .
§ 835c–3. Repealed. Pub. L. 87–728, § 3 , Oct. 1, 1962 , 76 Stat. 678
§ 825s–4. Southwestern Power Administration; deposit and availability of advance payments
Notwithstanding section 3302 of title 31 , beginning in fiscal year 2005 and thereafter, such funds as are received by the Southwestern Power Administration from any State, municipality, corporation, association, firm, district, or individual as advance payment for work that is associated with Southwestern’s transmission facilities, consistent with that authorized in section 825s of this title , shall be credited to this account and be available until expended.
§ 831n–4. Bonds for financing power program
- (a) The Corporation is authorized to issue and sell bonds, notes, and other evidences of indebtedness (hereinafter collectively referred to as “bonds”) in an amount not exceeding $30,000,000,000 outstanding at any one time to assist in financing its power program and to refund such bonds. The Corporation may, in performing functions authorized by this chapter, use the proceeds of such bonds for the construction, acquisition, enlargement, improvement, or replacement of any plant or other facility used or to be used for the generation or transmission of electric power (including the portion of any multiple-purpose structure used or to be used for power generation); as may be required in connection with the lease, lease-purchase, or any contract for the power output of any such plant or other facility; and for other purposes incidental thereto. Unless otherwise specifically authorized by Act of Congress the Corporation shall make no contracts for the sale or delivery of power which would have the effect of making the Corporation or its distributors, directly or indirectly, a source of power supply outside the area for which the Corporation or its distributors were the primary source of power supply on July 1, 1957 , and such additional area extending not more than five miles around the periphery of such area as may be necessary to care for the growth of the Corporation and its distributors within said area: Provided, however , That such additional area shall not in any event increase by more than 2½ per centum (or two thousand square miles, whichever is the lesser) the area for which the Corporation and its distributors were the primary source of power supply on July 1, 1957 : And provided further , That no part of such additional area may be in a State not now served by the Corporation or its distributors or in a municipality receiving electric service from another source on or after July 1, 1957 , and no more than five hundred square miles of such additional area may be in any one State now served by the Corporation or its distributors. Nothing in this subsection shall prevent the Corporation or its distributors from supplying electric power to any customer within any area in which the Corporation or its distributors had generally established electric service on July 1, 1957 , and to which electric service was not being supplied from any other source on the effective date of this Act. Nothing in this subsection shall prevent the Corporation, when economically feasible, from making exchange power arrangements with other power-generating organizations with which the Corporation had such arrangements on July 1, 1957 , nor prevent the Corporation from continuing to supply power to Dyersburg, Tennessee, and Covington, Tennessee, or from entering into contracts to supply or from supplying power to the cities of Paducah, Kentucky; Princeton, Kentucky; Glasgow, Kentucky; Fulton, Kentucky; Monticello, Kentucky; Hickman, Kentucky; Chickamauga, Georgia; Ringgold, Georgia; Oak Ridge, Tennessee; and South Fulton, Tennessee; or agencies thereof; or from entering into contracts to supply or from supplying power for the Naval Auxiliary Air Station in Lauderdale and Kemper Counties, Mississippi, through the facilities of the East Mississippi Electric Power Association: Provided further , That nothing herein contained shall prevent the transmission of TVA power to the Atomic Energy Commission or the Department of Defense or any agency thereof, on certification by the President of the United States that an emergency defense need for such power exists. Nothing in this chapter shall affect the present rights of the parties in any existing lawsuits involving efforts of towns in the same general area where TVA power is supplied to obtain TVA power. The principal of and interest on said bonds shall be payable solely from the Corporation’s net power proceeds as hereinafter defined. Net power proceeds are defined for purposes of this section as the remainder of the Corporation’s gross power revenues after deducting the costs of operating, maintaining, and administering its power properties (including costs applicable to that portion of its multiple-purpose properties allocated to power) and payments to States and counties in lieu of taxes but before deducting depreciation accruals or other charges representing the amortization of capital expenditures, plus the net proceeds of the sale or other disposition of any power facility or interest therein, and shall include reserve or other funds created from such sources. Notwithstanding the provisions of section 831y of this title or any other provision of law, the Corporation may pledge and use its net power proceeds for payment of the principal of and interest on said bonds, for purchase or redemption thereof, and for other purposes incidental thereto, including creation of reserve funds and other funds which may be similarly pledged and used, to such extent and in such manner as it may deem necessary or desirable. The Corporation is authorized to enter into binding covenants with the holders of said bonds—and with the trustee, if any—under any indenture, resolution, or other agreement entered into in connection with the issuance thereof (any such agreement being hereinafter referred to as a “bond contract”) with respect to the establishment of reserve funds and other funds, adequacy of charges for supply of power, application and use of net power proceeds, stipulations concerning the subsequent issuance of bonds or the execution of leases or lease-purchase agreements relating to power properties, and such other matters, not inconsistent with this chapter, as the Corporation may deem necessary or desirable to enhance the marketability of said bonds. The issuance and sale of bonds by the Corporation and the expenditure of bond proceeds for the purposes specified herein, including the addition of generating units to existing power-producing projects and the construction of additional power-producing projects, shall not be subject to the requirements or limitations of any other law.
- (b) Bonds issued by the Corporation hereunder shall not be obligations of, nor shall payment of the principal thereof or interest thereon be guaranteed by, the United States. Proceeds realized by the Corporation from issuance of such bonds and from power operations and the expenditure of such proceeds shall not be subject to apportionment under the provisions of subchapter II of chapter 15 of title 31.
- (c) Bonds issued by the Corporation under this section shall be negotiable instruments unless otherwise specified therein, shall be in such forms and denominations, shall be sold at such times and in such amounts, shall mature at such time or times not more than fifty years from their respective dates, shall be sold at such prices, shall bear such rates of interest, may be redeemable before maturity at the option of the Corporation in such manner and at such times and redemption premiums, may be entitled to such relative priorities of claim on the Corporation’s net power proceeds with respect to principal and interest payments, and shall be subject to such other terms and conditions, as the Corporation may determine: Provided , That at least fifteen days before selling each issue of bonds hereunder (exclusive of any commitment shorter than one year) the Corporation shall advise the Secretary of the Treasury as to the amount, proposed date of sale, maturities, terms and conditions and expected rates of interest of the proposed issue in the fullest detail possible and, if the Secretary shall so request, shall consult with him or his designee thereon, but the sale and issuance of such bonds shall not be subject to approval by the Secretary of the Treasury except as to the time of issuance and the maximum rates of interest to be borne by the bonds: Provided further , That if the Secretary of the Treasury does not approve a proposed issue of bonds hereunder within seven working days following the date on which he is advised of the proposed sale, the Corporation may issue to the Secretary interim obligations in the amount of the proposed issue, which the Secretary is directed to purchase. In case the Corporation determines that a proposed issue of bonds hereunder cannot be sold on reasonable terms, it may issue to the Secretary interim obligations which the Secretary is authorized to purchase. Notwithstanding the foregoing provisions of this subsection, obligations issued by the Corporation to the Secretary shall not exceed $150,000,000 outstanding at any one time, shall mature on or before one year from date of issue, and shall bear interest equal to the average rate (rounded to the nearest one-eighth of a percent) on outstanding marketable obligations of the United States with maturities from dates of issue of one year or less as of the close of the month preceding the issuance of the obligations of the Corporation. If agreement is not reached within eight months concerning the issuance of any bonds which the Secretary has failed to approve, the Corporation may nevertheless proceed to sell such bonds on any date thereafter without approval by the Secretary in amount sufficient to retire the interim obligations issued to the Treasury and such interim obligations shall be retired from the proceeds of such bonds. For the purpose of any purchase of the Corporation’s obligations the Secretary of the Treasury is authorized to use as a public debt transaction the proceeds from the sale of any securities issued under chapter 31 of title 31, and the purposes for which securities may be issued under chapter 31 of title 31 are extended to include any purchases of the Corporation’s obligations hereunder. The Corporation may sell its bonds by negotiation or on the basis of competitive bids, subject to the right, if reserved, to reject all bids; may designate trustees, registrars, and paying agents in connection with said bonds and the issuance thereof; may arrange for audits of its accounts and for reports concerning its financial condition and operations by certified public accounting firms (which audits and reports shall be in addition to those required by sections 9105 and 9106 of title 31, 1 1 So in original. The comma probably should be “);”. may, subject to any covenants contained in any bond contract, invest the proceeds of any bonds and other funds under its control which derive from or pertain to its power program in any securities approved for investment of national bank funds and deposit said proceeds and other funds, subject to withdrawal by check or otherwise, in any Federal Reserve Bank or bank having membership in the Federal Reserve System; and may perform such other acts not prohibited by law as it deems necessary or desirable to accomplish the purposes of this section. Bonds issued by the Corporation hereunder shall contain a recital that they are issued pursuant to this section, and such recital shall be conclusive evidence of the regularity of the issuance and sale of such bonds and of their validity. The annual report of the Board filed pursuant to section 831h of this title shall contain a detailed statement of the operation of the provisions of this section during the year.
- (d) Bonds issued by the Corporation hereunder shall be lawful investments and may be accepted as security for all fiduciary, trust, and public funds, the investment or deposit of which shall be under the authority or control of any officer or agency of the United States. The Secretary of the Treasury or any other officer or agency having authority over or control of any such fiduciary, trust, or public funds, may at any time sell any of the bonds of the Corporation acquired by them under this section. Bonds issued by the Corporation hereunder shall be exempt both as to principal and interest from all taxation now or hereafter imposed by any State or local taxing authority except estate, inheritance, and gift taxes.
- (e) From net power proceeds in excess of those required to meet the Corporation’s obligations under the provisions of any bond or bond contract, the Corporation shall, beginning with fiscal year 1961, make payments into the Treasury as miscellaneous receipts on or before September 30, of each fiscal year as a return on the appropriation investment in the Corporation’s power facilities, plus a repayment sum of not less than $10,000,000 for each of the first five fiscal years, $15,000,000 for each of the next five fiscal years, and $20,000,000 for each fiscal year thereafter, which repayment sum shall be applied to reduction of said appropriation investment until a total of $1,000,000,000 of said appropriation investment shall have been repaid. The said appropriation investment shall consist, in any fiscal year, of that part of the Corporation’s total investment assigned to power as of the beginning of the fiscal year (including both completed plant and construction in progress) which has been provided from appropriations or by transfers of property from other Government agencies without reimbursement by the Corporation, less repayments of such appropriation investment made under title II of the Government Corporations Appropriation Act, 1948, this chapter, or other applicable legislation. The payment as a return on the appropriation investment in each fiscal year shall be equal to the computed average interest rate payable by the Treasury upon its total marketable public obligations as of the beginning of said fiscal year applied to said appropriation investment. Payments due hereunder may be deferred for not more than two years when, in the judgment of the Board of Directors of the Corporation, such payments cannot feasibly be made because of inadequacy of funds occasioned by drought, poor business conditions, emergency replacements, or other factors beyond the control of the Corporation.
- (f) The Corporation shall charge rates for power which will produce gross revenues sufficient to provide funds for operation, maintenance, and administration of its power system; payments to States and counties in lieu of taxes; debt service on outstanding bonds, including provision and maintenance of reserve funds and other funds established in connection therewith; payments to the Treasury as a return on the appropriation investment pursuant to subsection (e) hereof; payment to the Treasury of the repayment sums specified in subsection (e) hereof; and such additional margin as the Board may consider desirable for investment in power system assets, retirement of outstanding bonds in advance of maturity, additional reduction of appropriation investment, and other purposes connected with the Corporation’s power business, having due regard for the primary objectives of the chapter, including the objective that power shall be sold at rates as low as are feasible. In order to protect the investment of holders of the Corporation’s securities and the appropriation investment as defined in subsection (e) hereof, the Corporation, during each successive five-year period beginning with the five-year period which commences on July 1 of the first full fiscal year after the effective date of this section, shall apply net power proceeds either in reduction (directly or through payments into reserve or sinking funds) of its capital obligations, including bonds and the appropriation investment, or to reinvestment in power assets, at least to the extent of the combined amount of the aggregate of the depreciation accruals and other charges representing the amortization of capital expenditures applicable to its power properties plus the net proceeds realized from any disposition of power facilities in said period. As of October 1, 1975 , the five-year periods described herein shall be computed as beginning on October 1 of that year and of each fifth year thereafter.
- (g) Power generating and related facilities operated by the Corporation under lease and lease-purchase agreements shall constitute power property held by the Corporation within the meaning of section 831 l of this title, but that portion of the payment due for any fiscal year under said section 831 l of this title to a State where such facilities are located which is determined or estimated by the Board to result from holding such facilities or selling electric energy generated thereby shall be reduced by the amount of any taxes or tax equivalents applicable to such fiscal year paid by the owners or others on account of said facilities to said State and to local taxing jurisdictions therein. In connection with the construction of a generating plant or other facilities under an agreement providing for lease or purchase of said facilities or any interest therein by or on behalf of the Corporation, or for the purchase of the output thereof, the Corporation may convey, in the name of the United States by deed, lease, or otherwise, any real property in its possession or control, may perform necessary engineering and construction work and other services, and may enter into any necessary contractual arrangements.
- (h) It is declared to be the intent of this section to aid the Corporation in discharging its responsibility for the advancement of the national defense and the physical, social and economic development of the area in which it conducts its operations by providing it with adequate authority and administrative flexibility to obtain the necessary funds with which to assure an ample supply of electric power for such purposes by issuance of bonds and as otherwise provided herein, and this section shall be construed to effectuate such intent.
§ 835c–4. General powers of Secretary of the Interior; delegation to authorized representatives
The Secretary is authorized to perform such acts, to make such rules and regulations, and to include in contracts relating to the Columbia Basin project such provisions as he deems proper for carrying out the provisions of this Act; and in connection with sales or exchanges under the Act, he is authorized to effect conveyances without regard to the law governing the patenting of public lands. Wherever in this Act functions, powers, or duties are conferred upon the Secretary, said functions, powers, or duties may be performed, exercised, or discharged by his duly authorized representatives.
§ 825s–5. Southeastern Power Administration; deposit and availability of advance payments
Notwithstanding the provisions of section 3302 of title 31 , beginning in fiscal year 2008 and thereafter, such funds as are received by the Southeastern Power Administration from any State, municipality, corporation, association, firm, district, or individual as advance payment for work that is associated with Southeastern’s Operations and Maintenance, consistent with that authorized in section 825s of this title , shall be credited to this account and be available until expended.
§ 835c–5. Repealed. Pub. L. 87–728, § 3 , Oct. 1, 1962 , 76 Stat. 678
§ 825s–6. Southeastern Power Administration; deposit and availability of discretionary offsetting collections
Notwithstanding the provisions of section 3302 of title 31 and section 825s of this title , all funds collected by the Southeastern Power Administration that are applicable to the repayment of the annual expenses of this account in this and subsequent fiscal years shall be credited to this account as discretionary offsetting collections for the sole purpose of funding such expenses, with such funds remaining available until expended: Provided further , That for purposes of this appropriation, annual expenses means expenditures that are generally recovered in the same year that they are incurred (excluding purchase power and wheeling expenses).
§ 825s–7. Southwestern Power Administration; deposit and availability of discretionary offsetting collections
Notwithstanding section 3302 of title 31 and section 825s of this title , all funds collected by the Southwestern Power Administration that are applicable to the repayment of the annual expenses of this account in this and subsequent fiscal years shall be credited to this account as discretionary offsetting collections for the sole purpose of funding such expenses, with such funds remaining available until expended: Provided further , That for purposes of this appropriation, annual expenses means expenditures that are generally recovered in the same year that they are incurred (excluding purchase power and wheeling expenses).
§ 825s–8. Southeastern Power Administration: rates of basic and premium pay
During fiscal year 2020 and each fiscal year thereafter, notwithstanding any provision of title 5 relating to classification or rates of pay, the Southeastern Power Administration shall pay any power system dispatcher employed by the Administration a rate of basic pay and premium pay based on those prevailing for similar occupations in the electric power industry. Basic pay and premium pay may not be paid under this section to any individual during a calendar year so as to result in a total rate in excess of the rate of basic pay for level V of the Executive Schedule (section 5316 of such title).
§ 791. Repealed. Aug. 26, 1935, ch. 687 , title II, § 212, 49 Stat. 847
§ 791a. Short title
This chapter may be cited as the “Federal Power Act”.
§ 792. Federal Power Commission; creation; number; appointment; term; qualifications; vacancies; quorum; chairman; salary; place of holding sessions
A commission is created and established to be known as the Federal Power Commission (hereinafter referred to as the “commission”) which shall be composed of five commissioners who shall be appointed by the President, by and with the advice and consent of the Senate, one of whom shall be designated by the President as chairman and shall be the principal executive officer of the commission. Each chairman, when so designated, shall act as such until the expiration of his term of office. The commissioners first appointed under this section, as amended, shall continue in office for terms of one, two, three, four, and five years, respectively, from June 23, 1930 , the term of each to be designated by the President at the time of nomination. Their successors shall be appointed each for a term of five years from the date of the expiration of the term for which his predecessor was appointed and until his successor is appointed and has qualified, except that he shall not so continue to serve beyond the expiration of the next session of Congress subsequent to the expiration of said fixed term of office, and except that any person appointed to fill a vacancy occurring prior to the expiration of the term for which his predecessor was appointed shall be appointed only for the unexpired term. Not more than three of the commissioners shall be appointed from the same political party. No person in the employ of or holding any official relation to any licensee or to any person, firm, association, or corporation engaged in the generation, transmission, distribution, or sale of power, or owning stock or bonds thereof, or who is in any manner pecuniarily interested therein, shall enter upon the duties of or hold the office of commissioners. Said commissioners shall not engage in any other business, vocation, or employment. No vacancy in the commission shall impair the right of the remaining commissioners to exercise all the powers of the commission. Three members of the commission shall constitute a quorum for the transaction of business, and the commission shall have an official seal of which judicial notice shall be taken. The commission shall annually elect a vice chairman to act in case of the absence or disability of the chairman or in case of a vacancy in the office of chairman. Each commissioner shall receive necessary traveling and subsistence expenses, or per diem allowance in lieu thereof, within the limitation prescribed by law, while away from the seat of government upon official business. The principal office of the commission shall be in the District of Columbia, where its general sessions shall be held; but whenever the convenience of the public or of the parties may be promoted or delay or expense prevented thereby, the commission may hold special sessions in any part of the United States.
§ 793. Appointment of officers and employees of Commission; duties, and salaries; detail of officers and employees from other departments; expenditures authorized
The commission shall have authority to appoint, prescribe the duties, and fix the salaries of, a secretary, a chief engineer, a general counsel, a solicitor, and a chief accountant; and may, subject to the civil service laws, appoint such other officers and employees as are necessary in the execution of its functions and fix their salaries in accordance with chapter 51 and subchapter III of chapter 53 of title 5. The commission may request the President to detail an officer or officers from the Corps of Engineers, or other branches of the United States Army, to serve the commission as engineer officer or officers, or in any other capacity, in field work outside the seat of government, their duties to be prescribed by the commission; and such detail is authorized. The President may also, at the request of the commission, detail, assign, or transfer to the commission, engineers in or under the Departments of the Interior or Agriculture for field work outside the seat of government under the direction of the commission. The commission may make such expenditures (including expenditures for rent and personal services at the seat of government and elsewhere, for law books, periodicals, and books of reference, and for printing and binding) as are necessary to execute its functions. Expenditures by the commission shall be allowed and paid upon the presentation of itemized vouchers therefor, approved by the chairman of the commission or by such other member or officer as may be authorized by the commission for that purpose subject to applicable regulations under chapters 1 to 11 of title 40 and division C (except sections 3302, 3306(f), 3307(e), 3501(b), 3509, 3906, 4104, 4710, and 4711) of subtitle I of title 41.
§ 793a. Repealed. Pub. L. 87–367, title I, § 103(5) , Oct. 4, 1961 , 75 Stat. 787
§ 793a. Repealed. Pub. L. 87–367, title I, § 103(5) , Oct. 4, 1961 , 75 Stat. 787
§ 795. Omitted
§§ 794, 795. Omitted
§ 796. Definitions
The words defined in this section shall have the following meanings for purposes of this chapter, to wit:
- (1) “public lands” means such lands and interest in lands owned by the United States as are subject to private appropriation and disposal under public land laws. It shall not include “reservations”, as hereinafter defined;
- (2) “reservations” means national forests, tribal lands embraced within Indian reservations, military reservations, and other lands and interests in lands owned by the United States, and withdrawn, reserved, or withheld from private appropriation and disposal under the public land laws; also lands and interests in lands acquired and held for any public purposes; but shall not include national monuments or national parks;
- (3) “corporation” means any corporation, joint-stock company, partnership, association, business trust, organized group of persons, whether incorporated or not, or a receiver or receivers, trustee or trustees of any of the foregoing. It shall not include “municipalities” as hereinafter defined;
- (4) “person” means an individual or a corporation;
- (5) “licensee” means any person, State, or municipality licensed under the provisions of section 797 of this title , and any assignee or successor in interest thereof;
- (6) “State” means a State admitted to the Union, the District of Columbia, and any organized Territory of the United States;
- (7) “municipality” means a city, county, irrigation district, drainage district, or other political subdivision or agency of a State competent under the laws thereof to carry on the business of developing, transmitting, utilizing, or distributing power;
- (8) “navigable waters” means those parts of streams or other bodies of water over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States, and which either in their natural or improved condition notwithstanding interruptions between the navigable parts of such streams or waters by falls, shallows, or rapids compelling land carriage, are used or suitable for use for the transportation of persons or property in interstate or foreign commerce, including therein all such interrupting falls, shallows, or rapids, together with such other parts of streams as shall have been authorized by Congress for improvement by the United States or shall have been recommended to Congress for such improvement after investigation under its authority;
- (9) “municipal purposes” means and includes all purposes within municipal powers as defined by the constitution or laws of the State or by the charter of the municipality;
- (10) “Government dam” means a dam or other work constructed or owned by the United States for Government purposes with or without contribution from others;
- (11) “project” means complete unit of improvement or development, consisting of a power house, all water conduits, all dams and appurtenant works and structures (including navigation structures) which are a part of said unit, and all storage, diverting, or forebay reservoirs directly connected therewith, the primary line or lines transmitting power therefrom to the point of junction with the distribution system or with the interconnected primary transmission system, all miscellaneous structures used and useful in connection with said unit or any part thereof, and all water-rights, rights-of-way, ditches, dams, reservoirs, lands, or interest in lands the use and occupancy of which are necessary or appropriate in the maintenance and operation of such unit;
- (12) “project works” means the physical structures of a project;
- (13) “net investment” in a project means the actual legitimate original cost thereof as defined and interpreted in the “classification of investment in road and equipment of steam roads, issue of 1914, Interstate Commerce Commission”, plus similar costs of additions thereto and betterments thereof, minus the sum of the following items properly allocated thereto, if and to the extent that such items have been accumulated during the period of the license from earnings in excess of a fair return on such investment: (a) Unappropriated surplus, (b) aggregate credit balances of current depreciation accounts, and (c) aggregate appropriations of surplus or income held in amortization, sinking fund, or similar reserves, or expended for additions or betterments or used for the purposes for which such reserves were created. The term “cost” shall include, insofar as applicable, the elements thereof prescribed in said classification, but shall not include expenditures from funds obtained through donations by States, municipalities, individuals, or others, and said classification of investment of the Interstate Commerce Commission shall insofar as applicable be published and promulgated as a part of the rules and regulations of the Commission;
- (14) “Commission” and “Commissioner” means the Federal Power Commission, and a member thereof, respectively;
- (15) “State commission” means the regulatory body of the State or municipality having jurisdiction to regulate rates and charges for the sale of electric energy to consumers within the State or municipality;
- (16) “security” means any note, stock, treasury stock, bond, debenture, or other evidence of interest in or indebtedness of a corporation subject to the provisions of this chapter;
- (17)
- (A) “small power production facility” means a facility which is an eligible solar, wind, waste, or geothermal facility, or a facility which—
- (i) produces electric energy solely by the use, as a primary energy source, of biomass, waste, renewable resources, geothermal resources, or any combination thereof; and
- (ii) has a power production capacity which, together with any other facilities located at the same site (as determined by the Commission), is not greater than 80 megawatts;
- (B) “primary energy source” means the fuel or fuels used for the generation of electric energy, except that such term does not include, as determined under rules prescribed by the Commission, in consultation with the Secretary of Energy—
- (i) the minimum amounts of fuel required for ignition, startup, testing, flame stabilization, and control uses, and
- (ii) the minimum amounts of fuel required to alleviate or prevent—
- (I) unanticipated equipment outages, and
- (II) emergencies, directly affecting the public health, safety, or welfare, which would result from electric power outages;
- (C) “qualifying small power production facility” means a small power production facility that the Commission determines, by rule, meets such requirements (including requirements respecting fuel use, fuel efficiency, and reliability) as the Commission may, by rule, prescribe;
- (D) “qualifying small power producer” means the owner or operator of a qualifying small power production facility;
- (E) “eligible solar, wind, waste or geothermal facility” means a facility which produces electric energy solely by the use, as a primary energy source, of solar energy, wind energy, waste resources or geothermal resources; but only if—
- (i) either of the following is submitted to the Commission not later than December 31, 1994 :
- (I) an application for certification of the facility as a qualifying small power production facility; or
- (II) notice that the facility meets the requirements for qualification; and
- (ii) construction of such facility commences not later than December 31, 1999 , or, if not, reasonable diligence is exercised toward the completion of such facility taking into account all factors relevant to construction of the facility. 1 1 So in original. The period probably should be a semicolon.
- (i) either of the following is submitted to the Commission not later than December 31, 1994 :
- (A) “small power production facility” means a facility which is an eligible solar, wind, waste, or geothermal facility, or a facility which—
- (18)
- (A) “cogeneration facility” means a facility which produces—
- (i) electric energy, and
- (ii) steam or forms of useful energy (such as heat) which are used for industrial, commercial, heating, or cooling purposes;
- (B) “qualifying cogeneration facility” means a cogeneration facility that the Commission determines, by rule, meets such requirements (including requirements respecting minimum size, fuel use, and fuel efficiency) as the Commission may, by rule, prescribe;
- (C) “qualifying cogenerator” means the owner or operator of a qualifying cogeneration facility;
- (A) “cogeneration facility” means a facility which produces—
- (19) “Federal power marketing agency” means any agency or instrumentality of the United States (other than the Tennessee Valley Authority) which sells electric energy;
- (20) “evidentiary hearings” and “evidentiary proceeding” mean a proceeding conducted as provided in sections 554, 556, and 557 of title 5;
- (21) “State regulatory authority” has the same meaning as the term “State commission”, except that in the case of an electric utility with respect to which the Tennessee Valley Authority has ratemaking authority (as defined in section 2602 of this title ), such term means the Tennessee Valley Authority;
- (22)
- (A) The term “electric utility” means a person or Federal or State agency (including an entity described in section 824(f) of this title ) that sells electric energy. 1
- (B) The term “electric utility” includes the Tennessee Valley Authority and each Federal power marketing administration. 1
- (23) The term “transmitting utility” means an entity (including an entity described in section 824(f) of this title ) that owns, operates, or controls facilities used for the transmission of electric energy—
- (A) in interstate commerce;
- (B) for the sale of electric energy at wholesale. 1
- (24) The term “wholesale transmission services” means the transmission of electric energy sold, or to be sold, at wholesale in interstate commerce. 1
- (25) The term “exempt wholesale generator” shall have the meaning provided by section 79z–5a 2 2 See References in Text note below. of title 15. 1
- (26) The term “electric cooperative” means a cooperatively owned electric utility. 1
- (27) The term “Regional Transmission Organization” or “RTO” means an entity of sufficient regional scope approved by the Commission—
- (A) to exercise operational or functional control of facilities used for the transmission of electric energy in interstate commerce; and
- (B) to ensure nondiscriminatory access to the facilities. 1
- (28) The term “Independent System Operator” or “ISO” means an entity approved by the Commission—
- (A) to exercise operational or functional control of facilities used for the transmission of electric energy in interstate commerce; and
- (B) to ensure nondiscriminatory access to the facilities. 3 3 So in original. The period probably should be “; and”.
- (29) The term “Transmission Organization” means a Regional Transmission Organization, Independent System Operator, independent transmission provider, or other transmission organization finally approved by the Commission for the operation of transmission facilities.
§ 797. General powers of Commission
The Commission is authorized and empowered—
- (a) To make investigations and to collect and record data concerning the utilization of the water resources of any region to be developed, the water-power industry and its relation to other industries and to interstate or foreign commerce, and concerning the location, capacity, development costs, and relation to markets of power sites, and whether the power from Government dams can be advantageously used by the United States for its public purposes, and what is a fair value of such power, to the extent the Commission may deem necessary or useful for the purposes of this chapter.
- (b) To determine the actual legitimate original cost of and the net investment in a licensed project, and to aid the Commission in such determinations, each licensee shall, upon oath, within a reasonable period of time to be fixed by the Commission, after the construction of the original project or any addition thereto or betterment thereof, file with the Commission in such detail as the Commission may require, a statement in duplicate showing the actual legitimate original cost of construction of such project addition, or betterment, and of the price paid for water rights, rights-of-way, lands, or interest in lands. The licensee shall grant to the Commission or to its duly authorized agent or agents, at all reasonable times, free access to such project, addition, or betterment, and to all maps, profiles, contracts, reports of engineers, accounts, books, records, and all other papers and documents relating thereto. The statement of actual legitimate original cost of said project, and revisions thereof as determined by the Commission, shall be filed with the Secretary of the Treasury.
- (c) To cooperate with the executive departments and other agencies of State or National Governments in such investigations; and for such purpose the several departments and agencies of the National Government are authorized and directed upon the request of the Commission, to furnish such records, papers, and information in their possession as may be requested by the Commission, and temporarily to detail to the Commission such officers or experts as may be necessary in such investigations.
- (d) To make public from time to time the information secured hereunder, and to provide for the publication of its reports and investigations in such form and manner as may be best adapted for public information and use. The Commission, on or before the 3d day of January of each year, shall submit to Congress for the fiscal year preceding a classified report showing the permits and licenses issued under this subchapter, and in each case the parties thereto, the terms prescribed, and the moneys received if any, or account thereof.
- (e) To issue licenses to citizens of the United States, or to any association of such citizens, or to any corporation organized under the laws of the United States or any State thereof, or to any State or municipality for the purpose of constructing, operating, and maintaining dams, water conduits, reservoirs, power houses, transmission lines, or other project works necessary or convenient for the development and improvement of navigation and for the development, transmission, and utilization of power across, along, from, or in any of the streams or other bodies of water over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States, or upon any part of the public lands and reservations of the United States (including the Territories), or for the purpose of utilizing the surplus water or water power from any Government dam, except as herein provided: Provided , That licenses shall be issued within any reservation only after a finding by the Commission that the license will not interfere or be inconsistent with the purpose for which such reservation was created or acquired, and shall be subject to and contain such conditions as the Secretary of the department under whose supervision such reservation falls shall deem necessary for the adequate protection and utilization of such reservation: 1 1 So in original. The colon probably should be a period. The license applicant and any party to the proceeding shall be entitled to a determination on the record, after opportunity for an agency trial-type hearing of no more than 90 days, on any disputed issues of material fact with respect to such conditions. All disputed issues of material fact raised by any party shall be determined in a single trial-type hearing to be conducted by the relevant resource agency in accordance with the regulations promulgated under this subsection and within the time frame established by the Commission for each license proceeding. Within 90 days of August 8, 2005 , the Secretaries of the Interior, Commerce, and Agriculture shall establish jointly, by rule, the procedures for such expedited trial-type hearing, including the opportunity to undertake discovery and cross-examine witnesses, in consultation with the Federal Energy Regulatory Commission. 2 2 So in original. The period probably should be a colon. Provided further , That no license affecting the navigable capacity of any navigable waters of the United States shall be issued until the plans of the dam or other structures affecting the navigation have been approved by the Chief of Engineers and the Secretary of the Army. Whenever the contemplated improvement is, in the judgment of the Commission, desirable and justified in the public interest for the purpose of improving or developing a waterway or waterways for the use or benefit of interstate or foreign commerce, a finding to that effect shall be made by the Commission and shall become a part of the records of the Commission: Provided further , That in case the Commission shall find that any Government dam may be advantageously used by the United States for public purposes in addition to navigation, no license therefor shall be issued until two years after it shall have reported to Congress the facts and conditions relating thereto, except that this provision shall not apply to any Government dam constructed prior to June 10, 1920 : And provided further , That upon the filing of any application for a license which has not been preceded by a preliminary permit under subsection (f) of this section, notice shall be given and published as required by the proviso of said subsection. In deciding whether to issue any license under this subchapter for any project, the Commission, in addition to the power and development purposes for which licenses are issued, shall give equal consideration to the purposes of energy conservation, the protection, mitigation of damage to, and enhancement of, fish and wildlife (including related spawning grounds and habitat), the protection of recreational opportunities, and the preservation of other aspects of environmental quality.
- (f) To issue preliminary permits for the purpose of enabling applicants for a license hereunder to secure the data and to perform the acts required by section 802 of this title : Provided, however , That upon the filing of any application for a preliminary permit by any person, association, or corporation the Commission, before granting such application, shall at once give notice of such application in writing to any State or municipality likely to be interested in or affected by such application; and shall also publish notice of such application once each week for four weeks in a daily or weekly newspaper published in the county or counties in which the project or any part hereof or the lands affected thereby are situated.
- (g) Upon its own motion to order an investigation of any occupancy of, or evidenced intention to occupy, for the purpose of developing electric power, public lands, reservations, or streams or other bodies of water over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States by any person, corporation, State, or municipality and to issue such order as it may find appropriate, expedient, and in the public interest to conserve and utilize the navigation and water-power resources of the region.
§ 797a. Congressional authorization for permits, licenses, leases, or authorizations for dams, conduits, reservoirs, etc., within national parks or monuments
On and after March 3, 1921 , no permit, license, lease, or authorization for dams, conduits, reservoirs, power houses, transmission lines, or other works for storage or carriage of water, or for the development, transmission, or utilization of power within the limits as constituted, March 3, 1921 , of any national park or national monument shall be granted or made without specific authority of Congress.
§ 797b. Duty to keep Congress fully and currently informed
The Federal Energy Regulatory Commission shall keep the Committee on Energy and Commerce of the United States House of Representatives and the Committee on Energy and Natural Resources of the United States Senate fully and currently informed regarding actions of the Commission with respect to the provisions of Part I of the Federal Power Act [ 16 U.S.C. 791a et seq.].
§ 797c. Dams in National Park System units
After October 24, 1992 , the Federal Energy Regulatory Commission may not issue an original license under Part I of the Federal Power Act [ 16 U.S.C. 791a et seq.] (nor an exemption from such Part) for any new hydroelectric power project located within the boundaries of any unit of the National Park System that would have a direct adverse effect on Federal lands within any such unit. Nothing in this section shall be construed as repealing any existing provision of law (or affecting any treaty) explicitly authorizing a hydroelectric power project.
§ 797d. Third party contracting by FERC
- (a) Where the Federal Energy Regulatory Commission is required to prepare a draft or final environmental impact statement under the National Environmental Policy Act of 1969 ( 42 U.S.C. 4321 and following) in connection with an application for a license under part I of the Federal Power Act [ 16 U.S.C. 791a et seq.], the Commission may permit, at the election of the applicant, a contractor, consultant or other person funded by the applicant and chosen by the Commission from among a list of such individuals or companies determined by the Commission to be qualified to do such work, to prepare such statement for the Commission. The contractor shall execute a disclosure statement prepared by the Commission specifying that it has no financial or other interest in the outcome of the project. The Commission shall establish the scope of work and procedures to assure that the contractor, consultant or other person has no financial or other potential conflict of interest in the outcome of the proceeding. Nothing herein shall affect the Commission’s responsibility to comply with the National Environmental Policy Act of 1969.
- (b) Where an environmental assessment is required under the National Environmental Policy Act of 1969 ( 42 U.S.C. 4321 and following) in connection with an application for a license under part I of the Federal Power Act [ 16 U.S.C. 791a et seq.], the Commission may permit an applicant, or a contractor, consultant or other person selected by the applicant, to prepare such environmental assessment. The Commission shall institute procedures, including pre-application consultations, to advise potential applicants of studies or other information foreseeably required by the Commission. The Commission may allow the filing of such applicant-prepared environmental assessments as part of the application. Nothing herein shall affect the Commission’s responsibility to comply with the National Environmental Policy Act of 1969.
- (c) This section shall take effect with respect to license applications filed after October 24, 1992 .
§ 798. Purpose and scope of preliminary permits; transfer and cancellation
- (a) Each preliminary permit issued under this subchapter shall be for the sole purpose of maintaining priority of application for a license under the terms of this chapter for such period or periods, not exceeding a total of 4 years, as in the discretion of the Commission may be necessary for making examinations and surveys, for preparing maps, plans, specifications, and estimates, and for making financial arrangements.
- (b) The Commission may—
- (1) extend the period of a preliminary permit once for not more than 4 additional years beyond the 4 years permitted by subsection (a) if the Commission finds that the permittee has carried out activities under such permit in good faith and with reasonable diligence; and
- (2) after the end of an extension period granted under paragraph (1), issue an additional permit to the permittee if the Commission determines that there are extraordinary circumstances that warrant the issuance of the additional permit.
- (c) Each such permit shall set forth the conditions under which priority shall be maintained.
- (d) Such permits shall not be transferable, and may be canceled by order of the Commission upon failure of permittees to comply with the conditions thereof or for other good cause shown after notice and opportunity for hearing.
§ 799. License; duration, conditions, revocation, alteration, or surrender
Licenses under this subchapter shall be issued for a period not exceeding fifty years. Each such license shall be conditioned upon acceptance by the licensee of all of the terms and conditions of this chapter and such further conditions, if any, as the Commission shall prescribe in conformity with this chapter, which said terms and conditions and the acceptance thereof shall be expressed in said license. Licenses may be revoked only for the reasons and in the manner prescribed under the provisions of this chapter, and may be altered or surrendered only upon mutual agreement between the licensee and the Commission after thirty days’ public notice.
§ 800. Issuance of preliminary permits or licenses
- (a) In issuing preliminary permits hereunder or original licenses where no preliminary permit has been issued, the Commission shall give preference to applications therefor by States, Indian tribes, and municipalities, provided the plans for the same are deemed by the Commission equally well adapted, or shall within a reasonable time to be fixed by the Commission be made equally well adapted, to conserve and utilize in the public interest the water resources of the region; and as between other applicants, the Commission may give preference to the applicant the plans of which it finds and determines are best adapted to develop, conserve, and utilize in the public interest the water resources of the region, if it be satisfied as to the ability of the applicant to carry out such plans.
- (b) Whenever, in the judgment of the Commission, the development of any water resources for public purposes should be undertaken by the United States itself, the Commission shall not approve any application for any project affecting such development, but shall cause to be made such examinations, surveys, reports, plans, and estimates of the cost of the proposed development as it may find necessary, and shall submit its findings to Congress with such recommendations as it may find appropriate concerning such development.
- (c) Whenever, after notice and opportunity for hearing, the Commission determines that the United States should exercise its right upon or after the expiration of any license to take over any project or projects for public purposes, the Commission shall not issue a new license to the original licensee or to a new licensee but shall submit its recommendation to Congress together with such information as it may consider appropriate.
§ 801. Transfer of license; obligations of transferee
No voluntary transfer of any license, or of the rights thereunder granted, shall be made without the written approval of the commission; and any successor or assign of the rights of such licensee, whether by voluntary transfer, judicial sale, foreclosure sale, or otherwise, shall be subject to all the conditions of the license under which such rights are held by such licensee and also subject to all the provisions and conditions of this chapter to the same extent as though such successor or assign were the original licensee under this chapter: Provided , That a mortgage or trust deed or judicial sales made thereunder or under tax sales shall not be deemed voluntary transfers within the meaning of this section.
§ 802. Information to accompany application for license; landowner notification
- (a) Each applicant for a license under this chapter shall submit to the commission—
- (1) Such maps, plans, specifications, and estimates of cost as may be required for a full understanding of the proposed project. Such maps, plans, and specifications when approved by the commission shall be made a part of the license; and thereafter no change shall be made in said maps, plans, or specifications until such changes shall have been approved and made a part of such license by the commission.
- (2) Satisfactory evidence that the applicant has complied with the requirements of the laws of the State or States within which the proposed project is to be located with respect to bed and banks and to the appropriation, diversion, and use of water for power purposes and with respect to the right to engage in the business of developing, transmitting and distributing power, and in any other business necessary to effect the purposes of a license under this chapter.
- (3) 1 1 See Codification note below. Such additional information as the commission may require.
- (b) Upon the filing of any application for a license (other than a license under section 808 of this title ) the applicant shall make a good faith effort to notify each of the following by certified mail:
- (1) Any person who is an owner of record of any interest in the property within the bounds of the project.
- (2) Any Federal, State, municipal or other local governmental agency likely to be interested in or affected by such application.
§ 803. Conditions of license generally
All licenses issued under this subchapter shall be on the following conditions:
- (a)
- (1) That the project adopted, including the maps, plans, and specifications, shall be such as in the judgment of the Commission will be best adapted to a comprehensive plan for improving or developing a waterway or waterways for the use or benefit of interstate or foreign commerce, for the improvement and utilization of water-power development, for the adequate protection, mitigation, and enhancement of fish and wildlife (including related spawning grounds and habitat), and for other beneficial public uses, including irrigation, flood control, water supply, and recreational and other purposes referred to in section 797(e) of this title 1 1 So in original. Probably should be followed by “; and”. if necessary in order to secure such plan the Commission shall have authority to require the modification of any project and of the plans and specifications of the project works before approval.
- (2) In order to ensure that the project adopted will be best adapted to the comprehensive plan described in paragraph (1), the Commission shall consider each of the following:
- (A) The extent to which the project is consistent with a comprehensive plan (where one exists) for improving, developing, or conserving a waterway or waterways affected by the project that is prepared by—
- (i) an agency established pursuant to Federal law that has the authority to prepare such a plan; or
- (ii) the State in which the facility is or will be located.
- (B) The recommendations of Federal and State agencies exercising administration over flood control, navigation, irrigation, recreation, cultural and other relevant resources of the State in which the project is located, and the recommendations (including fish and wildlife recommendations) of Indian tribes affected by the project.
- (C) In the case of a State or municipal applicant, or an applicant which is primarily engaged in the generation or sale of electric power (other than electric power solely from cogeneration facilities or small power production facilities), the electricity consumption efficiency improvement program of the applicant, including its plans, performance and capabilities for encouraging or assisting its customers to conserve electricity cost-effectively, taking into account the published policies, restrictions, and requirements of relevant State regulatory authorities applicable to such applicant.
- (A) The extent to which the project is consistent with a comprehensive plan (where one exists) for improving, developing, or conserving a waterway or waterways affected by the project that is prepared by—
- (3) Upon receipt of an application for a license, the Commission shall solicit recommendations from the agencies and Indian tribes identified in subparagraphs (A) and (B) of paragraph (2) for proposed terms and conditions for the Commission’s consideration for inclusion in the license.
- (b) That except when emergency shall require for the protection of navigation, life, health, or property, no substantial alteration or addition not in conformity with the approved plans shall be made to any dam or other project works constructed hereunder of an installed capacity in excess of two thousand horsepower without the prior approval of the Commission; and any emergency alteration or addition so made shall thereafter be subject to such modification and change as the Commission may direct.
- (c) That the licensee shall maintain the project works in a condition of repair adequate for the purposes of navigation and for the efficient operation of said works in the development and transmission of power, shall make all necessary renewals and replacements, shall establish and maintain adequate depreciation reserves for such purposes, shall so maintain, and operate said works as not to impair navigation, and shall conform to such rules and regulations as the Commission may from time to time prescribe for the protection of life, health, and property. Each licensee hereunder shall be liable for all damages occasioned to the property of others by the construction, maintenance, or operation of the project works or of the works appurtenant or accessory thereto, constructed under the license and in no event shall the United States be liable therefor.
- (d) That after the first twenty years of operation, out of surplus earned thereafter, if any, accumulated in excess of a specified reasonable rate of return upon the net investment of a licensee in any project or projects under license, the licensee shall establish and maintain amortization reserves, which reserves shall, in the discretion of the Commission, be held until the termination of the license or be applied from time to time in reduction of the net investment. Such specified rate of return and the proportion of such surplus earnings to be paid into and held in such reserves shall be set forth in the license. For any new license issued under section 808 of this title , the amortization reserves under this subsection shall be maintained on and after the effective date of such new license.
- (e)
- (1) That the licensee shall pay to the United States reasonable annual charges in an amount to be fixed by the Commission for the purpose of reimbursing the United States for the costs of the administration of this subchapter, including any reasonable and necessary costs incurred by Federal and State fish and wildlife agencies and other natural and cultural resource agencies in connection with studies or other reviews carried out by such agencies for purposes of administering their responsibilities under this subchapter; for recompensing it for the use, occupancy, and enjoyment of its lands or other property; and for the expropriation to the Government of excessive profits until the respective States shall make provision for preventing excessive profits or for the expropriation thereof to themselves, or until the period of amortization as herein provided is reached, and in fixing such charges the Commission shall seek to avoid increasing the price to the consumers of power by such charges, and any such charges may be adjusted from time to time by the Commission as conditions may require: Provided , That, subject to annual appropriations Acts, the portion of such annual charges imposed by the Commission under this subsection to cover the reasonable and necessary costs of such agencies shall be available to such agencies (in addition to other funds appropriated for such purposes) solely for carrying out such studies and reviews and shall remain available until expended: Provided , That when licenses are issued involving the use of Government dams or other structures owned by the United States or tribal lands embraced within Indian reservations the Commission shall, subject to the approval of the Secretary of the Interior in the case of such dams or structures in reclamation projects and, in the case of such tribal lands, subject to the approval of the Indian tribe having jurisdiction of such lands as provided in section 5123 of title 25 , fix a reasonable annual charge for the use thereof, and such charges may with like approval be readjusted by the Commission at the end of twenty years after the project is available for service and at periods of not less than ten years thereafter upon notice and opportunity for hearing: Provided further , That licenses for the development, transmission, or distribution of power by States or municipalities shall be issued and enjoyed without charge to the extent such power is sold to the public without profit or is used by such State or municipality for State or municipal purposes, except that as to projects constructed or to be constructed by States or municipalities primarily designed to provide or improve navigation, licenses therefor shall be issued without charge; and that licenses for the development, transmission, or distribution of power for domestic, mining, or other beneficial use in projects of not more than two thousand horsepower installed capacity may be issued without charge, except on tribal lands within Indian reservations; but in no case shall a license be issued free of charge for the development and utilization of power created by any Government dam and that the amount charged therefor in any license shall be such as determined by the Commission: Provided however , That no charge shall be assessed for the use of any Government dam or structure by any licensee if, before January 1, 1985 , the Secretary of the Interior has entered into a contract with such licensee that meets each of the following requirements:
- (A) The contract covers one or more projects for which a license was issued by the Commission before January 1, 1985 .
- (B) The contract contains provisions specifically providing each of the following:
- (i) A powerplant may be built by the licensee utilizing irrigation facilities constructed by the United States.
- (ii) The powerplant shall remain in the exclusive control, possession, and ownership of the licensee concerned.
- (iii) All revenue from the powerplant and from the use, sale, or disposal of electric energy from the powerplant shall be, and remain, the property of such licensee.
- (C) The contract is an amendatory, supplemental and replacement contract between the United States and: (i) the Quincy-Columbia Basin Irrigation District (Contract No. 14–06–100–6418); (ii) the East Columbia Basin Irrigation District (Contract No. 14–06–100–6419); or, (iii) the South Columbia Basin Irrigation District (Contract No. 14–06–100–6420).
- (2) In the case of licenses involving the use of Government dams or other structures owned by the United States, the charges fixed (or readjusted) by the Commission under paragraph (1) for the use of such dams or structures shall not exceed 1 mill per kilowatt-hour for the first 40 gigawatt-hours of energy a project produces in any year, 1½ mills per kilowatt-hour for over 40 up to and including 80 gigawatt-hours in any year, and 2 mills per kilowatt-hour for any energy the project produces over 80 gigawatt-hours in any year. Except as provided in subsection (f), such charge shall be the only charge assessed by any agency of the United States for the use of such dams or structures.
- (3) The provisions of paragraph (2) shall apply with respect to—
- (A) all licenses issued after October 16, 1986 ; and
- (B) all licenses issued before October 16, 1986 , which—
- (i) did not fix a specific charge for the use of the Government dam or structure involved; and
- (ii) did not specify that no charge would be fixed for the use of such dam or structure.
- (4) Every 5 years, the Commission shall review the appropriateness of the annual charge limitations provided for in this subsection and report to Congress concerning its recommendations thereon.
- (1) That the licensee shall pay to the United States reasonable annual charges in an amount to be fixed by the Commission for the purpose of reimbursing the United States for the costs of the administration of this subchapter, including any reasonable and necessary costs incurred by Federal and State fish and wildlife agencies and other natural and cultural resource agencies in connection with studies or other reviews carried out by such agencies for purposes of administering their responsibilities under this subchapter; for recompensing it for the use, occupancy, and enjoyment of its lands or other property; and for the expropriation to the Government of excessive profits until the respective States shall make provision for preventing excessive profits or for the expropriation thereof to themselves, or until the period of amortization as herein provided is reached, and in fixing such charges the Commission shall seek to avoid increasing the price to the consumers of power by such charges, and any such charges may be adjusted from time to time by the Commission as conditions may require: Provided , That, subject to annual appropriations Acts, the portion of such annual charges imposed by the Commission under this subsection to cover the reasonable and necessary costs of such agencies shall be available to such agencies (in addition to other funds appropriated for such purposes) solely for carrying out such studies and reviews and shall remain available until expended: Provided , That when licenses are issued involving the use of Government dams or other structures owned by the United States or tribal lands embraced within Indian reservations the Commission shall, subject to the approval of the Secretary of the Interior in the case of such dams or structures in reclamation projects and, in the case of such tribal lands, subject to the approval of the Indian tribe having jurisdiction of such lands as provided in section 5123 of title 25 , fix a reasonable annual charge for the use thereof, and such charges may with like approval be readjusted by the Commission at the end of twenty years after the project is available for service and at periods of not less than ten years thereafter upon notice and opportunity for hearing: Provided further , That licenses for the development, transmission, or distribution of power by States or municipalities shall be issued and enjoyed without charge to the extent such power is sold to the public without profit or is used by such State or municipality for State or municipal purposes, except that as to projects constructed or to be constructed by States or municipalities primarily designed to provide or improve navigation, licenses therefor shall be issued without charge; and that licenses for the development, transmission, or distribution of power for domestic, mining, or other beneficial use in projects of not more than two thousand horsepower installed capacity may be issued without charge, except on tribal lands within Indian reservations; but in no case shall a license be issued free of charge for the development and utilization of power created by any Government dam and that the amount charged therefor in any license shall be such as determined by the Commission: Provided however , That no charge shall be assessed for the use of any Government dam or structure by any licensee if, before January 1, 1985 , the Secretary of the Interior has entered into a contract with such licensee that meets each of the following requirements:
- (f) That whenever any licensee hereunder is directly benefited by the construction work of another licensee, a permittee, or of the United States of a storage reservoir or other headwater improvement, the Commission shall require as a condition of the license that the licensee so benefited shall reimburse the owner of such reservoir or other improvements for such part of the annual charges for interest, maintenance, and depreciation thereon as the Commission may deem equitable. The proportion of such charges to be paid by any licensee shall be determined by the Commission. The licensees or permittees affected shall pay to the United States the cost of making such determination as fixed by the Commission. Whenever such reservoir or other improvement is constructed by the United States the Commission shall assess similar charges against any licensee directly benefited thereby, and any amount so assessed shall be paid into the Treasury of the United States, to be reserved and appropriated as a part of the special fund for headwater improvements as provided in section 810 of this title . Whenever any power project not under license is benefited by the construction work of a licensee or permittee, the United States or any agency thereof, the Commission, after notice to the owner or owners of such unlicensed project, shall determine and fix a reasonable and equitable annual charge to be paid to the licensee or permittee on account of such benefits, or to the United States if it be the owner of such headwater improvement.
- (g) Such other conditions not inconsistent with the provisions of this chapter as the commission may require.
- (h)
- (1) Combinations, agreements, arrangements, or understandings, express or implied, to limit the output of electrical energy, to restrain trade, or to fix, maintain, or increase prices for electrical energy or service are hereby prohibited.
- (2) That conduct under the license that: (A) results in the contravention of the policies expressed in the antitrust laws; and (B) is not otherwise justified by the public interest considering regulatory policies expressed in other applicable law (including but not limited to those contained in subchapter II of this chapter) shall be prevented or adequately minimized by means of conditions included in the license prior to its issuance. In the event it is impossible to prevent or adequately minimize the contravention, the Commission shall refuse to issue any license to the applicant for the project and, in the case of an existing project, shall take appropriate action to provide thereafter for the operation and maintenance of the affected project and for the issuing of a new license in accordance with section 808 of this title .
- (i) In issuing licenses for a minor part only of a complete project, or for a complete project of not more than two thousand horsepower installed capacity, the Commission may in its discretion waive such conditions, provisions, and requirements of this subchapter, except the license period of fifty years, as it may deem to be to the public interest to waive under the circumstances: Provided , That the provisions hereof shall not apply to annual charges for use of lands within Indian reservations.
- (j)
- (1) That in order to adequately and equitably protect, mitigate damages to, and enhance, fish and wildlife (including related spawning grounds and habitat) affected by the development, operation, and management of the project, each license issued under this subchapter shall include conditions for such protection, mitigation, and enhancement. Subject to paragraph (2), such conditions shall be based on recommendations received pursuant to the Fish and Wildlife Coordination Act ( 16 U.S.C. 661 et seq.) from the National Marine Fisheries Service, the United States Fish and Wildlife Service, and State fish and wildlife agencies.
- (2) Whenever the Commission believes that any recommendation referred to in paragraph (1) may be inconsistent with the purposes and requirements of this subchapter or other applicable law, the Commission and the agencies referred to in paragraph (1) shall attempt to resolve any such inconsistency, giving due weight to the recommendations, expertise, and statutory responsibilities of such agencies. If, after such attempt, the Commission does not adopt in whole or in part a recommendation of any such agency, the Commission shall publish each of the following findings (together with a statement of the basis for each of the findings):
- (A) A finding that adoption of such recommendation is inconsistent with the purposes and requirements of this subchapter or with other applicable provisions of law.
- (B) A finding that the conditions selected by the Commission comply with the requirements of paragraph (1).
§ 804. Project works affecting navigable waters; requirements insertable in license
If the dam or other project works are to be constructed across, along, or in any of the navigable waters of the United States, the commission may, insofar as it deems the same reasonably necessary to promote the present and future needs of navigation and consistent with a reasonable investment cost to the licensee, include in the license any one or more of the following provisions or requirements:
- (a) That such licensee shall, to the extent necessary to preserve and improve navigation facilities, construct, in whole or in part, without expense to the United States, in connection with such dam, a lock or locks, booms, sluices, or other structures for navigation purposes, in accordance with plans and specifications approved by the Chief of Engineers and the Secretary of the Army and made part of such license.
- (b) That in case such structures for navigation purposes are not made a part of the original construction at the expense of the licensee, then whenever the United States shall desire to complete such navigation facilities the licensee shall convey to the United States, free of cost, such of its land and its rights-of-way and such right of passage through its dams or other structures, and permit such control of pools as may be required to complete such navigation facilities.
- (c) That such licensee shall furnish free of cost to the United States power for the operation of such navigation facilities, whether constructed by the licensee or by the United States.
§ 805. Participation by Government in costs of locks, etc.
Whenever application is filed for a project hereunder involving navigable waters of the United States, and the commission shall find upon investigation that the needs of navigation require the construction of a lock or locks or other navigation structures, and that such structures cannot, consistent with a reasonable investment cost to the applicant, be provided in the manner specified in subsection (a) of section 804 of this title , the commission may grant the application with the provision to be expressed in the license that the licensee will install the necessary navigation structures if the Government fails to make provision therefor within a time to be fixed in the license and cause a report upon such project to be prepared, with estimates of cost of the power development and of the navigation structures, and shall submit such report to Congress with such recommendations as it deems appropriate concerning the participation of the United States in the cost of construction of such navigation structures.
§ 806. Time limit for construction of project works; extension of time; termination or revocation of licenses for delay
The licensee shall commence the construction of the project works within the time fixed in the license, which shall not be more than two years from the date thereof, shall thereafter in good faith and with due diligence prosecute such construction, and shall within the time fixed in the license complete and put into operation such part of the ultimate development as the commission shall deem necessary to supply the reasonable needs of the then available market, and shall from time to time thereafter construct such portion of the balance of such development as the commission may direct, so as to supply adequately the reasonable market demands until such development shall have been completed. The periods for the commencement of construction may be extended for not more than 8 additional years, and the period for the completion of construction carried on in good faith and with reasonable diligence may be extended by the commission when not incompatible with the public interests. In case the licensee shall not commence actual construction of the project works, or of any specified part thereof, within the time prescribed in the license or as extended by the commission, then, after due notice given, the license shall, as to such project works or part thereof, be terminated upon written order of the commission. In case the construction of the project works, or of any specified part thereof, has been begun but not completed within the time prescribed in the license, or as extended by the commission, then the Attorney General, upon the request of the commission, shall institute proceedings in equity in the district court of the United States for the district in which any part of the project is situated for the revocation of said license, the sale of the works constructed, and such other equitable relief as the case may demand, as provided for in section 820 of this title .
§ 807. Right of Government to take over project works
- (a) Upon not less than two years’ notice in writing from the commission the United States shall have the right upon or after the expiration of any license to take over and thereafter to maintain and operate any project or projects as defined in section 796 of this title , and covered in whole or in part by the license, or the right to take over upon mutual agreement with the licensee all property owned and held by the licensee then valuable and serviceable in the development, transmission, or distribution of power and which is then dependent for its usefulness upon the continuance of the license, together with any lock or locks or other aids to navigation constructed at the expense of the licensee, upon the condition that before taking possession it shall pay the net investment of the licensee in the project or projects taken, not to exceed the fair value of the property taken, plus such reasonable damages, if any, to property of the licensee valuable, serviceable, and dependent as above set forth but not taken, as may be caused by the severance therefrom of property taken, and shall assume all contracts entered into by the licensee with the approval of the Commission. The net investment of the licensee in the project or projects so taken and the amount of such severance damages, if any, shall be determined by the Commission after notice and opportunity for hearing. Such net investment shall not include or be affected by the value of any lands, rights-of-way, or other property of the United States licensed by the Commission under this chapter, by the license or by good will, going value, or prospective revenues; nor shall the values allowed for water rights, rights-of-way, lands, or interest in lands be in excess of the actual reasonable cost thereof at the time of acquisition by the licensee: Provided , That the right of the United States or any State or municipality to take over, maintain, and operate any project licensed under this chapter at any time by condemnation proceedings upon payment of just compensation is expressly reserved.
- (b) In any relicensing proceeding before the Commission any Federal department or agency may timely recommend, pursuant to such rules as the Commission shall prescribe, that the United States exercise its right to take over any project or projects. Thereafter, the Commission, if its 1 1 So in original. Probably should be “it”. does not itself recommend such action pursuant to the provisions of section 800(c) of this title , shall upon motion of such department or agency stay the effective date of any order issuing a license, except an order issuing an annual license in accordance with the proviso of section 808(a) of this title , for two years after the date of issuance of such order, after which period the stay shall terminate, unless terminated earlier upon motion of the department or agency requesting the stay or by action of Congress. The Commission shall notify the Congress of any stay granted pursuant to this subsection.
§ 808. New licenses and renewals
- (a)
- (1) If the United States does not, at the expiration of the existing license, exercise its right to take over, maintain, and operate any project or projects of the licensee, as provided in section 807 of this title , the commission is authorized to issue a new license to the existing licensee upon such terms and conditions as may be authorized or required under the then existing laws and regulations, or to issue a new license under said terms and conditions to a new licensee, which license may cover any project or projects covered by the existing license, and shall be issued on the condition that the new licensee shall, before taking possession of such project or projects, pay such amount, and assume such contracts as the United States is required to do in the manner specified in section 807 of this title : Provided , That in the event the United States does not exercise the right to take over or does not issue a license to a new licensee, or issue a new license to the existing licensee, upon reasonable terms, then the commission shall issue from year to year an annual license to the then licensee under the terms and conditions of the existing license until the property is taken over or a new license is issued as aforesaid.
- (2) Any new license issued under this section shall be issued to the applicant having the final proposal which the Commission determines is best adapted to serve the public interest, except that in making this determination the Commission shall ensure that insignificant differences with regard to subparagraphs (A) through (G) of this paragraph between competing applications are not determinative and shall not result in the transfer of a project. In making a determination under this section (whether or not more than one application is submitted for the project), the Commission shall, in addition to the requirements of section 803 of this title , consider (and explain such consideration in writing) each of the following:
- (A) The plans and abilities of the applicant to comply with (i) the articles, terms, and conditions of any license issued to it and (ii) other applicable provisions of this subchapter.
- (B) The plans of the applicant to manage, operate, and maintain the project safely.
- (C) The plans and abilities of the applicant to operate and maintain the project in a manner most likely to provide efficient and reliable electric service.
- (D) The need of the applicant over the short and long term for the electricity generated by the project or projects to serve its customers, including, among other relevant considerations, the reasonable costs and reasonable availability of alternative sources of power, taking into consideration conservation and other relevant factors and taking into consideration the effect on the provider (including its customers) of the alternative source of power, the effect on the applicant’s operating and load characteristics, the effect on communities served or to be served by the project, and in the case of an applicant using power for the applicant’s own industrial facility and related operations, the effect on the operation and efficiency of such facility or related operations, its workers, and the related community. In the case of an applicant that is an Indian tribe applying for a license for a project located on the tribal reservation, a statement of the need of such tribe for electricity generated by the project to foster the purposes of the reservation may be included.
- (E) The existing and planned transmission services of the applicant, taking into consideration system reliability, costs, and other applicable economic and technical factors.
- (F) Whether the plans of the applicant will be achieved, to the greatest extent possible, in a cost effective manner.
- (G) Such other factors as the Commission may deem relevant, except that the terms and conditions in the license for the protection, mitigation, or enhancement of fish and wildlife resources affected by the development, operation, and management of the project shall be determined in accordance with section 803 of this title , and the plans of an applicant concerning fish and wildlife shall not be subject to a comparative evaluation under this subsection.
- (3) In the case of an application by the existing licensee, the Commission shall also take into consideration each of the following:
- (A) The existing licensee’s record of compliance with the terms and conditions of the existing license.
- (B) The actions taken by the existing licensee related to the project which affect the public.
- (b)
- (1) Each existing licensee shall notify the Commission whether the licensee intends to file an application for a new license or not. Such notice shall be submitted at least 5 years before the expiration of the existing license.
- (2) At the time notice is provided under paragraph (1), the existing licensee shall make each of the following reasonably available to the public for inspection at the offices of such licensee: current maps, drawings, data, and such other information as the Commission shall, by rule, require regarding the construction and operation of the licensed project. Such information shall include, to the greatest extent practicable pertinent energy conservation, recreation, fish and wildlife, and other environmental information. Copies of the information shall be made available at reasonable costs of reproduction. Within 180 days after October 16, 1986 , the Commission shall promulgate regulations regarding the information to be provided under this paragraph.
- (3) Promptly following receipt of notice under paragraph (1), the Commission shall provide public notice of whether an existing licensee intends to file or not to file an application for a new license. The Commission shall also promptly notify the National Marine Fisheries Service and the United States Fish and Wildlife Service, and the appropriate State fish and wildlife agencies.
- (4) The Commission shall require the applicant to identify any Federal or Indian lands included in the project boundary, together with a statement of the annual fees paid as required by this subchapter for such lands, and to provide such additional information as the Commission deems appropriate to carry out the Commission’s responsibilities under this section.
- (c)
- (1) Each application for a new license pursuant to this section shall be filed with the Commission at least 24 months before the expiration of the term of the existing license. Each applicant shall consult with the fish and wildlife agencies referred to in subsection (b) and, as appropriate, conduct studies with such agencies. Within 60 days after the statutory deadline for the submission of applications, the Commission shall issue a notice establishing expeditious procedures for relicensing and a deadline for submission of final amendments, if any, to the application.
- (2) The time periods specified in this subsection and in subsection (b) shall be adjusted, in a manner that achieves the objectives of this section, by the Commission by rule or order with respect to existing licensees who, by reason of the expiration dates of their licenses, are unable to comply with a specified time period.
- (d)
- (1) In evaluating applications for new licenses pursuant to this section, the Commission shall not consider whether an applicant has adequate transmission facilities with regard to the project.
- (2) When the Commission issues a new license (pursuant to this section) to an applicant which is not the existing licensee of the project and finds that it is not feasible for the new licensee to utilize the energy from such project without provision by the existing licensee of reasonable services, including transmission services, the Commission shall give notice to the existing licensee and the new licensee to immediately enter into negotiations for such services and the costs demonstrated by the existing licensee as being related to the provision of such services. It is the intent of the Congress that such negotiations be carried out in good faith and that a timely agreement be reached between the parties in order to facilitate the transfer of the license by the date established when the Commission issued the new license. If such parties do not notify the Commission that within the time established by the Commission in such notice (and if appropriate, in the judgment of the Commission, one 45-day extension thereof), a mutually satisfactory arrangement for such services that is consistent with the provisions of this chapter has been executed, the Commission shall order the existing licensee to file (pursuant to section 824d of this title ) with the Commission a tariff, subject to refund, ensuring such services beginning on the date of transfer of the project and including just and reasonable rates and reasonable terms and conditions. After notice and opportunity for a hearing, the Commission shall issue a final order adopting or modifying such tariff for such services at just and reasonable rates in accordance with section 824d of this title and in accordance with reasonable terms and conditions. The Commission, in issuing such order, shall ensure the services necessary for the full and efficient utilization and benefits for the license term of the electric energy from the project by the new licensee in accordance with the license and this subchapter, except that in issuing such order the Commission—
- (A) shall not compel the existing licensee to enlarge generating facilities, transmit electric energy other than to the distribution system (providing service to customers) of the new licensee identified as of the date one day preceding the date of license award, or require the acquisition of new facilities, including the upgrading of existing facilities other than any reasonable enhancement or improvement of existing facilities controlled by the existing licensee (including any acquisition related to such enhancement or improvement) necessary to carry out the purposes of this paragraph;
- (B) shall not adversely affect the continuity and reliability of service to the customers of the existing licensee;
- (C) shall not adversely affect the operational integrity of the transmission and electric systems of the existing licensee;
- (D) shall not cause any reasonably quantifiable increase in the jurisdictional rates of the existing licensee; and
- (E) shall not order any entity other than the existing licensee to provide transmission or other services.
- (e) Except for an annual license, any license issued by the Commission under this section shall be for a term which the Commission determines to be in the public interest but not less than 30 years, nor more than 50 years, from the date on which the license is issued.
- (f) In issuing any licenses under this section except an annual license, the Commission, on its own motion or upon application of any licensee, person, State, municipality, or State commission, after notice to each State commission and licensee affected, and after opportunity for hearing, whenever it finds that in conformity with a comprehensive plan for improving or developing a waterway or waterways for beneficial public uses all or part of any licensed project should no longer be used or adapted for use for power purposes, may license all or part of the project works for nonpower use. A license for nonpower use shall be issued to a new licensee only on the condition that the new licensee shall, before taking possession of the facilities encompassed thereunder, pay such amount and assume such contracts as the United States is required to do, in the manner specified in section 807 of this title . Any license for nonpower use shall be a temporary license. Whenever, in the judgment of the Commission, a State, municipality, interstate agency, or another Federal agency is authorized and willing to assume regulatory supervision of the lands and facilities included under the nonpower license and does so, the Commission shall thereupon terminate the license. Consistent with the provisions of subchapter IV of this chapter, every licensee for nonpower use shall keep such accounts and file such annual and other periodic or special reports concerning the removal, alteration, nonpower use, or other disposition of any project works or parts thereof covered by the nonpower use license as the Commission may by rules and regulations or order prescribe as necessary or appropriate.
§ 809. Temporary use by Government of project works for national safety; compensation for use
When in the opinion of the President of the United States, evidenced by a written order addressed to the holder of any license under this chapter, the safety of the United States demands it, the United States shall have the right to enter upon and take possession of any project or part thereof, constructed, maintained, or operated under said license, for the purpose of manufacturing nitrates, explosives, or munitions of war, or for any other purpose involving the safety of the United States, to retain possession, management, and control thereof for such length of time as may appear to the President to be necessary to accomplish said purposes, and then to restore possession and control to the party or parties entitled thereto; and in the event that the United States shall exercise such right it shall pay to the party or parties entitled thereto just and fair compensation for the use of said property as may be fixed by the commission upon the basis of a reasonable profit in time of peace, and the cost of restoring said property to as good condition as existed at the time of the taking over thereof, less the reasonable value of any improvements that may be made thereto by the United States and which are valuable and serviceable to the licensee.
§ 810. Disposition of charges arising from licenses
- (a) All proceeds from any Indian reservation shall be placed to the credit of the Indians of such reservation. All other charges arising from licenses hereunder, except charges fixed by the Commission for the purpose of reimbursing the United States for the costs of administration of this subchapter, shall be paid into the Treasury of the United States, subject to the following distribution: 12½ per centum thereof is hereby appropriated to be paid into the Treasury of the United States and credited to “Miscellaneous receipts”; 50 per centum of the charges arising from licenses hereunder for the occupancy and use of public lands and national forests shall be paid into, reserved, and appropriated as a part of the reclamation fund created by the Act of Congress known as the Reclamation Act, approved June 17, 1902 ; and 37½ per centum of the charges arising from licenses hereunder for the occupancy and use of national forests and public lands from development within the boundaries of any State shall be paid by the Secretary of the Treasury to such State; and 50 per centum of the charges arising from all other licenses hereunder is reserved and appropriated as a special fund in the Treasury to be expended under the direction of the Secretary of the Army in the maintenance and operation of dams and other navigation structures owned by the United States or in the construction, maintenance, or operation of headwater or other improvements of navigable waters of the United States. The proceeds of charges made by the Commission for the purpose of reimbursing the United States for the costs of the administration of this subchapter shall be paid into the Treasury of the United States and credited to miscellaneous receipts.
- (b) In case of delinquency on the part of any licensee in the payment of annual charges a penalty of 5 per centum of the total amount so delinquent may be added to the total charges which shall apply for the first month or part of month so delinquent with an additional penalty of 3 per centum for each subsequent month until the total of the charges and penalties are paid or until the license is canceled and the charges and penalties satisfied in accordance with law.
§ 811. Operation of navigation facilities; rules and regulations; penalties
The Commission shall require the construction, maintenance, and operation by a licensee at its own expense of such lights and signals as may be directed by the Secretary of the Department in which the Coast Guard is operating, and such fishways as may be prescribed by the Secretary of the Interior or the Secretary of Commerce, as appropriate. The license applicant and any party to the proceeding shall be entitled to a determination on the record, after opportunity for an agency trial-type hearing of no more than 90 days, on any disputed issues of material fact with respect to such fishways. All disputed issues of material fact raised by any party shall be determined in a single trial-type hearing to be conducted by the relevant resource agency in accordance with the regulations promulgated under this subsection 1 1 So in original. Probably should be “section”. and within the time frame established by the Commission for each license proceeding. Within 90 days of August 8, 2005 , the Secretaries of the Interior, Commerce, and Agriculture shall establish jointly, by rule, the procedures for such expedited trial-type hearing, including the opportunity to undertake discovery and cross-examine witnesses, in consultation with the Federal Energy Regulatory Commission. The operation of any navigation facilities which may be constructed as a part of or in connection with any dam or diversion structure built under the provisions of this chapter, whether at the expense of a licensee hereunder or of the United States, shall at all times be controlled by such reasonable rules and regulations in the interest of navigation, including the control of the level of the pool caused by such dam or diversion structure as may be made from time to time by the Secretary of the Army; and for willful failure to comply with any such rule or regulation such licensee shall be deemed guilty of a misdemeanor, and upon conviction thereof shall be punished as provided in section 825 o of this title.
§ 812. Public-service licensee; regulations by State or by commission as to service, rates, charges, etc.
As a condition of the license, every licensee under this chapter which is a public-service corporation, or a person, association, or corporation owning or operating any project and developing, transmitting, or distributing power for sale or use in public service, shall abide by such reasonable regulation of the services to be rendered to customers or consumers of power, and of rates and charges of payment therefor, as may from time to time be prescribed by any duly constituted agency of the State in which the service is rendered or the rate charged. That in case of the development, transmission, or distribution, or use in public service of power by any licensee under this chapter or by its customer engaged in public service within a State which has not authorized and empowered a commission or other agency or agencies within said State to regulate and control the services to be rendered by such licensee or by its customer engaged in public service, or the rates and charges of payment therefor, or the amount or character of securities to be issued by any of said parties, it is agreed as a condition of such license that jurisdiction is conferred upon the commission, upon complaint of any person aggrieved or upon its own initiative, to exercise such regulation and control until such time as the State shall have provided a commission or other authority for such regulation and control: Provided , That the jurisdiction of the commission shall cease and determine as to each specific matter of regulation and control prescribed in this section as soon as the State shall have provided a commission or other authority for the regulation and control of that specific matter.
§ 813. Power entering into interstate commerce; regulation of rates, charges, etc.
When said power or any part thereof shall enter into interstate or foreign commerce the rates charged and the service rendered by any such licensee, or by any subsidiary corporation, the stock of which is owned or controlled directly or indirectly by such licensee, or by any person, corporation, or association purchasing power from such licensee for sale and distribution or use in public service shall be reasonable, nondiscriminatory, and just to the customer and all unreasonable discriminatory and unjust rates or services are prohibited and declared to be unlawful; and whenever any of the States directly concerned has not provided a commission or other authority to enforce the requirements of this section within such State or to regulate and control the amount and character of securities to be issued by any of such parties, or such States are unable to agree through their properly constituted authorities on the services to be rendered, or on the rates or charges of payment therefor, or on the amount or character of securities to be issued by any of said parties, jurisdiction is conferred upon the commission, upon complaint of any person, aggrieved, upon the request of any State concerned, or upon its own initiative to enforce the provisions of this section, to regulate and control so much of the services rendered, and of the rates and charges of payment therefor as constitute interstate or foreign commerce and to regulate the issuance of securities by the parties included within this section, and securities issued by the licensee subject to such regulations shall be allowed only for the bona fide purpose of financing and conducting the business of such licensee. The administration of the provisions of this section, so far as applicable, shall be according to the procedure and practice in fixing and regulating the rates, charges, and practices of railroad companies as provided in subtitle IV of title 49, and the parties subject to such regulation shall have the same rights of hearing, defense, and review as said companies in such cases. In any valuation of the property of any licensee hereunder for purposes of rate making, no value shall be claimed by the licensee or allowed by the commission for any project or projects under license in excess of the value or values prescribed in section 807 of this title for the purposes of purchase by the United States, but there shall be included the cost to such licensee of the construction of the lock or locks or other aids of navigation and all other capital expenditures required by the United States, and no value shall be claimed or allowed for the rights granted by the commission or by this chapter.
§ 814. Exercise by licensee of power of eminent domain
When any licensee cannot acquire by contract or pledges an unimproved dam site or the right to use or damage the lands or property of others necessary to the construction, maintenance, or operation of any dam, reservoir, diversion structure, or the works appurtenant or accessory thereto, in conjunction with any improvement which in the judgment of the commission is desirable and justified in the public interest for the purpose of improving or developing a waterway or waterways for the use or benefit of interstate or foreign commerce, it may acquire the same by the exercise of the right of eminent domain in the district court of the United States for the district in which such land or other property may be located, or in the State courts. The practice and procedure in any action or proceeding for that purpose in the district court of the United States shall conform as nearly as may be with the practice and procedure in similar action or proceeding in the courts of the State where the property is situated: Provided , That United States district courts shall only have jurisdiction of cases when the amount claimed by the owner of the property to be condemned exceeds $3,000 1 1 So in original. Probably should be followed by a colon. Provided further , That no licensee may use the right of eminent domain under this section to acquire any lands or other property that, prior to October 24, 1992 , were owned by a State or political subdivision thereof and were part of or included within any public park, recreation area or wildlife refuge established under State or local law. In the case of lands or other property that are owned by a State or political subdivision and are part of or included within a public park, recreation area or wildlife refuge established under State or local law on or after October 24, 1992 , no licensee may use the right of eminent domain under this section to acquire such lands or property unless there has been a public hearing held in the affected community and a finding by the Commission, after due consideration of expressed public views and the recommendations of the State or political subdivision that owns the lands or property, that the license will not interfere or be inconsistent with the purposes for which such lands or property are owned.
§ 815. Contract to furnish power extending beyond period of license; obligations of new licensee
Whenever the public interest requires or justifies the execution by the licensee of contracts for the sale and delivery of power for periods extending beyond the date of termination of the license, such contracts may be entered into upon the joint approval of the commission and of the public-service commission or other similar authority in the State in which the sale or delivery of power is made, or if sold or delivered in a State which has no such public-service commission, then upon the approval of the commission, and thereafter, in the event of failure to issue a new license to the original licensee at the termination of the license, the United States or the new licensee, as the case may be, shall assume and fulfill all such contracts.
§ 816. Preservation of rights vested prior to June 10, 1920
The provisions of this subchapter shall not be construed as affecting any permit or valid existing right-of-way granted prior to June 10, 1920 , or as confirming or otherwise affecting any claim, or as affecting any authority heretofore given pursuant to law, but any person, association, corporation, State, or municipality holding or possessing such permit, right-of-way or authority may apply for a license under this chapter, and upon such application the Commission may issue to any such applicant a license in accordance with the provisions of this subchapter and in such case the provisions of this chapter shall apply to such applicant as a licensee under this chapter: Provided , That when application is made for a license under this section for a project or projects already constructed the fair value of said project or projects determined as provided in this section, shall for the purposes of this subchapter and of said license be deemed to be the amount to be allowed as the net investment of the applicant in such project or projects as of the date of such license, or as of the date of such determination, if license has not been issued. Such fair value shall be determined by the Commission after notice and opportunity for hearing.
§ 817. Projects not affecting navigable waters; necessity for Federal license, permit or right-of-way; unauthorized activities
- (1) It shall be unlawful for any person, State, or municipality, for the purpose of developing electric power, to construct, operate, or maintain any dam, water conduit, reservoir, power house, or other works incidental thereto across, along, or in any of the navigable waters of the United States, or upon any part of the public lands or reservations of the United States (including the Territories), or utilize the surplus water or water power from any Government dam, except under and in accordance with the terms of a permit or valid existing right-of-way granted prior to June 10, 1920 , or a license granted pursuant to this chapter. Any person, association, corporation, State, or municipality intending to construct a dam or other project works, across, along, over, or in any stream or part thereof, other than those defined in this chapter as navigable waters, and over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States shall before such construction file declaration of such intention with the Commission, whereupon the Commission shall cause immediate investigation of such proposed construction to be made, and if upon investigation it shall find that the interests of interstate or foreign commerce would be affected by such proposed construction, such person, association, corporation, State, or municipality shall not construct, maintain, or operate such dam or other project works until it shall have applied for and shall have received a license under the provisions of this chapter. If the Commission shall not so find, and if no public lands or reservations are affected, permission is granted to construct such dam or other project works in such stream upon compliance with State laws.
- (2) No person may commence any significant modification of any project licensed under, or exempted from, this chapter unless such modification is authorized in accordance with terms and conditions of such license or exemption and the applicable requirements of this subchapter. As used in this paragraph, the term “commence” refers to the beginning of physical on-site activity other than surveys or testing.
§ 818. Public lands included in project; reservation of lands from entry
Any lands of the United States included in any proposed project under the provisions of this subchapter shall from the date of filing of application therefor be reserved from entry, location, or other disposal under the laws of the United States until otherwise directed by the Commission or by Congress. Notice that such application has been made, together with the date of filing thereof and a description of the lands of the United States affected thereby, shall be filed in the local land office for the district in which such lands are located. Whenever the Commission shall determine that the value of any lands of the United States so applied for, or heretofore or hereafter reserved or classified as power sites, will not be injured or destroyed for the purposes of power development by location, entry, or selection under the public-land laws, the Secretary of the Interior, upon notice of such determination, shall declare such lands open to location, entry, or selection, for such purpose or purposes and under such restrictions as the Commission may determine, subject to and with a reservation of the right of the United States or its permittees or licensees to enter upon, occupy, and use any part or all of said lands necessary, in the judgment of the Commission, for the purposes of this subchapter, which right shall be expressly reserved in every patent issued for such lands; and no claim or right to compensation shall accrue from the occupation or use of any of said lands for said purposes. The United States or any licensee for any such lands hereunder may enter thereupon for the purposes of this subchapter, upon payment of any damages to crops, buildings, or other improvements caused thereby to the owner thereof, or upon giving a good and sufficient bond to the United States for the use and benefit of the owner to secure the payment of such damages as may be determined and fixed in an action brought upon the bond in a court of competent jurisdiction, said bond to be in the form prescribed by the Commission: Provided , That locations, entries, selections, or filings heretofore made for lands reserved as water-power sites, or in connection with water-power development, or electrical transmission may proceed to approval or patent under and subject to the limitations and conditions in this section contained: Provided further , That before any lands applied for, or heretofore or hereafter reserved, or classified as power sites, are declared open to location, entry, or selection by the Secretary of the Interior, notice of intention to make such declaration shall be given to the Governor of the State within which such lands are located, and such State shall have ninety days from the date of such notice within which to file, under any statute or regulation applicable thereto, an application for the reservation to the State, or any political subdivision thereof, of any lands required as a right-of-way for a public highway or as a source of materials for the construction and maintenance of such highways, and a copy of such application shall be filed with the Federal Power Commission; and any location, entry, or selection of such lands, or subsequent patent thereof, shall be subject to any rights granted the State pursuant to such application.
§ 819. Repealed. Aug. 26, 1935, ch. 687 , title II, § 212, 49 Stat. 847
§ 820. Proceedings for revocation of license or to prevent violations of license
The Attorney General may, on request of the commission or of the Secretary of the Army, institute proceedings in equity in the district court of the United States in the district in which any project or part thereof is situated for the purpose of revoking for violation of its terms any permit or license issued hereunder, or for the purpose of remedying or correcting by injunction, mandamus, or other process any act of commission or omission in violation of the provisions of this chapter or of any lawful regulation or order promulgated hereunder. The district courts shall have jurisdiction over all of the above-mentioned proceedings and shall have power to issue and execute all necessary process and to make and enforce all writs, orders and decrees to compel compliance with the lawful orders and regulations of the commission and of the Secretary of the Army, and to compel the performance of any condition imposed under the provisions of this chapter. In the event a decree revoking a license is entered, the court is empowered to sell the whole or any part of the project or projects under license, to wind up the business of such licensee conducted in connection with such project or projects, to distribute the proceeds to the parties entitled to the same, and to make and enforce such further orders and decrees as equity and justice may require. At such sale or sales the vendee shall take the rights and privileges belonging to the licensee and shall perform the duties of such licensee and assume all outstanding obligations and liabilities of the licensee which the court may deem equitable in the premises; and at such sale or sales the United States may become a purchaser, but it shall not be required to pay a greater amount than it would be required to pay under the provisions of section 807 of this title at the termination of the license.
§ 821. State laws and water rights unaffected
Nothing contained in this chapter shall be construed as affecting or intending to affect or in any way to interfere with the laws of the respective States relating to the control, appropriation, use, or distribution of water used in irrigation or for municipal or other uses, or any vested right acquired therein.
§ 822. Reservation of right to alter or repeal chapter
The right to alter, amend, or repeal this chapter is expressly reserved; but no such alteration, amendment, or repeal shall affect any license theretofore issued under the provisions of this chapter or the rights of any licensee thereunder.
§ 823. Repeal of inconsistent laws
All Acts or parts of Acts inconsistent with this chapter are repealed: Provided , That nothing contained herein shall be held or construed to modify or repeal any of the provisions of the Act of Congress approved December 19, 1913 , granting certain rights-of-way to the city and county of San Francisco, in the State of California.
§ 823a. Conduit hydroelectric facilities
- (a)
- (1) A qualifying conduit hydropower facility shall not be required to be licensed under this subchapter.
- (2)
- (A) Any person, State, or municipality proposing to construct a qualifying conduit hydropower facility shall file with the Commission a notice of intent to construct such facility. The notice shall include sufficient information to demonstrate that the facility meets the qualifying criteria.
- (B) Not later than 15 days after receipt of a notice of intent filed under subparagraph (A), the Commission shall—
- (i) make an initial determination as to whether the facility meets the qualifying criteria; and
- (ii) if the Commission makes an initial determination, pursuant to clause (i), that the facility meets the qualifying criteria, publish public notice of the notice of intent filed under subparagraph (A).
- (C) If, not later than 30 days after the date of publication of the public notice described in subparagraph (B)(ii)—
- (i) an entity contests whether the facility meets the qualifying criteria, the Commission shall promptly issue a written determination as to whether the facility meets such criteria; or
- (ii) no entity contests whether the facility meets the qualifying criteria, the facility shall be deemed to meet such criteria.
- (3) For purposes of this section:
- (A) The term “conduit” means any tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
- (B) The term “qualifying conduit hydropower facility” means a facility (not including any dam or other impoundment) that is determined or deemed under paragraph (2)(C) to meet the qualifying criteria.
- (C) The term “qualifying criteria” means, with respect to a facility—
- (i) the facility is constructed, operated, or maintained for the generation of electric power and uses for such generation only the hydroelectric potential of a non-federally owned conduit;
- (ii) the facility has an installed capacity that does not exceed 40 megawatts; and
- (iii) on or before August 9, 2013 , the facility is not licensed under, or exempted from the license requirements contained in, this subchapter.
- (b) Subject to subsection (c), the Commission may grant an exemption in whole or in part from the requirements of this subchapter, including any license requirements contained in this subchapter, to any facility (not including any dam or other impoundment) constructed, operated, or maintained for the generation of electric power which the Commission determines, by rule or order—
- (1) utilizes for such generation only the hydroelectric potential of a conduit; and
- (2) has an installed capacity that does not exceed 40 megawatts.
- (c) In making the determination under subsection (b) the Commission shall consult with the United States Fish and Wildlife Service 1 1 So in original. Probably should be followed by a comma. National Marine Fisheries Service 1 and the State agency exercising administration over the fish and wildlife resources of the State in which the facility is or will be located, in the manner provided by the Fish and Wildlife Coordination Act ( 16 U.S.C. 661 , et seq.), and shall include in any such exemption—
- (1) such terms and conditions as the Fish and Wildlife Service 1 National Marine Fisheries Service 1 and the State agency each determine are appropriate to prevent loss of, or damage to, such resources and to otherwise carry out the purposes of such Act, and
- (2) such terms and conditions as the Commission deems appropriate to insure that such facility continues to comply with the provisions of this section and terms and conditions included in any such exemption.
- (d) Any violation of a term or condition of any exemption granted under subsection (b) shall be treated as a violation of a rule or order of the Commission under this chapter.
- (e) The Commission, in addition to the requirements of section 803(e) of this title , shall establish fees which shall be paid by an applicant for a license or exemption for a project that is required to meet terms and conditions set by fish and wildlife agencies under subsection (c). Such fees shall be adequate to reimburse the fish and wildlife agencies referred to in subsection (c) for any reasonable costs incurred in connection with any studies or other reviews carried out by such agencies for purposes of compliance with this section. The fees shall, subject to annual appropriations Acts, be transferred to such agencies by the Commission for use solely for purposes of carrying out such studies and shall remain available until expended.
§ 823b. Enforcement
- (a) The Commission shall monitor and investigate compliance with each license and permit issued under this subchapter and with each exemption granted from any requirement of this subchapter. The Commission shall conduct such investigations as may be necessary and proper in accordance with this chapter. After notice and opportunity for public hearing, the Commission may issue such orders as necessary to require compliance with the terms and conditions of licenses and permits issued under this subchapter and with the terms and conditions of exemptions granted from any requirement of this subchapter.
- (b) After notice and opportunity for an evidentiary hearing, the Commission may also issue an order revoking any license issued under this subchapter or any exemption granted from any requirement of this subchapter where any licensee or exemptee is found by the Commission:
- (1) to have knowingly violated a final order issued under subsection (a) after completion of judicial review (or the opportunity for judicial review); and
- (2) to have been given reasonable time to comply fully with such order prior to commencing any revocation proceeding.
- (c) Any licensee, permittee, or exemptee who violates or fails or refuses to comply with any rule or regulation under this subchapter, any term, or condition of a license, permit, or exemption under this subchapter, or any order issued under subsection (a) shall be subject to a civil penalty in an amount not to exceed $10,000 for each day that such violation or failure or refusal continues. Such penalty shall be assessed by the Commission after notice and opportunity for public hearing. In determining the amount of a proposed penalty, the Commission shall take into consideration the nature and seriousness of the violation, failure, or refusal and the efforts of the licensee to remedy the violation, failure, or refusal in a timely manner. No civil penalty shall be assessed where revocation is ordered.
- (d)
- (1) Before issuing an order assessing a civil penalty against any person under this section, the Commission shall provide to such person notice of the proposed penalty. Such notice shall, except in the case of a violation of a final order issued under subsection (a), inform such person of his opportunity to elect in writing within 30 days after the date of receipt of such notice to have the procedures of paragraph (3) (in lieu of those of paragraph (2)) apply with respect to such assessment.
- (2)
- (A) In the case of the violation of a final order issued under subsection (a), or unless an election is made within 30 calendar days after receipt of notice under paragraph (1) to have paragraph (3) apply with respect to such penalty, the Commission shall assess the penalty, by order, after a determination of violation has been made on the record after an opportunity for an agency hearing pursuant to section 554 of title 5 before an administrative law judge appointed under section 3105 of such title 5. Such assessment order shall include the administrative law judge’s findings and the basis for such assessment.
- (B) Any person against whom a penalty is assessed under this paragraph may, within 60 calendar days after the date of the order of the Commission assessing such penalty, institute an action in the United States court of appeals for the appropriate judicial circuit for judicial review of such order in accordance with chapter 7 of title 5. The court shall have jurisdiction to enter a judgment affirming, modifying, or setting aside in whole or in Part, 1 1 So in original. Probably should not be capitalized. the order of the Commission, or the court may remand the proceeding to the Commission for such further action as the court may direct.
- (3)
- (A) In the case of any civil penalty with respect to which the procedures of this paragraph have been elected, the Commission shall promptly assess such penalty, by order, after the date of the receipt of the notice under paragraph (1) of the proposed penalty.
- (B) If the civil penalty has not been paid within 60 calendar days after the assessment order has been made under subparagraph (A), the Commission shall institute an action in the appropriate district court of the United States for an order affirming the assessment of the civil penalty. The court shall have authority to review de novo the law and the facts involved, and shall have jurisdiction to enter a judgment enforcing, modifying, and enforcing as so modified, or setting aside in whole or in Part, 1 such assessment.
- (C) Any election to have this paragraph apply may not be revoked except with the consent of the Commission.
- (4) The Commission may compromise, modify, or remit, with or without conditions, any civil penalty which may be imposed under this subsection, taking into consideration the nature and seriousness of the violation and the efforts of the licensee to remedy the violation in a timely manner at any time prior to a final decision by the court of appeals under paragraph (2) or by the district court under paragraph (3).
- (5) If any person fails to pay an assessment of a civil penalty after it has become a final and unappealable order under paragraph (2), or after the appropriate district court has entered final judgment in favor of the Commission under paragraph (3), the Commission shall institute an action to recover the amount of such penalty in any appropriate district court of the United States. In such action, the validity and appropriateness of such final assessment order or judgment shall not be subject to review.
- (6)
- (A) Notwithstanding the provisions of title 28 or of this chapter, the Commission may be represented by the general counsel of the Commission (or any attorney or attorneys within the Commission designated by the Chairman) who shall supervise, conduct, and argue any civil litigation to which paragraph (3) of this subsection applies (including any related collection action under paragraph (5)) in a court of the United States or in any other court, except the Supreme Court. However, the Commission or the general counsel shall consult with the Attorney General concerning such litigation, and the Attorney General shall provide, on request, such assistance in the conduct of such litigation as may be appropriate.
- (B) The Commission shall be represented by the Attorney General, or the Solicitor General, as appropriate, in actions under this subsection, except to the extent provided in subparagraph (A) of this paragraph.
§ 823c. Alaska State jurisdiction over small hydroelectric projects
- (a) Notwithstanding sections 797(e) and 817 of this title, the Commission shall discontinue exercising licensing and regulatory authority under this subchapter over qualifying project works in the State of Alaska, effective on the date on which the Commission certifies that the State of Alaska has in place a regulatory program for water-power development that—
- (1) protects the public interest, the purposes listed in paragraph (2), and the environment to the same extent provided by licensing and regulation by the Commission under this subchapter and other applicable Federal laws, including the Endangered Species Act ( 16 U.S.C. 1531 et seq.) and the Fish and Wildlife Coordination Act ( 16 U.S.C. 661 et seq.);
- (2) gives equal consideration to the purposes of—
- (A) energy conservation;
- (B) the protection, mitigation of damage to, and enhancement of, fish and wildlife (including related spawning grounds and habitat);
- (C) the protection of recreational opportunities;
- (D) the preservation of other aspects of environmental quality;
- (E) the interests of Alaska Natives; and
- (F) other beneficial public uses, including irrigation, flood control, water supply, and navigation; and
- (3) requires, as a condition of a license for any project works—
- (A) the construction, maintenance, and operation by a licensee at its own expense of such lights and signals as may be directed by the Secretary of the Department in which the Coast Guard is operating, and such fishways as may be prescribed by the Secretary of the Interior or the Secretary of Commerce, as appropriate;
- (B) the operation of any navigation facilities which may be constructed as part of any project to be controlled at all times by such reasonable rules and regulations as may be made by the Secretary of the Army; and
- (C) except as provided in subsection (j), conditions for the protection, mitigation, and enhancement of fish and wildlife based on recommendations received pursuant to the Fish and Wildlife Coordination Act ( 16 U.S.C. 661 et seq.) from the National Marine Fisheries Service, the United States Fish and Wildlife Service, and State fish and wildlife agencies.
- (b) For purposes of this section, the term “qualifying project works” means project works—
- (1) that are not part of a project licensed under this part or exempted from licensing under this subchapter or section 2705 of this title prior to November 9, 2000 ;
- (2) for which a preliminary permit, a license application, or an application for an exemption from licensing has not been accepted for filing by the Commission prior to November 9, 2000 (unless such application is withdrawn at the election of the applicant);
- (3) that are part of a project that has a power production capacity of 5,000 kilowatts or less;
- (4) that are located entirely within the boundaries of the State of Alaska; and
- (5) that are not located in whole or in part on any Indian reservation, a conservation system unit (as defined in section 3102(4) of this title ), or segment of a river designated for study for addition to the Wild and Scenic Rivers System.
- (c) In the case of nonqualifying project works that would be a qualifying project works but for the fact that the project has been licensed (or exempted from licensing) by the Commission prior to November 9, 2000 , the licensee of such project may in its discretion elect to make the project subject to licensing and regulation by the State of Alaska under this section.
- (d) With respect to projects located in whole or in part on a reservation, a conservation system unit, or the public lands, a State license or exemption from licensing shall be subject to—
- (1) the approval of the Secretary having jurisdiction over such lands; and
- (2) such conditions as the Secretary may prescribe.
- (e) The Commission shall consult with the Secretary of the Interior, the Secretary of Agriculture, and the Secretary of Commerce before certifying the State of Alaska’s regulatory program.
- (f) Nothing in this section shall preempt the application of Federal environmental, natural resources, or cultural resources protection laws according to their terms.
- (g) The State of Alaska shall notify the Commission not later than 30 days after making any significant modification to its regulatory program. The Commission shall periodically review the State’s program to ensure compliance with the provisions of this section.
- (h) Notwithstanding subsection (a), the Commission shall reassert its licensing and regulatory authority under this subchapter if the Commission finds that the State of Alaska has not complied with one or more of the requirements of this section.
- (i)
- (1) Upon application by the Governor of the State of Alaska, the Commission shall within 30 days commence a review of the State of Alaska’s regulatory program for water-power development to determine whether it complies with the requirements of subsection (a).
- (2) The Commission’s review required by paragraph (1) shall be completed within 1 year of initiation, and the Commission shall within 30 days thereafter issue a final order determining whether or not the State of Alaska’s regulatory program for water-power development complies with the requirements of subsection (a).
- (3) If the Commission fails to issue a final order in accordance with paragraph (2) the State of Alaska’s regulatory program for water-power development shall be deemed to be in compliance with subsection (a).
- (j) If the State of Alaska determines that a recommendation under subsection (a)(3)(C) is inconsistent with paragraphs (1) and (2) of subsection (a), the State of Alaska may decline to adopt all or part of the recommendations in accordance with the procedures established under section 803(j)(2) of this title .
§ 823d. Alternative conditions and prescriptions
- (a)
- (1) Whenever any person applies for a license for any project works within any reservation of the United States, and the Secretary of the department under whose supervision such reservation falls (referred to in this subsection as the “Secretary”) deems a condition to such license to be necessary under the first proviso of section 797(e) of this title , the license applicant or any other party to the license proceeding may propose an alternative condition.
- (2) Notwithstanding the first proviso of section 797(e) of this title , the Secretary shall accept the proposed alternative condition referred to in paragraph (1), and the Commission shall include in the license such alternative condition, if the Secretary determines, based on substantial evidence provided by the license applicant, any other party to the proceeding, or otherwise available to the Secretary, that such alternative condition—
- (A) provides for the adequate protection and utilization of the reservation; and
- (B) will either, as compared to the condition initially by the Secretary—
- (i) cost significantly less to implement; or
- (ii) result in improved operation of the project works for electricity production.
- (3) In making a determination under paragraph (2), the Secretary shall consider evidence provided for the record by any party to a licensing proceeding, or otherwise available to the Secretary, including any evidence provided by the Commission, on the implementation costs or operational impacts for electricity production of a proposed alternative.
- (4) The Secretary concerned shall submit into the public record of the Commission proceeding with any condition under section 797(e) of this title or alternative condition it accepts under this section, a written statement explaining the basis for such condition, and reason for not accepting any alternative condition under this section. The written statement must demonstrate that the Secretary gave equal consideration to the effects of the condition adopted and alternatives not accepted on energy supply, distribution, cost, and use; flood control; navigation; water supply; and air quality (in addition to the preservation of other aspects of environmental quality); based on such information as may be available to the Secretary, including information voluntarily provided in a timely manner by the applicant and others. The Secretary shall also submit, together with the aforementioned written statement, all studies, data, and other factual information available to the Secretary and relevant to the Secretary’s decision.
- (5) If the Commission finds that the Secretary’s final condition would be inconsistent with the purposes of this subchapter, or other applicable law, the Commission may refer the dispute to the Commission’s Dispute Resolution Service. The Dispute Resolution Service shall consult with the Secretary and the Commission and issue a non-binding advisory within 90 days. The Secretary may accept the Dispute Resolution Service advisory unless the Secretary finds that the recommendation will not adequately protect the reservation. The Secretary shall submit the advisory and the Secretary’s final written determination into the record of the Commission’s proceeding.
- (b)
- (1) Whenever the Secretary of the Interior or the Secretary of Commerce prescribes a fishway under section 811 of this title , the license applicant or any other party to the license proceeding may propose an alternative to such prescription to construct, maintain, or operate a fishway.
- (2) Notwithstanding section 811 of this title , the Secretary of the Interior or the Secretary of Commerce, as appropriate, shall accept and prescribe, and the Commission shall require, the proposed alternative referred to in paragraph (1), if the Secretary of the appropriate department determines, based on substantial evidence provided by the license applicant, any other party to the proceeding, or otherwise available to the Secretary, that such alternative—
- (A) will be no less protective than the fishway initially prescribed by the Secretary; and
- (B) will either, as compared to the fishway initially prescribed by the Secretary—
- (i) cost significantly less to implement; or
- (ii) result in improved operation of the project works for electricity production.
- (3) In making a determination under paragraph (2), the Secretary shall consider evidence provided for the record by any party to a licensing proceeding, or otherwise available to the Secretary, including any evidence provided by the Commission, on the implementation costs or operational impacts for electricity production of a proposed alternative.
- (4) The Secretary concerned shall submit into the public record of the Commission proceeding with any prescription under section 811 of this title or alternative prescription it accepts under this section, a written statement explaining the basis for such prescription, and reason for not accepting any alternative prescription under this section. The written statement must demonstrate that the Secretary gave equal consideration to the effects of the prescription adopted and alternatives not accepted on energy supply, distribution, cost, and use; flood control; navigation; water supply; and air quality (in addition to the preservation of other aspects of environmental quality); based on such information as may be available to the Secretary, including information voluntarily provided in a timely manner by the applicant and others. The Secretary shall also submit, together with the aforementioned written statement, all studies, data, and other factual information available to the Secretary and relevant to the Secretary’s decision.
- (5) If the Commission finds that the Secretary’s final prescription would be inconsistent with the purposes of this subchapter, or other applicable law, the Commission may refer the dispute to the Commission’s Dispute Resolution Service. The Dispute Resolution Service shall consult with the Secretary and the Commission and issue a non-binding advisory within 90 days. The Secretary may accept the Dispute Resolution Service advisory unless the Secretary finds that the recommendation will not adequately protect the fish resources. The Secretary shall submit the advisory and the Secretary’s final written determination into the record of the Commission’s proceeding.
§ 823e. Promoting hydropower development at existing nonpowered dams
- (a)
- (1) As provided in this section, the Commission may issue and amend licenses, as appropriate, for any facility the Commission determines is a qualifying facility.
- (2) Not later than 180 days after October 23, 2018 , the Commission shall issue a rule establishing an expedited process for issuing and amending licenses for qualifying facilities under this section.
- (3)
- (A) In establishing the expedited process under this section, the Commission shall convene an interagency task force, with appropriate Federal and State agencies and Indian tribes represented, to coordinate the regulatory processes associated with the authorizations required to construct and operate a qualifying facility.
- (B) The task force shall develop procedures that are consistent with subsection (e)(1)(E) to seek to ensure that, for projects licensed pursuant to this section, the Commission and appropriate Federal and State agencies and Indian tribes shall exercise their authorities in a manner that, to the extent practicable, will not result in any material change to the storage, release, or flow operations of the associated nonpowered dam existing at the time an applicant files its license application.
- (4) The Commission shall seek to ensure that the expedited process under this section will result in a final decision on an application for a license by not later than 2 years after receipt of a completed application for the license.
- (b)
- (1) Before issuing any license for a qualifying facility, the Commission shall assess the safety of existing non-Federal dams and other non-Federal structures related to the qualifying facility (including possible consequences associated with failure of such structures).
- (2) In issuing any license for a qualifying facility at a non-Federal dam, the Commission shall ensure that the Commission’s dam safety requirements apply to such qualifying facility, and the associated qualifying nonpowered dam, over the term of such license.
- (c) Interagency cooperation in the preparation of environmental documents under the National Environmental Policy Act of 1969 ( 42 U.S.C. 4321 et seq.) with respect to an application for a license for a qualifying facility under this section, and interagency communications relating to licensing process coordination pursuant to this section, shall not—
- (1) be considered to be ex parte communications under Commission rules; or
- (2) preclude an agency from participating in a licensing proceeding under this subchapter, providing that any agency participating as a party in a licensing proceeding under this subchapter shall, to the extent practicable, demonstrate a separation of staff cooperating with the Commission under the National Environmental Policy Act 1 1 So in original. Probably should be followed by “of 1969”. ( 42 U.S.C. 4321 et seq.) and staff participating in the applicable proceeding under this subchapter.
- (d)
- (1) Not later than 12 months after October 23, 2018 , the Commission, with the Secretary of the Army, the Secretary of the Interior, and the Secretary of Agriculture, shall jointly develop a list of existing nonpowered Federal dams that the Commission and the Secretaries agree have the greatest potential for non-Federal hydropower development.
- (2) In developing the list under paragraph (1), the Commission and the Secretaries may consider the following:
- (A) The compatibility of hydropower generation with existing purposes of the dam.
- (B) The proximity of the dam to existing transmission resources.
- (C) The existence of studies to characterize environmental, cultural, and historic resources relating to the dam.
- (D) The effects of hydropower development on release or flow operations of the dam.
- (3) The Commission shall—
- (A) provide the list developed under paragraph (1) to—
- (i) the Committee on Energy and Commerce, the Committee on Transportation and Infrastructure, and the Committee on Natural Resources, of the House of Representatives; and
- (ii) the Committee on Environment and Public Works, and the Committee on Energy and Natural Resources, of the Senate; and
- (B) make such list available to the public.
- (A) provide the list developed under paragraph (1) to—
- (e) For purposes of this section:
- (1) The term “qualifying criteria” means, with respect to a facility—
- (A) as of October 23, 2018 , the facility is not licensed under, or exempted from the license requirements contained in, this subchapter;
- (B) the facility will be associated with a qualifying nonpowered dam;
- (C) the facility will be constructed, operated, and maintained for the generation of electric power;
- (D) the facility will use for such generation any withdrawals, diversions, releases, or flows from the associated qualifying nonpowered dam, including its associated impoundment or other infrastructure; and
- (E) the operation of the facility will not result in any material change to the storage, release, or flow operations of the associated qualifying nonpowered dam.
- (2) The term “qualifying facility” means a facility that is determined under this section to meet the qualifying criteria.
- (3) The term “qualifying nonpowered dam” means any dam, dike, embankment, or other barrier—
- (A) the construction of which was completed on or before October 23, 2018 ;
- (B) that is or was operated for the control, release, or distribution of water for agricultural, municipal, navigational, industrial, commercial, environmental, recreational, aesthetic, drinking water, or flood control purposes; and
- (C) that, as of October 23, 2018 , is not generating electricity with hydropower generating works that are licensed under, or exempted from the license requirements contained in, this subchapter.
- (1) The term “qualifying criteria” means, with respect to a facility—
- (f) Nothing in this section affects—
- (1) any authority of the Commission to license a facility at a nonpowered dam under this subchapter; and
- (2) any authority of the Commission to issue an exemption to a small hydroelectric power project under the Public Utility Regulatory Policies Act of 1978.
§ 823f. Closed-loop pumped storage projects
- (a)
- (1) As provided in this section, the Commission may issue and amend licenses, as appropriate, for closed-loop pumped storage projects.
- (2) Not later than 180 days after October 23, 2018 , the Commission shall issue a rule establishing an expedited process for issuing and amending licenses for closed-loop pumped storage projects under this section.
- (3) In establishing the expedited process under this section, the Commission shall convene an interagency task force, with appropriate Federal and State agencies and Indian tribes represented, to coordinate the regulatory processes associated with the authorizations required to construct and operate closed-loop pumped storage projects.
- (4) The Commission shall seek to ensure that the expedited process under this section will result in final decision on an application for a license by not later than 2 years after receipt of a completed application for such license.
- (b) Before issuing any license for a closed-loop pumped storage project, the Commission shall assess the safety of existing dams and other structures related to the project (including possible consequences associated with failure of such structures).
- (c)
- (1) In issuing or amending a license for a closed-loop pumped storage project pursuant to the expedited process established under this section, the Commission may grant an exception from any other requirement of this subchapter with respect to any part of the closed-loop pumped storage project (not including any dam or other impoundment).
- (2) In granting an exception under paragraph (1), the Commission shall consult with the United States Fish and Wildlife Service, the National Marine Fisheries Service, and the State agency exercising administration over the fish and wildlife resources of the State in which the closed-loop pumped storage project is or will be located, in the manner provided by the Fish and Wildlife Coordination Act ( 16 U.S.C. 661 et seq.).
- (3) In granting an exception under paragraph (1), the Commission shall include in any such exception—
- (A) such terms and conditions as the United States Fish and Wildlife Service, the National Marine Fisheries Service, and the State agency described in paragraph (2) each determine are appropriate to prevent loss of, or damage to, fish and wildlife resources and to otherwise carry out the purposes of the Fish and Wildlife Coordination Act; and
- (B) such terms and conditions as the Commission deems appropriate to ensure that such closed-loop pumped storage project continues to comply with the provisions of this section and terms and conditions included in any such exception.
- (4) The Commission, in addition to the requirements of section 803(e) of this title , shall establish fees which shall be paid by an applicant for a license for a closed-loop pumped storage project that is required to meet terms and conditions set by fish and wildlife agencies under paragraph (3). Such fees shall be adequate to reimburse the fish and wildlife agencies referred to in paragraph (3) for any reasonable costs incurred in connection with any studies or other reviews carried out by such agencies for purposes of compliance with this section. The fees shall, subject to annual appropriations Acts, be transferred to such agencies by the Commission for use solely for purposes of carrying out such studies and shall remain available until expended.
- (d) Notwithstanding section 798 of this title , and regardless of whether the holder of a preliminary permit for a closed-loop pumped storage project claimed municipal preference under section 800(a) of this title when obtaining the permit, on request by a municipality, the Commission may, to facilitate development of a closed-loop pumped storage project—
- (1) add entities as joint permittees following issuance of a preliminary permit; and
- (2) transfer a license in part to one or more nonmunicipal entities as co-licensees with a municipality, if the municipality retains majority ownership of the project for which the license was issued.
- (e) Interagency cooperation in the preparation of environmental documents under the National Environmental Policy Act of 1969 ( 42 U.S.C. 4321 et seq.) with respect to an application for a license for a closed-loop pumped storage project submitted pursuant to this section, and interagency communications relating to licensing process coordination pursuant to this section, shall not—
- (1) be considered to be ex parte communications under Commission rules; or
- (2) preclude an agency from participating in a licensing proceeding under this subchapter, providing that any agency participating as a party in a licensing proceeding under this subchapter shall, to the extent practicable, demonstrate a separation of staff cooperating with the Commission under the National Environmental Policy Act 1 1 So in original. Probably should be followed by “of 1969”. ( 42 U.S.C. 4321 et seq.) and staff participating in the applicable proceeding under this subchapter.
- (f)
- (1) Not later than 6 months after October 23, 2018 , the Commission shall hold a workshop to explore potential opportunities for development of closed-loop pumped storage projects at abandoned mine sites.
- (2) Not later than 1 year after October 23, 2018 , the Commission shall issue guidance to assist applicants for licenses or preliminary permits for closed-loop pumped storage projects at abandoned mine sites.
- (g)
- (1) The Commission shall establish criteria that a pumped storage project shall meet in order to qualify as a closed-loop pumped storage project eligible for the expedited process established under this section.
- (2) In establishing the criteria under paragraph (1), the Commission shall include criteria requiring that the pumped storage project—
- (A) cause little to no change to existing surface and ground water flows and uses; and
- (B) is unlikely to adversely affect species listed as a threatened species or endangered species under the Endangered Species Act of 1973 [ 16 U.S.C. 1531 et seq.].
- (h) Nothing in this section affects any authority of the Commission to license a closed-loop pumped storage project under this subchapter.
§ 823g. Considerations for relicensing terms
- (a) In determining the term of a new license issued when an existing license under this subchapter expires, the Commission shall take into consideration, among other things—
- (1) project-related investments by the licensee under the new license; and
- (2) project-related investments by the licensee over the term of the existing license.
- (b) The determination of the Commission under subsection (a) shall give equal weight to—
- (1) investments by the licensee to implement the new license under this subchapter, including investments relating to redevelopment, new construction, new capacity, efficiency, modernization, rehabilitation or replacement of major equipment, safety improvements, or environmental, recreation, or other protection, mitigation, or enhancement measures required or authorized by the new license; and
- (2) investments by the licensee over the term of the existing license (including any terms under annual licenses) that—
- (A) resulted in redevelopment, new construction, new capacity, efficiency, modernization, rehabilitation or replacement of major equipment, safety improvements, or environmental, recreation, or other protection, mitigation, or enhancement measures conducted over the term of the existing license; and
- (B) were not expressly considered by the Commission as contributing to the length of the existing license term in any order establishing or extending the existing license term.
- (c) At the request of the licensee, the Commission shall make a determination as to whether any planned, ongoing, or completed investment meets the criteria under subsection (b)(2). Any determination under this subsection shall be issued within 60 days following receipt of the licensee’s request. When issuing its determination under this subsection, the Commission shall not assess the incremental number of years that the investment may add to the new license term. All such assessment shall occur only as provided in subsection (a).
§ 824. Declaration of policy; application of subchapter
- (a) It is declared that the business of transmitting and selling electric energy for ultimate distribution to the public is affected with a public interest, and that Federal regulation of matters relating to generation to the extent provided in this subchapter and subchapter III of this chapter and of that part of such business which consists of the transmission of electric energy in interstate commerce and the sale of such energy at wholesale in interstate commerce is necessary in the public interest, such Federal regulation, however, to extend only to those matters which are not subject to regulation by the States.
- (b)
- (1) The provisions of this subchapter shall apply to the transmission of electric energy in interstate commerce and to the sale of electric energy at wholesale in interstate commerce, but except as provided in paragraph (2) shall not apply to any other sale of electric energy or deprive a State or State commission of its lawful authority now exercised over the exportation of hydroelectric energy which is transmitted across a State line. The Commission shall have jurisdiction over all facilities for such transmission or sale of electric energy, but shall not have jurisdiction, except as specifically provided in this subchapter and subchapter III of this chapter, over facilities used for the generation of electric energy or over facilities used in local distribution or only for the transmission of electric energy in intrastate commerce, or over facilities for the transmission of electric energy consumed wholly by the transmitter.
- (2) Notwithstanding subsection (f), the provisions of sections 824b(a)(2), 824e(e), 824i, 824j, 824j–1, 824k, 824 o , 824 o –1, 824p, 824q, 824r, 824s, 824t, 824u, and 824v of this title shall apply to the entities described in such provisions, and such entities shall be subject to the jurisdiction of the Commission for purposes of carrying out such provisions and for purposes of applying the enforcement authorities of this chapter with respect to such provisions. Compliance with any order or rule of the Commission under the provisions of section 824b(a)(2), 824e(e), 824i, 824j, 824j–1, 824k, 824 o , 824 o –1, 824p, 824q, 824r, 824s, 824t, 824u, or 824v of this title, shall not make an electric utility or other entity subject to the jurisdiction of the Commission for any purposes other than the purposes specified in the preceding sentence.
- (c) For the purpose of this subchapter, electric energy shall be held to be transmitted in interstate commerce if transmitted from a State and consumed at any point outside thereof; but only insofar as such transmission takes place within the United States.
- (d) The term “sale of electric energy at wholesale” when used in this subchapter, means a sale of electric energy to any person for resale.
- (e) The term “public utility” when used in this subchapter and subchapter III of this chapter means any person who owns or operates facilities subject to the jurisdiction of the Commission under this subchapter (other than facilities subject to such jurisdiction solely by reason of section 824e(e), 824e(f), 1 1 So in original. Section 824e of this title does not contain a subsec. (f). 824i, 824j, 824j–1, 824k, 824 o , 824 o –1, 824p, 824q, 824r, 824s, 824t, 824u, or 824v of this title).
- (f) No provision in this subchapter shall apply to, or be deemed to include, the United States, a State or any political subdivision of a State, an electric cooperative that receives financing under the Rural Electrification Act of 1936 ( 7 U.S.C. 901 et seq.) or that sells less than 4,000,000 megawatt hours of electricity per year, or any agency, authority, or instrumentality of any one or more of the foregoing, or any corporation which is wholly owned, directly or indirectly, by any one or more of the foregoing, or any officer, agent, or employee of any of the foregoing acting as such in the course of his official duty, unless such provision makes specific reference thereto.
- (g)
- (1) Upon written order of a State commission, a State commission may examine the books, accounts, memoranda, contracts, and records of—
- (A) an electric utility company subject to its regulatory authority under State law,
- (B) any exempt wholesale generator selling energy at wholesale to such electric utility, and
- (C) any electric utility company, or holding company thereof, which is an associate company or affiliate of an exempt wholesale generator which sells electric energy to an electric utility company referred to in subparagraph (A),
- (2) Where a State commission issues an order pursuant to paragraph (1), the State commission shall not publicly disclose trade secrets or sensitive commercial information.
- (3) Any United States district court located in the State in which the State commission referred to in paragraph (1) is located shall have jurisdiction to enforce compliance with this subsection.
- (4) Nothing in this section shall—
- (A) preempt applicable State law concerning the provision of records and other information; or
- (B) in any way limit rights to obtain records and other information under Federal law, contracts, or otherwise.
- (5) As used in this subsection the terms “affiliate”, “associate company”, “electric utility company”, “holding company”, “subsidiary company”, and “exempt wholesale generator” shall have the same meaning as when used in the Public Utility Holding Company Act of 2005 [ 42 U.S.C. 16451 et seq.].
- (1) Upon written order of a State commission, a State commission may examine the books, accounts, memoranda, contracts, and records of—
§ 824a. Interconnection and coordination of facilities; emergencies; transmission to foreign countries
- (a) For the purpose of assuring an abundant supply of electric energy throughout the United States with the greatest possible economy and with regard to the proper utilization and conservation of natural resources, the Commission is empowered and directed to divide the country into regional districts for the voluntary interconnection and coordination of facilities for the generation, transmission, and sale of electric energy, and it may at any time thereafter, upon its own motion or upon application, make such modifications thereof as in its judgment will promote the public interest. Each such district shall embrace an area which, in the judgment of the Commission, can economically be served by such interconnection and coordinated electric facilities. It shall be the duty of the Commission to promote and encourage such interconnection and coordination within each such district and between such districts. Before establishing any such district and fixing or modifying the boundaries thereof the Commission shall give notice to the State commission of each State situated wholly or in part within such district, and shall afford each such State commission reasonable opportunity to present its views and recommendations, and shall receive and consider such views and recommendations.
- (b) Whenever the Commission, upon application of any State commission or of any person engaged in the transmission or sale of electric energy, and after notice to each State commission and public utility affected and after opportunity for hearing, finds such action necessary or appropriate in the public interest it may by order direct a public utility (if the Commission finds that no undue burden will be placed upon such public utility thereby) to establish physical connection of its transmission facilities with the facilities of one or more other persons engaged in the transmission or sale of electric energy, to sell energy to or exchange energy with such persons: Provided , That the Commission shall have no authority to compel the enlargement of generating facilities for such purposes, nor to compel such public utility to sell or exchange energy when to do so would impair its ability to render adequate service to its customers. The Commission may prescribe the terms and conditions of the arrangement to be made between the persons affected by any such order, including the apportionment of cost between them and the compensation or reimbursement reasonably due to any of them.
- (c)
- (1) During the continuance of any war in which the United States is engaged, or whenever the Commission determines that an emergency exists by reason of a sudden increase in the demand for electric energy, or a shortage of electric energy or of facilities for the generation or transmission of electric energy, or of fuel or water for generating facilities, or other causes, the Commission shall have authority, either upon its own motion or upon complaint, with or without notice, hearing, or report, to require by order such temporary connections of facilities and such generation, delivery, interchange, or transmission of electric energy as in its judgment will best meet the emergency and serve the public interest. If the parties affected by such order fail to agree upon the terms of any arrangement between them in carrying out such order, the Commission, after hearing held either before or after such order takes effect, may prescribe by supplemental order such terms as it finds to be just and reasonable, including the compensation or reimbursement which should be paid to or by any such party.
- (2) With respect to an order issued under this subsection that may result in a conflict with a requirement of any Federal, State, or local environmental law or regulation, the Commission shall ensure that such order requires generation, delivery, interchange, or transmission of electric energy only during hours necessary to meet the emergency and serve the public interest, and, to the maximum extent practicable, is consistent with any applicable Federal, State, or local environmental law or regulation and minimizes any adverse environmental impacts.
- (3) To the extent any omission or action taken by a party, that is necessary to comply with an order issued under this subsection, including any omission or action taken to voluntarily comply with such order, results in noncompliance with, or causes such party to not comply with, any Federal, State, or local environmental law or regulation, such omission or action shall not be considered a violation of such environmental law or regulation, or subject such party to any requirement, civil or criminal liability, or a citizen suit under such environmental law or regulation.
- (4)
- (A) An order issued under this subsection that may result in a conflict with a requirement of any Federal, State, or local environmental law or regulation shall expire not later than 90 days after it is issued. The Commission may renew or reissue such order pursuant to paragraphs (1) and (2) for subsequent periods, not to exceed 90 days for each period, as the Commission determines necessary to meet the emergency and serve the public interest.
- (B) In renewing or reissuing an order under subparagraph (A), the Commission shall consult with the primary Federal agency with expertise in the environmental interest protected by such law or regulation, and shall include in any such renewed or reissued order such conditions as such Federal agency determines necessary to minimize any adverse environmental impacts to the extent practicable. The conditions, if any, submitted by such Federal agency shall be made available to the public. The Commission may exclude such a condition from the renewed or reissued order if it determines that such condition would prevent the order from adequately addressing the emergency necessitating such order and provides in the order, or otherwise makes publicly available, an explanation of such determination.
- (5) If an order issued under this subsection is subsequently stayed, modified, or set aside by a court pursuant to section 825 l of this title or any other provision of law, any omission or action previously taken by a party that was necessary to comply with the order while the order was in effect, including any omission or action taken to voluntarily comply with the order, shall remain subject to paragraph (3).
- (d) During the continuance of any emergency requiring immediate action, any person or municipality engaged in the transmission or sale of electric energy and not otherwise subject to the jurisdiction of the Commission may make such temporary connections with any public utility subject to the jurisdiction of the Commission or may construct such temporary facilities for the transmission of electric energy in interstate commerce as may be necessary or appropriate to meet such emergency, and shall not become subject to the jurisdiction of the Commission by reason of such temporary connection or temporary construction: Provided , That such temporary connection shall be discontinued or such temporary construction removed or otherwise disposed of upon the termination of such emergency: Provided further , That upon approval of the Commission permanent connections for emergency use only may be made hereunder.
- (e) After six months from August 26, 1935 , no person shall transmit any electric energy from the United States to a foreign country without first having secured an order of the Commission authorizing it to do so. The Commission shall issue such order upon application unless, after opportunity for hearing, it finds that the proposed transmission would impair the sufficiency of electric supply within the United States or would impede or tend to impede the coordination in the public interest of facilities subject to the jurisdiction of the Commission. The Commission may by its order grant such application in whole or in part, with such modifications and upon such terms and conditions as the Commission may find necessary or appropriate, and may from time to time, after opportunity for hearing and for good cause shown, make such supplemental orders in the premises as it may find necessary or appropriate.
- (f) The ownership or operation of facilities for the transmission or sale at wholesale of electric energy which is (a) generated within a State and transmitted from the State across an international boundary and not thereafter transmitted into any other State, or (b) generated in a foreign country and transmitted across an international boundary into a State and not thereafter transmitted into any other State, shall not make a person a public utility subject to regulation as such under other provisions of this subchapter. The State within which any such facilities are located may regulate any such transaction insofar as such State regulation does not conflict with the exercise of the Commission’s powers under or relating to subsection (e).
- (g) In order to insure continuity of service to customers of public utilities, the Commission shall require, by rule, each public utility to—
- (1) report promptly to the Commission and any appropriate State regulatory authorities any anticipated shortage of electric energy or capacity which would affect such utility’s capability of serving its wholesale customers,
- (2) submit to the Commission, and to any appropriate State regulatory authority, and periodically revise, contingency plans respecting—
- (A) shortages of electric energy or capacity, and
- (B) circumstances which may result in such shortages, and
- (3) accommodate any such shortages or circumstances in a manner which shall—
- (A) give due consideration to the public health, safety, and welfare, and
- (B) provide that all persons served directly or indirectly by such public utility will be treated, without undue prejudice or disadvantage.
§ 824b. Disposition of property; consolidations; purchase of securities
- (a)
- (1) No public utility shall, without first having secured an order of the Commission authorizing it to do so—
- (A) sell, lease, or otherwise dispose of the whole of its facilities subject to the jurisdiction of the Commission, or any part thereof of a value in excess of $10,000,000;
- (B) merge or consolidate, directly or indirectly, its facilities subject to the jurisdiction of the Commission, or any part thereof, with the facilities of any other person, or any part thereof, that are subject to the jurisdiction of the Commission and have a value in excess of $10,000,000, by any means whatsoever;
- (C) purchase, acquire, or take any security with a value in excess of $10,000,000 of any other public utility; or
- (D) purchase, lease, or otherwise acquire an existing generation facility—
- (i) that has a value in excess of $10,000,000; and
- (ii) that is used for interstate wholesale sales and over which the Commission has jurisdiction for ratemaking purposes.
- (2) No holding company in a holding company system that includes a transmitting utility or an electric utility shall purchase, acquire, or take any security with a value in excess of $10,000,000 of, or, by any means whatsoever, directly or indirectly, merge or consolidate with, a transmitting utility, an electric utility company, or a holding company in a holding company system that includes a transmitting utility, or an electric utility company, with a value in excess of $10,000,000 without first having secured an order of the Commission authorizing it to do so.
- (3) Upon receipt of an application for such approval the Commission shall give reasonable notice in writing to the Governor and State commission of each of the States in which the physical property affected, or any part thereof, is situated, and to such other persons as it may deem advisable.
- (4) After notice and opportunity for hearing, the Commission shall approve the proposed disposition, consolidation, acquisition, or change in control, if it finds that the proposed transaction will be consistent with the public interest, and will not result in cross-subsidization of a non-utility associate company or the pledge or encumbrance of utility assets for the benefit of an associate company, unless the Commission determines that the cross-subsidization, pledge, or encumbrance will be consistent with the public interest.
- (5) The Commission shall, by rule, adopt procedures for the expeditious consideration of applications for the approval of dispositions, consolidations, or acquisitions, under this section. Such rules shall identify classes of transactions, or specify criteria for transactions, that normally meet the standards established in paragraph (4). The Commission shall provide expedited review for such transactions. The Commission shall grant or deny any other application for approval of a transaction not later than 180 days after the application is filed. If the Commission does not act within 180 days, such application shall be deemed granted unless the Commission finds, based on good cause, that further consideration is required to determine whether the proposed transaction meets the standards of paragraph (4) and issues an order tolling the time for acting on the application for not more than 180 days, at the end of which additional period the Commission shall grant or deny the application.
- (6) For purposes of this subsection, the terms “associate company”, “holding company”, and “holding company system” have the meaning given those terms in the Public Utility Holding Company Act of 2005 [ 42 U.S.C. 16451 et seq.].
- (7)
- (A) Not later than 180 days after September 28, 2018 , the Commission shall promulgate a rule requiring any public utility that is seeking to merge or consolidate, directly or indirectly, its facilities subject to the jurisdiction of the Commission, or any part thereof, with those of any other person, to notify the Commission of such transaction not later than 30 days after the date on which the transaction is consummated if—
- (i) the facilities, or any part thereof, to be acquired are of a value in excess of $1,000,000; and
- (ii) such public utility is not required to secure an order of the Commission under paragraph (1)(B).
- (B) In establishing any notification requirement under subparagraph (A), the Commission shall, to the maximum extent practicable, minimize the paperwork burden resulting from the collection of information.
- (A) Not later than 180 days after September 28, 2018 , the Commission shall promulgate a rule requiring any public utility that is seeking to merge or consolidate, directly or indirectly, its facilities subject to the jurisdiction of the Commission, or any part thereof, with those of any other person, to notify the Commission of such transaction not later than 30 days after the date on which the transaction is consummated if—
- (1) No public utility shall, without first having secured an order of the Commission authorizing it to do so—
- (b) The Commission may grant any application for an order under this section in whole or in part and upon such terms and conditions as it finds necessary or appropriate to secure the maintenance of adequate service and the coordination in the public interest of facilities subject to the jurisdiction of the Commission. The Commission may from time to time for good cause shown make such orders supplemental to any order made under this section as it may find necessary or appropriate.
§ 824c. Issuance of securities; assumption of liabilities
- (a) No public utility shall issue any security, or assume any obligation or liability as guarantor, indorser, surety, or otherwise in respect of any security of another person, unless and until, and then only to the extent that, upon application by the public utility, the Commission by order authorizes such issue or assumption of liability. The Commission shall make such order only if it finds that such issue or assumption (a) is for some lawful object, within the corporate purposes of the applicant and compatible with the public interest, which is necessary or appropriate for or consistent with the proper performance by the applicant of service as a public utility and which will not impair its ability to perform that service, and (b) is reasonably necessary or appropriate for such purposes. The provisions of this section shall be effective six months after August 26, 1935 .
- (b) The Commission, after opportunity for hearing, may grant any application under this section in whole or in part, and with such modifications and upon such terms and conditions as it may find necessary or appropriate, and may from time to time, after opportunity for hearing and for good cause shown, make such supplemental orders in the premises as it may find necessary or appropriate, and may by any such supplemental order modify the provisions of any previous order as to the particular purposes, uses, and extent to which, or the conditions under which, any security so theretofore authorized or the proceeds thereof may be applied, subject always to the requirements of subsection (a) of this section.
- (c) No public utility shall, without the consent of the Commission, apply any security or any proceeds thereof to any purpose not specified in the Commission’s order, or supplemental order, or to any purpose in excess of the amount allowed for such purpose in such order, or otherwise in contravention of such order.
- (d) The Commission shall not authorize the capitalization of the right to be a corporation or of any franchise, permit, or contract for consolidation, merger, or lease in excess of the amount (exclusive of any tax or annual charge) actually paid as the consideration for such right, franchise, permit, or contract.
- (e) Subsection (a) shall not apply to the issue or renewal of, or assumption of liability on, a note or draft maturing not more than one year after the date of such issue, renewal, or assumption of liability, and aggregating (together with all other then outstanding notes and drafts of a maturity of one year or less on which such public utility is primarily or secondarily liable) not more than 5 per centum of the par value of the other securities of the public utility then outstanding. In the case of securities having no par value, the par value for the purpose of this subsection shall be the fair market value as of the date of issue. Within ten days after any such issue, renewal, or assumption of liability, the public utility shall file with the Commission a certificate of notification, in such form as may be prescribed by the Commission, setting forth such matters as the Commission shall by regulation require.
- (f) The provisions of this section shall not extend to a public utility organized and operating in a State under the laws of which its security issues are regulated by a State commission.
- (g) Nothing in this section shall be construed to imply any guarantee or obligation on the part of the United States in respect of any securities to which the provisions of this section relate.
- (h) Any public utility whose security issues are approved by the Commission under this section may file with the Securities and Exchange Commission duplicate copies of reports filed with the Federal Power Commission in lieu of the reports, information, and documents required under sections 77g, 78 l , and 78m of title 15.
§ 824d. Rates and charges; schedules; suspension of new rates; automatic adjustment clauses
- (a) All rates and charges made, demanded, or received by any public utility for or in connection with the transmission or sale of electric energy subject to the jurisdiction of the Commission, and all rules and regulations affecting or pertaining to such rates or charges shall be just and reasonable, and any such rate or charge that is not just and reasonable is hereby declared to be unlawful.
- (b) No public utility shall, with respect to any transmission or sale subject to the jurisdiction of the Commission, (1) make or grant any undue preference or advantage to any person or subject any person to any undue prejudice or disadvantage, or (2) maintain any unreasonable difference in rates, charges, service, facilities, or in any other respect, either as between localities or as between classes of service.
- (c) Under such rules and regulations as the Commission may prescribe, every public utility shall file with the Commission, within such time and in such form as the Commission may designate, and shall keep open in convenient form and place for public inspection schedules showing all rates and charges for any transmission or sale subject to the jurisdiction of the Commission, and the classifications, practices, and regulations affecting such rates and charges, together with all contracts which in any manner affect or relate to such rates, charges, classifications, and services.
- (d) Unless the Commission otherwise orders, no change shall be made by any public utility in any such rate, charge, classification, or service, or in any rule, regulation, or contract relating thereto, except after sixty days’ notice to the Commission and to the public. Such notice shall be given by filing with the Commission and keeping open for public inspection new schedules stating plainly the change or changes to be made in the schedule or schedules then in force and the time when the change or changes will go into effect. The Commission, for good cause shown, may allow changes to take effect without requiring the sixty days’ notice herein provided for by an order specifying the changes so to be made and the time when they shall take effect and the manner in which they shall be filed and published.
- (e) Whenever any such new schedule is filed the Commission shall have authority, either upon complaint or upon its own initiative without complaint, at once, and, if it so orders, without answer or formal pleading by the public utility, but upon reasonable notice, to enter upon a hearing concerning the lawfulness of such rate, charge, classification, or service; and, pending such hearing and the decision thereon, the Commission, upon filing with such schedules and delivering to the public utility affected thereby a statement in writing of its reasons for such suspension, may suspend the operation of such schedule and defer the use of such rate, charge, classification, or service, but not for a longer period than five months beyond the time when it would otherwise go into effect; and after full hearings, either completed before or after the rate, charge, classification, or service goes into effect, the Commission may make such orders with reference thereto as would be proper in a proceeding initiated after it had become effective. If the proceeding has not been concluded and an order made at the expiration of such five months, the proposed change of rate, charge, classification, or service shall go into effect at the end of such period, but in case of a proposed increased rate or charge, the Commission may by order require the interested public utility or public utilities to keep accurate account in detail of all amounts received by reason of such increase, specifying by whom and in whose behalf such amounts are paid, and upon completion of the hearing and decision may by further order require such public utility or public utilities to refund, with interest, to the persons in whose behalf such amounts were paid, such portion of such increased rates or charges as by its decision shall be found not justified. At any hearing involving a rate or charge sought to be increased, the burden of proof to show that the increased rate or charge is just and reasonable shall be upon the public utility, and the Commission shall give to the hearing and decision of such questions preference over other questions pending before it and decide the same as speedily as possible.
- (f)
- (1) Not later than 2 years after November 9, 1978 , and not less often than every 4 years thereafter, the Commission shall make a thorough review of automatic adjustment clauses in public utility rate schedules to examine—
- (A) whether or not each such clause effectively provides incentives for efficient use of resources (including economical purchase and use of fuel and electric energy), and
- (B) whether any such clause reflects any costs other than costs which are—
- (i) subject to periodic fluctuations and
- (ii) not susceptible to precise determinations in rate cases prior to the time such costs are incurred.
- (2) Not less frequently than every 2 years, in rate proceedings or in generic or other separate proceedings, the Commission shall review, with respect to each public utility, practices under any automatic adjustment clauses of such utility to insure efficient use of resources (including economical purchase and use of fuel and electric energy) under such clauses.
- (3) The Commission may, on its own motion or upon complaint, after an opportunity for an evidentiary hearing, order a public utility to—
- (A) modify the terms and provisions of any automatic adjustment clause, or
- (B) cease any practice in connection with the clause,
- (4) As used in this subsection, the term “automatic adjustment clause” means a provision of a rate schedule which provides for increases or decreases (or both), without prior hearing, in rates reflecting increases or decreases (or both) in costs incurred by an electric utility. Such term does not include any rate which takes effect subject to refund and subject to a later determination of the appropriate amount of such rate.
- (1) Not later than 2 years after November 9, 1978 , and not less often than every 4 years thereafter, the Commission shall make a thorough review of automatic adjustment clauses in public utility rate schedules to examine—
- (g)
- (1) With respect to a change described in subsection (d), if the Commission permits the 60-day period established therein to expire without issuing an order accepting or denying the change because the Commissioners are divided two against two as to the lawfulness of the change, as a result of vacancy, incapacity, or recusal on the Commission, or if the Commission lacks a quorum—
- (A) the failure to issue an order accepting or denying the change by the Commission shall be considered to be an order issued by the Commission accepting the change for purposes of section 825 l (a) of this title; and
- (B) each Commissioner shall add to the record of the Commission a written statement explaining the views of the Commissioner with respect to the change.
- (2) If, pursuant to this subsection, a person seeks a rehearing under section 825 l (a) of this title, and the Commission fails to act on the merits of the rehearing request by the date that is 30 days after the date of the rehearing request because the Commissioners are divided two against two, as a result of vacancy, incapacity, or recusal on the Commission, or if the Commission lacks a quorum, such person may appeal under section 825 l (b) of this title.
- (1) With respect to a change described in subsection (d), if the Commission permits the 60-day period established therein to expire without issuing an order accepting or denying the change because the Commissioners are divided two against two as to the lawfulness of the change, as a result of vacancy, incapacity, or recusal on the Commission, or if the Commission lacks a quorum—
§ 824e. Power of Commission to fix rates and charges; determination of cost of production or transmission
- (a) Whenever the Commission, after a hearing held upon its own motion or upon complaint, shall find that any rate, charge, or classification, demanded, observed, charged, or collected by any public utility for any transmission or sale subject to the jurisdiction of the Commission, or that any rule, regulation, practice, or contract affecting such rate, charge, or classification is unjust, unreasonable, unduly discriminatory or preferential, the Commission shall determine the just and reasonable rate, charge, classification, rule, regulation, practice, or contract to be thereafter observed and in force, and shall fix the same by order. Any complaint or motion of the Commission to initiate a proceeding under this section shall state the change or changes to be made in the rate, charge, classification, rule, regulation, practice, or contract then in force, and the reasons for any proposed change or changes therein. If, after review of any motion or complaint and answer, the Commission shall decide to hold a hearing, it shall fix by order the time and place of such hearing and shall specify the issues to be adjudicated.
- (b) Whenever the Commission institutes a proceeding under this section, the Commission shall establish a refund effective date. In the case of a proceeding instituted on complaint, the refund effective date shall not be earlier than the date of the filing of such complaint nor later than 5 months after the filing of such complaint. In the case of a proceeding instituted by the Commission on its own motion, the refund effective date shall not be earlier than the date of the publication by the Commission of notice of its intention to initiate such proceeding nor later than 5 months after the publication date. Upon institution of a proceeding under this section, the Commission shall give to the decision of such proceeding the same preference as provided under section 824d of this title and otherwise act as speedily as possible. If no final decision is rendered by the conclusion of the 180-day period commencing upon initiation of a proceeding pursuant to this section, the Commission shall state the reasons why it has failed to do so and shall state its best estimate as to when it reasonably expects to make such decision. In any proceeding under this section, the burden of proof to show that any rate, charge, classification, rule, regulation, practice, or contract is unjust, unreasonable, unduly discriminatory, or preferential shall be upon the Commission or the complainant. At the conclusion of any proceeding under this section, the Commission may order refunds of any amounts paid, for the period subsequent to the refund effective date through a date fifteen months after such refund effective date, in excess of those which would have been paid under the just and reasonable rate, charge, classification, rule, regulation, practice, or contract which the Commission orders to be thereafter observed and in force: Provided , That if the proceeding is not concluded within fifteen months after the refund effective date and if the Commission determines at the conclusion of the proceeding that the proceeding was not resolved within the fifteen-month period primarily because of dilatory behavior by the public utility, the Commission may order refunds of any or all amounts paid for the period subsequent to the refund effective date and prior to the conclusion of the proceeding. The refunds shall be made, with interest, to those persons who have paid those rates or charges which are the subject of the proceeding.
- (c) Notwithstanding subsection (b), in a proceeding commenced under this section involving two or more electric utility companies of a registered holding company, refunds which might otherwise be payable under subsection (b) shall not be ordered to the extent that such refunds would result from any portion of a Commission order that (1) requires a decrease in system production or transmission costs to be paid by one or more of such electric companies; and (2) is based upon a determination that the amount of such decrease should be paid through an increase in the costs to be paid by other electric utility companies of such registered holding company: Provided , That refunds, in whole or in part, may be ordered by the Commission if it determines that the registered holding company would not experience any reduction in revenues which results from an inability of an electric utility company of the holding company to recover such increase in costs for the period between the refund effective date and the effective date of the Commission’s order. For purposes of this subsection, the terms “electric utility companies” and “registered holding company” shall have the same meanings as provided in the Public Utility Holding Company Act of 1935, as amended. 1 1 See References in Text note below.
- (d) The Commission upon its own motion, or upon the request of any State commission whenever it can do so without prejudice to the efficient and proper conduct of its affairs, may investigate and determine the cost of the production or transmission of electric energy by means of facilities under the jurisdiction of the Commission in cases where the Commission has no authority to establish a rate governing the sale of such energy.
- (e)
- (1) In this subsection:
- (A) The term “short-term sale” means an agreement for the sale of electric energy at wholesale in interstate commerce that is for a period of 31 days or less (excluding monthly contracts subject to automatic renewal).
- (B) The term “applicable Commission rule” means a Commission rule applicable to sales at wholesale by public utilities that the Commission determines after notice and comment should also be applicable to entities subject to this subsection.
- (2) If an entity described in section 824(f) of this title voluntarily makes a short-term sale of electric energy through an organized market in which the rates for the sale are established by Commission-approved tariff (rather than by contract) and the sale violates the terms of the tariff or applicable Commission rules in effect at the time of the sale, the entity shall be subject to the refund authority of the Commission under this section with respect to the violation.
- (3) This section shall not apply to—
- (A) any entity that sells in total (including affiliates of the entity) less than 8,000,000 megawatt hours of electricity per year; or
- (B) an electric cooperative.
- (4)
- (A) The Commission shall have refund authority under paragraph (2) with respect to a voluntary short term sale of electric energy by the Bonneville Power Administration only if the sale is at an unjust and unreasonable rate.
- (B) The Commission may order a refund under subparagraph (A) only for short-term sales made by the Bonneville Power Administration at rates that are higher than the highest just and reasonable rate charged by any other entity for a short-term sale of electric energy in the same geographic market for the same, or most nearly comparable, period as the sale by the Bonneville Power Administration.
- (C) In the case of any Federal power marketing agency or the Tennessee Valley Authority, the Commission shall not assert or exercise any regulatory authority or power under paragraph (2) other than the ordering of refunds to achieve a just and reasonable rate.
- (1) In this subsection:
§ 824f. Ordering furnishing of adequate service
Whenever the Commission, upon complaint of a State commission, after notice to each State commission and public utility affected and after opportunity for hearing, shall find that any interstate service of any public utility is inadequate or insufficient, the Commission shall determine the proper, adequate, or sufficient service to be furnished, and shall fix the same by its order, rule, or regulation: Provided , That the Commission shall have no authority to compel the enlargement of generating facilities for such purposes, nor to compel the public utility to sell or exchange energy when to do so would impair its ability to render adequate service to its customers.
§ 824g. Ascertainment of cost of property and depreciation
- (a) The Commission may investigate and ascertain the actual legitimate cost of the property of every public utility, the depreciation therein, and, when found necessary for rate-making purposes, other facts which bear on the determination of such cost or depreciation, and the fair value of such property.
- (b) Every public utility upon request shall file with the Commission an inventory of all or any part of its property and a statement of the original cost thereof, and shall keep the Commission informed regarding the cost of all additions, betterments, extensions, and new construction.
§ 824h. References to State boards by Commission
- (a) The Commission may refer any matter arising in the administration of this subchapter to a board to be composed of a member or members, as determined by the Commission, from the State or each of the States affected or to be affected by such matter. Any such board shall be vested with the same power and be subject to the same duties and liabilities as in the case of a member of the Commission when designated by the Commission to hold any hearings. The action of such board shall have such force and effect and its proceedings shall be conducted in such manner as the Commission shall by regulations prescribe. The board shall be appointed by the Commission from persons nominated by the State commission of each State affected or by the Governor of such State if there is no State commission. Each State affected shall be entitled to the same number of representatives on the board unless the nominating power of such State waives such right. The Commission shall have discretion to reject the nominee from any State, but shall thereupon invite a new nomination from that State. The members of a board shall receive such allowances for expenses as the Commission shall provide. The Commission may, when in its discretion sufficient reason exists therefor, revoke any reference to such a board.
- (b) The Commission may confer with any State commission regarding the relationship between rate structures, costs, accounts, charges, practices, classifications, and regulations of public utilities subject to the jurisdiction of such State commission and of the Commission; and the Commission is authorized, under such rules and regulations as it shall prescribe, to hold joint hearings with any State commission in connection with any matter with respect to which the Commission is authorized to act. The Commission is authorized in the administration of this chapter to avail itself of such cooperation, services, records, and facilities as may be afforded by any State commission.
- (c) The Commission shall make available to the several State commissions such information and reports as may be of assistance in State regulation of public utilities. Whenever the Commission can do so without prejudice to the efficient and proper conduct of its affairs, it may upon request from a State make available to such State as witnesses any of its trained rate, valuation, or other experts, subject to reimbursement to the Commission by such State of the compensation and traveling expenses of such witnesses. All sums collected hereunder shall be credited to the appropriation from which the amounts were expended in carrying out the provisions of this subsection.
§ 824i. Interconnection authority
- (a)
- (1) Upon application of any electric utility, Federal power marketing agency, geothermal power producer (including a producer which is not an electric utility), qualifying cogenerator, or qualifying small power producer, the Commission may issue an order requiring—
- (A) the physical connection of any cogeneration facility, any small power production facility, or the transmission facilities of any electric utility, with the facilities of such applicant,
- (B) such action as may be necessary to make effective any physical connection described in subparagraph (A), which physical connection is ineffective for any reason, such as inadequate size, poor maintenance, or physical unreliability,
- (C) such sale or exchange of electric energy or other coordination, as may be necessary to carry out the purposes of any order under subparagraph (A) or (B), or
- (D) such increase in transmission capacity as may be necessary to carry out the purposes of any order under subparagraph (A) or (B).
- (2) Any State regulatory authority may apply to the Commission for an order for any action referred to in subparagraph (A), (B), (C), or (D) of paragraph (1). No such order may be issued by the Commission with respect to a Federal power marketing agency upon application of a State regulatory authority.
- (1) Upon application of any electric utility, Federal power marketing agency, geothermal power producer (including a producer which is not an electric utility), qualifying cogenerator, or qualifying small power producer, the Commission may issue an order requiring—
- (b) Upon receipt of an application under subsection (a), the Commission shall—
- (1) issue notice to each affected State regulatory authority, each affected electric utility, each affected Federal power marketing agency, each affected owner or operator of a cogeneration facility or of a small power production facility, and to the public. 1 1 So in original. The period probably should be a comma.
- (2) afford an opportunity for an evidentiary hearing, and
- (3) make a determination with respect to the matters referred to in subsection (c).
- (c) No order may be issued by the Commission under subsection (a) unless the Commission determines that such order—
- (1) is in the public interest,
- (2) would—
- (A) encourage overall conservation of energy or capital,
- (B) optimize the efficiency of use of facilities and resources, or
- (C) improve the reliability of any electric utility system or Federal power marketing agency to which the order applies, and
- (3) meets the requirements of section 824k of this title .
- (d) The Commission may, on its own motion, after compliance with the requirements of paragraphs (1) and (2) of subsection (b), issue an order requiring any action described in subsection (a)(1) if the Commission determines that such order meets the requirements of subsection (c). No such order may be issued upon the Commission’s own motion with respect to a Federal power marketing agency.
- (e)
- (1) As used in this section, the term “facilities” means only facilities used for the generation or transmission of electric energy.
- (2) With respect to an order issued pursuant to an application of a qualifying cogenerator or qualifying small power producer under subsection (a)(1), the term “facilities of such applicant” means the qualifying cogeneration facilities or qualifying small power production facilities of the applicant, as specified in the application. With respect to an order issued pursuant to an application under subsection (a)(2), the term “facilities of such applicant” means the qualifying cogeneration facilities, qualifying small power production facilities, or the transmission facilities of an electric utility, as specified in the application. With respect to an order issued by the Commission on its own motion under subsection (d), such term means the qualifying cogeneration facilities, qualifying small power production facilities, or the transmission facilities of an electric utility, as specified in the proposed order.
§ 824j. Wheeling authority
- (a) Any electric utility, Federal power marketing agency, or any other person generating electric energy for sale for resale, may apply to the Commission for an order under this subsection requiring a transmitting utility to provide transmission services (including any enlargement of transmission capacity necessary to provide such services) to the applicant. Upon receipt of such application, after public notice and notice to each affected State regulatory authority, each affected electric utility, and each affected Federal power marketing agency, and after affording an opportunity for an evidentiary hearing, the Commission may issue such order if it finds that such order meets the requirements of section 824k of this title , and would otherwise be in the public interest. No order may be issued under this subsection unless the applicant has made a request for transmission services to the transmitting utility that would be the subject of such order at least 60 days prior to its filing of an application for such order.
- (b) No order may be issued under this section or section 824i of this title if, after giving consideration to consistently applied regional or national reliability standards, guidelines, or criteria, the Commission finds that such order would unreasonably impair the continued reliability of electric systems affected by the order.
- (c) No order may be issued under subsection (a) or (b) which requires the transmitting utility subject to the order to transmit, during any period, an amount of electric energy which replaces any amount of electric energy—
- (1) required to be provided to such applicant pursuant to a contract during such period, or
- (2) currently provided to the applicant by the utility subject to the order pursuant to a rate schedule on file during such period with the Commission: Provided , That nothing in this subparagraph shall prevent an application for an order hereunder to be filed prior to termination or modification of an existing rate schedule: Provided , That such order shall not become effective until termination of such rate schedule or the modification becomes effective.
- (d)
- (1) Any transmitting utility ordered under subsection (a) or (b) to provide transmission services may apply to the Commission for an order permitting such transmitting utility to cease providing all, or any portion of, such services. After public notice, notice to each affected State regulatory authority, each affected Federal power marketing agency, each affected transmitting utility, and each affected electric utility, and after an opportunity for an evidentiary hearing, the Commission shall issue an order terminating or modifying the order issued under subsection (a) or (b), if the transmitting utility providing such transmission services has demonstrated, and the Commission has found, that—
- (A) due to changed circumstances, the requirements applicable, under this section and section 824k of this title , to the issuance of an order under subsection (a) or (b) are no longer met, or 1 1 So in original. The word “or” probably should not appear.
- (B) any transmission capacity of the utility providing transmission services under such order which was, at the time such order was issued, in excess of the capacity necessary to serve its own customers is no longer in excess of the capacity necessary for such purposes, or
- (C) the ordered transmission services require enlargement of transmission capacity and the transmitting utility subject to the order has failed, after making a good faith effort, to obtain the necessary approvals or property rights under applicable Federal, State, and local laws.
- (2) Any order issued under this subsection terminating or modifying an order issued under subsection (a) or (b) shall—
- (A) provide for any appropriate compensation, and
- (B) provide the affected electric utilities adequate opportunity and time to—
- (i) make suitable alternative arrangements for any transmission services terminated or modified, and
- (ii) insure that the interests of ratepayers of such utilities are adequately protected.
- (3) No order may be issued under this subsection terminating or modifying any order issued under subsection (a) or (b) if the order under subsection (a) or (b) includes terms and conditions agreed upon by the parties which—
- (A) fix a period during which transmission services are to be provided under the order under subsection (a) or (b), or
- (B) otherwise provide procedures or methods for terminating or modifying such order (including, if appropriate, the return of the transmission capacity when necessary to take into account an increase, after the issuance of such order, in the needs of the transmitting utility subject to such order for transmission capacity).
- (1) Any transmitting utility ordered under subsection (a) or (b) to provide transmission services may apply to the Commission for an order permitting such transmitting utility to cease providing all, or any portion of, such services. After public notice, notice to each affected State regulatory authority, each affected Federal power marketing agency, each affected transmitting utility, and each affected electric utility, and after an opportunity for an evidentiary hearing, the Commission shall issue an order terminating or modifying the order issued under subsection (a) or (b), if the transmitting utility providing such transmission services has demonstrated, and the Commission has found, that—
- (e) As used in this section, the term “facilities” means only facilities used for the generation or transmission of electric energy.
§ 824k. Orders requiring interconnection or wheeling
- (a) An order under section 824j of this title shall require the transmitting utility subject to the order to provide wholesale transmission services at rates, charges, terms, and conditions which permit the recovery by such utility of all the costs incurred in connection with the transmission services and necessary associated services, including, but not limited to, an appropriate share, if any, of legitimate, verifiable and economic costs, including taking into account any benefits to the transmission system of providing the transmission service, and the costs of any enlargement of transmission facilities. Such rates, charges, terms, and conditions shall promote the economically efficient transmission and generation of electricity and shall be just and reasonable, and not unduly discriminatory or preferential. Rates, charges, terms, and conditions for transmission services provided pursuant to an order under section 824j of this title shall ensure that, to the extent practicable, costs incurred in providing the wholesale transmission services, and properly allocable to the provision of such services, are recovered from the applicant for such order and not from a transmitting utility’s existing wholesale, retail, and transmission customers.
- (b)
- (c)
- (1) Before issuing an order under section 824i of this title or subsection (a) or (b) of section 824j of this title , the Commission shall issue a proposed order and set a reasonable time for parties to the proposed interconnection or transmission order to agree to terms and conditions under which such order is to be carried out, including the apportionment of costs between them and the compensation or reimbursement reasonably due to any of them. Such proposed order shall not be reviewable or enforceable in any court. The time set for such parties to agree to such terms and conditions may be shortened if the Commission determines that delay would jeopardize the attainment of the purposes of any proposed order. Any terms and conditions agreed to by the parties shall be subject to the approval of the Commission.
- (2)
- (A) If the parties agree as provided in paragraph (1) within the time set by the Commission and the Commission approves such agreement, the terms and conditions shall be included in the final order. In the case of an order under section 824i of this title , if the parties fail to agree within the time set by the Commission or if the Commission does not approve any such agreement, the Commission shall prescribe such terms and conditions and include such terms and conditions in the final order.
- (B) In the case of any order applied for under section 824j of this title , if the parties fail to agree within the time set by the Commission, the Commission shall prescribe such terms and conditions in the final order.
- (d) If the Commission does not issue any order applied for under section 824i or 824j of this title, the Commission shall, by order, deny such application and state the reasons for such denial.
- (e)
- (1) No provision of section 824i, 824j, 824m of this title, or this section shall be treated as requiring any person to utilize the authority of any such section in lieu of any other authority of law. Except as provided in section 824i, 824j, 824m of this title, or this section, such sections shall not be construed as limiting or impairing any authority of the Commission under any other provision of law.
- (2) Sections 824i, 824j, 824 l , 824m of this title, and this section, shall not be construed to modify, impair, or supersede the antitrust laws. For purposes of this section, the term “antitrust laws” has the meaning given in subsection (a) of the first sentence of section 12 of title 15 , except that such term includes section 45 of title 15 to the extent that such section relates to unfair methods of competition.
- (f)
- (1) No order under section 824i or 824j of this title requiring the Tennessee Valley Authority (hereinafter in this subsection referred to as the “TVA”) to take any action shall take effect for 60 days following the date of issuance of the order. Within 60 days following the issuance by the Commission of any order under section 824i or of section 824j of this title requiring the TVA to enter into any contract for the sale or delivery of power, the Commission may on its own motion initiate, or upon petition of any aggrieved person shall initiate, an evidentiary hearing to determine whether or not such sale or delivery would result in violation of the third sentence of section 15d(a) of the Tennessee Valley Authority Act of 1933 ( 16 U.S.C. 831n–4 ), hereinafter in this subsection referred to as the TVA Act [ 16 U.S.C. 831 et seq.].
- (2) Upon initiation of any evidentiary hearing under paragraph (1), the Commission shall give notice thereof to any applicant who applied for and obtained the order from the Commission, to any electric utility or other entity subject to such order, and to the public, and shall promptly make the determination referred to in paragraph (1). Upon initiation of such hearing, the Commission shall stay the effectiveness of the order under section 824i or 824j of this title until whichever of the following dates is applicable—
- (A) the date on which there is a final determination (including any judicial review thereof under paragraph (3)) that no such violation would result from such order, or
- (B) the date on which a specific authorization of the Congress (within the meaning of the third sentence of section 15d(a) of the TVA Act [ 16 U.S.C. 831n–4(a) ]) takes effect.
- (3) Any determination under paragraph (1) shall be reviewable only in the appropriate court of the United States upon petition filed by any aggrieved person or municipality within 60 days after such determination, and such court shall have jurisdiction to grant appropriate relief. Any applicant who applied for and obtained the order under section 824i or 824j of this title, and any electric utility or other entity subject to such order shall have the right to intervene in any such proceeding in such court. Except for review by such court (and any appeal or other review by an appellate court of the United States), no court shall have jurisdiction to consider any action brought by any person to enjoin the carrying out of any order of the Commission under section 824i or section 824j of this title requiring the TVA to take any action on the grounds that such action requires a specific authorization of the Congress pursuant to the third sentence of section 15d(a) of the TVA Act [ 16 U.S.C. 831n–4(a) ].
- (g) No order may be issued under this chapter which is inconsistent with any State law which governs the retail marketing areas of electric utilities.
- (h) No order issued under this chapter shall be conditioned upon or require the transmission of electric energy:
- (1) directly to an ultimate consumer, or
- (2) to, or for the benefit of, an entity if such electric energy would be sold by such entity directly to an ultimate consumer, unless:
- (A) such entity is a Federal power marketing agency; the Tennessee Valley Authority; a State or any political subdivision of a State (or an agency, authority, or instrumentality of a State or a political subdivision); a corporation or association that has ever received a loan for the purposes of providing electric service from the Administrator of the Rural Electrification Administration under the Rural Electrification Act of 1936 [ 7 U.S.C. 901 et seq.]; a person having an obligation arising under State or local law (exclusive of an obligation arising solely from a contract entered into by such person) to provide electric service to the public; or any corporation or association which is wholly owned, directly or indirectly, by any one or more of the foregoing; and
- (B) such entity was providing electric service to such ultimate consumer on October 24, 1992 , or would utilize transmission or distribution facilities that it owns or controls to deliver all such electric energy to such electric consumer.
- (i)
- (1) The Commission shall have authority pursuant to section 824i of this title , section 824j of this title , this section, and section 824 l of this title to (A) order the Administrator of the Bonneville Power Administration to provide transmission service and (B) establish the terms and conditions of such service. In applying such sections to the Federal Columbia River Transmission System, the Commission shall assure that—
- (i) the provisions of otherwise applicable Federal laws shall continue in full force and effect and shall continue to be applicable to the system; and
- (ii) the rates for the transmission of electric power on the system shall be governed only by such otherwise applicable provisions of law and not by any provision of section 824i of this title , section 824j of this title , this section, or section 824 l of this title, except that no rate for the transmission of power on the system shall be unjust, unreasonable, or unduly discriminatory or preferential, as determined by the Commission.
- (2) Notwithstanding any other provision of this chapter with respect to the procedures for the determination of terms and conditions for transmission service—
- (A) when the Administrator of the Bonneville Power Administration either (i) in response to a written request for specific transmission service terms and conditions does not offer the requested terms and conditions, or (ii) proposes to establish terms and conditions of general applicability for transmission service on the Federal Columbia River Transmission System, then the Administrator may provide opportunity for a hearing and, in so doing, shall—
- (I) give notice in the Federal Register and state in such notice the written explanation of the reasons why the specific terms and conditions for transmission services are not being offered or are being proposed;
- (II) adhere to the procedural requirements of paragraphs (1) through (3) of section 839e(i) of this title , except that the hearing officer shall, unless the hearing officer becomes unavailable to the agency, make a recommended decision to the Administrator that states the hearing officer’s findings and conclusions, and the reasons or basis thereof, on all material issues of fact, law, or discretion presented on the record; and
- (III) make a determination, setting forth the reasons for reaching any findings and conclusions which may differ from those of the hearing officer, based on the hearing record, consideration of the hearing officer’s recommended decision, section 824j of this title and this section, as amended by the Energy Policy Act of 1992, and the provisions of law as preserved in this section; and
- (B) if application is made to the Commission under section 824j of this title for transmission service under terms and conditions different than those offered by the Administrator, or following the denial of a request for transmission service by the Administrator, and such application is filed within 60 days of the Administrator’s final determination and in accordance with Commission procedures, the Commission shall—
- (i) in the event the Administrator has conducted a hearing as herein provided for (I) accord parties to the Administrator’s hearing the opportunity to offer for the Commission record materials excluded by the Administrator from the hearing record, (II) accord such parties the opportunity to submit for the Commission record comments on appropriate terms and conditions, (III) afford those parties the opportunity for a hearing if and to the extent that the Commission finds the Administrator’s hearing record to be inadequate to support a decision by the Commission, and (IV) establish terms and conditions for or deny transmission service based on the Administrator’s hearing record, the Commission record, section 824j of this title and this section, as amended by the Energy Policy Act of 1992, and the provisions of law as preserved in this section, or
- (ii) in the event the Administrator has not conducted a hearing as herein provided for, determine whether to issue an order for transmission service in accordance with section 824j of this title and this section, including providing the opportunity for a hearing.
- (A) when the Administrator of the Bonneville Power Administration either (i) in response to a written request for specific transmission service terms and conditions does not offer the requested terms and conditions, or (ii) proposes to establish terms and conditions of general applicability for transmission service on the Federal Columbia River Transmission System, then the Administrator may provide opportunity for a hearing and, in so doing, shall—
- (3) Notwithstanding those provisions of section 825 l (b) of this title which designate the court in which review may be obtained, any party to a proceeding concerning transmission service sought to be furnished by the Administrator of the Bonneville Power Administration seeking review of an order issued by the Commission in such proceeding shall obtain a review of such order in the United States Court of Appeals for the Pacific Northwest, as that region is defined by section 839a(14) of this title .
- (4) To the extent the Administrator of the Bonneville Power Administration cannot be required under section 824j of this title , as a result of the Administrator’s other statutory mandates, either to (A) provide transmission service to an applicant which the Commission would otherwise order, or (B) provide such service under rates, terms, and conditions which the Commission would otherwise require, the applicant shall not be required to provide similar transmission services to the Administrator or to provide such services under similar rates, terms, and conditions.
- (5) The Commission shall not issue any order under section 824i of this title , section 824j of this title , this section, or section 824 l of this title requiring the Administrator of the Bonneville Power Administration to provide transmission service if such an order would impair the Administrator’s ability to provide such transmission service to the Administrator’s power and transmission customers in the Pacific Northwest, as that region is defined in section 839a(14) of this title , as is needed to assure adequate and reliable service to loads in that region.
- (1) The Commission shall have authority pursuant to section 824i of this title , section 824j of this title , this section, and section 824 l of this title to (A) order the Administrator of the Bonneville Power Administration to provide transmission service and (B) establish the terms and conditions of such service. In applying such sections to the Federal Columbia River Transmission System, the Commission shall assure that—
- (j) With respect to an electric utility which is prohibited by Federal law from being a source of power supply, either directly or through a distributor of its electric energy, outside an area set forth in such law, no order issued under section 824j of this title may require such electric utility (or a distributor of such electric utility) to provide transmission services to another entity if the electric energy to be transmitted will be consumed within the area set forth in such Federal law, unless the order is in furtherance of a sale of electric energy to that electric utility: Provided, however , That the foregoing provision shall not apply to any area served at retail by an electric transmission system which was such a distributor on October 24, 1992 , and which before October 1, 1991 , gave its notice of termination under its power supply contract with such electric utility.
- (k)
- (1) Any order under section 824j of this title requiring provision of transmission services in whole or in part within ERCOT shall provide that any ERCOT utility which is not a public utility and the transmission facilities of which are actually used for such transmission service is entitled to receive compensation based, insofar as practicable and consistent with subsection (a), on the transmission ratemaking methodology used by the Public Utility Commission of Texas.
- (2) For purposes of this subsection—
- (A) the term “ERCOT” means the Electric Reliability Council of Texas; and
- (B) the term “ERCOT utility” means a transmitting utility which is a member of ERCOT.
§ 824l. Information requirements
- (a) Whenever any electric utility, Federal power marketing agency, or any other person generating electric energy for sale for resale makes a good faith request to a transmitting utility to provide wholesale transmission services and requests specific rates and charges, and other terms and conditions, unless the transmitting utility agrees to provide such services at rates, charges, terms and conditions acceptable to such person, the transmitting utility shall, within 60 days of its receipt of the request, or other mutually agreed upon period, provide such person with a detailed written explanation, with specific reference to the facts and circumstances of the request, stating (1) the transmitting utility’s basis for the proposed rates, charges, terms, and conditions for such services, and (2) its analysis of any physical or other constraints affecting the provision of such services.
- (b) Not later than 1 year after October 24, 1992 , the Commission shall promulgate a rule requiring that information be submitted annually to the Commission by transmitting utilities which is adequate to inform potential transmission customers, State regulatory authorities, and the public of potentially available transmission capacity and known constraints.
§ 824m. Sales by exempt wholesale generators
No rate or charge received by an exempt wholesale generator for the sale of electric energy shall be lawful under section 824d of this title if, after notice and opportunity for hearing, the Commission finds that such rate or charge results from the receipt of any undue preference or advantage from an electric utility which is an associate company or an affiliate of the exempt wholesale generator. For purposes of this section, the terms “associate company” and “affiliate” shall have the same meaning as provided in section 16451 of title 42 . 1 1 See References in Text note below.
§ 824n. Repealed. Pub. L. 109–58, title XII, § 1232(e)(3) , Aug. 8, 2005 , 119 Stat. 957
§ 824n. Repealed. Pub. L. 109–58, title XII, § 1232(e)(3) , Aug. 8, 2005 , 119 Stat. 957
§ 824o. Electric reliability
- (a) For purposes of this section:
- (1) The term “bulk-power system” means—
- (A) facilities and control systems necessary for operating an interconnected electric energy transmission network (or any portion thereof); and
- (B) electric energy from generation facilities needed to maintain transmission system reliability.
- (2) The terms “Electric Reliability Organization” and “ERO” mean the organization certified by the Commission under subsection (c) the purpose of which is to establish and enforce reliability standards for the bulk-power system, subject to Commission review.
- (3) The term “reliability standard” means a requirement, approved by the Commission under this section, to provide for reliable operation of the bulk-power system. The term includes requirements for the operation of existing bulk-power system facilities, including cybersecurity protection, and the design of planned additions or modifications to such facilities to the extent necessary to provide for reliable operation of the bulk-power system, but the term does not include any requirement to enlarge such facilities or to construct new transmission capacity or generation capacity.
- (4) The term “reliable operation” means operating the elements of the bulk-power system within equipment and electric system thermal, voltage, and stability limits so that instability, uncontrolled separation, or cascading failures of such system will not occur as a result of a sudden disturbance, including a cybersecurity incident, or unanticipated failure of system elements.
- (5) The term “Interconnection” means a geographic area in which the operation of bulk-power system components is synchronized such that the failure of one or more of such components may adversely affect the ability of the operators of other components within the system to maintain reliable operation of the facilities within their control.
- (6) The term “transmission organization” means a Regional Transmission Organization, Independent System Operator, independent transmission provider, or other transmission organization finally approved by the Commission for the operation of transmission facilities.
- (7) The term “regional entity” means an entity having enforcement authority pursuant to subsection (e)(4).
- (8) The term “cybersecurity incident” means a malicious act or suspicious event that disrupts, or was an attempt to disrupt, the operation of those programmable electronic devices and communication networks including hardware, software and data that are essential to the reliable operation of the bulk power system.
- (1) The term “bulk-power system” means—
- (b)
- (1) The Commission shall have jurisdiction, within the United States, over the ERO certified by the Commission under subsection (c), any regional entities, and all users, owners and operators of the bulk-power system, including but not limited to the entities described in section 824(f) of this title , for purposes of approving reliability standards established under this section and enforcing compliance with this section. All users, owners and operators of the bulk-power system shall comply with reliability standards that take effect under this section.
- (2) The Commission shall issue a final rule to implement the requirements of this section not later than 180 days after August 8, 2005 .
- (c) Following the issuance of a Commission rule under subsection (b)(2), any person may submit an application to the Commission for certification as the Electric Reliability Organization. The Commission may certify one such ERO if the Commission determines that such ERO—
- (1) has the ability to develop and enforce, subject to subsection (e)(2), reliability standards that provide for an adequate level of reliability of the bulk-power system; and
- (2) has established rules that—
- (A) assure its independence of the users and owners and operators of the bulk-power system, while assuring fair stakeholder representation in the selection of its directors and balanced decisionmaking in any ERO committee or subordinate organizational structure;
- (B) allocate equitably reasonable dues, fees, and other charges among end users for all activities under this section;
- (C) provide fair and impartial procedures for enforcement of reliability standards through the imposition of penalties in accordance with subsection (e) (including limitations on activities, functions, or operations, or other appropriate sanctions);
- (D) provide for reasonable notice and opportunity for public comment, due process, openness, and balance of interests in developing reliability standards and otherwise exercising its duties; and
- (E) provide for taking, after certification, appropriate steps to gain recognition in Canada and Mexico.
- (d)
- (1) The Electric Reliability Organization shall file each reliability standard or modification to a reliability standard that it proposes to be made effective under this section with the Commission.
- (2) The Commission may approve, by rule or order, a proposed reliability standard or modification to a reliability standard if it determines that the standard is just, reasonable, not unduly discriminatory or preferential, and in the public interest. The Commission shall give due weight to the technical expertise of the Electric Reliability Organization with respect to the content of a proposed standard or modification to a reliability standard and to the technical expertise of a regional entity organized on an Interconnection-wide basis with respect to a reliability standard to be applicable within that Interconnection, but shall not defer with respect to the effect of a standard on competition. A proposed standard or modification shall take effect upon approval by the Commission.
- (3) The Electric Reliability Organization shall rebuttably presume that a proposal from a regional entity organized on an Interconnection-wide basis for a reliability standard or modification to a reliability standard to be applicable on an Interconnection-wide basis is just, reasonable, and not unduly discriminatory or preferential, and in the public interest.
- (4) The Commission shall remand to the Electric Reliability Organization for further consideration a proposed reliability standard or a modification to a reliability standard that the Commission disapproves in whole or in part.
- (5) The Commission, upon its own motion or upon complaint, may order the Electric Reliability Organization to submit to the Commission a proposed reliability standard or a modification to a reliability standard that addresses a specific matter if the Commission considers such a new or modified reliability standard appropriate to carry out this section.
- (6) The final rule adopted under subsection (b)(2) shall include fair processes for the identification and timely resolution of any conflict between a reliability standard and any function, rule, order, tariff, rate schedule, or agreement accepted, approved, or ordered by the Commission applicable to a transmission organization. Such transmission organization shall continue to comply with such function, rule, order, tariff, rate schedule or agreement accepted, approved, or ordered by the Commission until—
- (A) the Commission finds a conflict exists between a reliability standard and any such provision;
- (B) the Commission orders a change to such provision pursuant to section 824e of this title ; and
- (C) the ordered change becomes effective under this subchapter.
- (e)
- (1) The ERO may impose, subject to paragraph (2), a penalty on a user or owner or operator of the bulk-power system for a violation of a reliability standard approved by the Commission under subsection (d) if the ERO, after notice and an opportunity for a hearing—
- (A) finds that the user or owner or operator has violated a reliability standard approved by the Commission under subsection (d); and
- (B) files notice and the record of the proceeding with the Commission.
- (2) A penalty imposed under paragraph (1) may take effect not earlier than the 31st day after the ERO files with the Commission notice of the penalty and the record of proceedings. Such penalty shall be subject to review by the Commission, on its own motion or upon application by the user, owner or operator that is the subject of the penalty filed within 30 days after the date such notice is filed with the Commission. Application to the Commission for review, or the initiation of review by the Commission on its own motion, shall not operate as a stay of such penalty unless the Commission otherwise orders upon its own motion or upon application by the user, owner or operator that is the subject of such penalty. In any proceeding to review a penalty imposed under paragraph (1), the Commission, after notice and opportunity for hearing (which hearing may consist solely of the record before the ERO and opportunity for the presentation of supporting reasons to affirm, modify, or set aside the penalty), shall by order affirm, set aside, reinstate, or modify the penalty, and, if appropriate, remand to the ERO for further proceedings. The Commission shall implement expedited procedures for such hearings.
- (3) On its own motion or upon complaint, the Commission may order compliance with a reliability standard and may impose a penalty against a user or owner or operator of the bulk-power system if the Commission finds, after notice and opportunity for a hearing, that the user or owner or operator of the bulk-power system has engaged or is about to engage in any acts or practices that constitute or will constitute a violation of a reliability standard.
- (4) The Commission shall issue regulations authorizing the ERO to enter into an agreement to delegate authority to a regional entity for the purpose of proposing reliability standards to the ERO and enforcing reliability standards under paragraph (1) if—
- (A) the regional entity is governed by—
- (i) an independent board;
- (ii) a balanced stakeholder board; or
- (iii) a combination independent and balanced stakeholder board.
- (B) the regional entity otherwise satisfies the provisions of subsection (c)(1) and (2); and
- (C) the agreement promotes effective and efficient administration of bulk-power system reliability.
- (A) the regional entity is governed by—
- (5) The Commission may take such action as is necessary or appropriate against the ERO or a regional entity to ensure compliance with a reliability standard or any Commission order affecting the ERO or a regional entity.
- (6) Any penalty imposed under this section shall bear a reasonable relation to the seriousness of the violation and shall take into consideration the efforts of such user, owner, or operator to remedy the violation in a timely manner.
- (1) The ERO may impose, subject to paragraph (2), a penalty on a user or owner or operator of the bulk-power system for a violation of a reliability standard approved by the Commission under subsection (d) if the ERO, after notice and an opportunity for a hearing—
- (f) The Electric Reliability Organization shall file with the Commission for approval any proposed rule or proposed rule change, accompanied by an explanation of its basis and purpose. The Commission, upon its own motion or complaint, may propose a change to the rules of the ERO. A proposed rule or proposed rule change shall take effect upon a finding by the Commission, after notice and opportunity for comment, that the change is just, reasonable, not unduly discriminatory or preferential, is in the public interest, and satisfies the requirements of subsection (c).
- (g) The ERO shall conduct periodic assessments of the reliability and adequacy of the bulk-power system in North America.
- (h) The President is urged to negotiate international agreements with the governments of Canada and Mexico to provide for effective compliance with reliability standards and the effectiveness of the ERO in the United States and Canada or Mexico.
- (i)
- (1) The ERO shall have authority to develop and enforce compliance with reliability standards for only the bulk-power system.
- (2) This section does not authorize the ERO or the Commission to order the construction of additional generation or transmission capacity or to set and enforce compliance with standards for adequacy or safety of electric facilities or services.
- (3) Nothing in this section shall be construed to preempt any authority of any State to take action to ensure the safety, adequacy, and reliability of electric service within that State, as long as such action is not inconsistent with any reliability standard, except that the State of New York may establish rules that result in greater reliability within that State, as long as such action does not result in lesser reliability outside the State than that provided by the reliability standards.
- (4) Within 90 days of the application of the Electric Reliability Organization or other affected party, and after notice and opportunity for comment, the Commission shall issue a final order determining whether a State action is inconsistent with a reliability standard, taking into consideration any recommendation of the ERO.
- (5) The Commission, after consultation with the ERO and the State taking action, may stay the effectiveness of any State action, pending the Commission’s issuance of a final order.
- (j) The Commission shall establish a regional advisory body on the petition of at least two-thirds of the States within a region that have more than one-half of their electric load served within the region. A regional advisory body shall be composed of one member from each participating State in the region, appointed by the Governor of each State, and may include representatives of agencies, States, and provinces outside the United States. A regional advisory body may provide advice to the Electric Reliability Organization, a regional entity, or the Commission regarding the governance of an existing or proposed regional entity within the same region, whether a standard proposed to apply within the region is just, reasonable, not unduly discriminatory or preferential, and in the public interest, whether fees proposed to be assessed within the region are just, reasonable, not unduly discriminatory or preferential, and in the public interest and any other responsibilities requested by the Commission. The Commission may give deference to the advice of any such regional advisory body if that body is organized on an Interconnection-wide basis.
- (k) The provisions of this section do not apply to Alaska or Hawaii.
§ 824p. Siting of interstate electric transmission facilities
- (a)
- (1) Not later than 1 year after August 8, 2005 , and every 3 years thereafter, the Secretary of Energy (referred to in this section as the “Secretary”), in consultation with affected States, shall conduct a study of electric transmission congestion.
- (2) After considering alternatives and recommendations from interested parties (including an opportunity for comment from affected States), the Secretary shall issue a report, based on the study, which may designate any geographic area experiencing electric energy transmission capacity constraints or congestion that adversely affects consumers as a national interest electric transmission corridor.
- (3) The Secretary shall conduct the study and issue the report in consultation with any appropriate regional entity referred to in section 824 o of this title.
- (4) In determining whether to designate a national interest electric transmission corridor under paragraph (2), the Secretary may consider whether—
- (A) the economic vitality and development of the corridor, or the end markets served by the corridor, may be constrained by lack of adequate or reasonably priced electricity;
- (B)
- (i) economic growth in the corridor, or the end markets served by the corridor, may be jeopardized by reliance on limited sources of energy; and
- (ii) a diversification of supply is warranted;
- (C) the energy independence of the United States would be served by the designation;
- (D) the designation would be in the interest of national energy policy; and
- (E) the designation would enhance national defense and homeland security.
- (b) Except as provided in subsection (i), the Commission may, after notice and an opportunity for hearing, issue one or more permits for the construction or modification of electric transmission facilities in a national interest electric transmission corridor designated by the Secretary under subsection (a) if the Commission finds that—
- (1)
- (A) a State in which the transmission facilities are to be constructed or modified does not have authority to—
- (i) approve the siting of the facilities; or
- (ii) consider the interstate benefits expected to be achieved by the proposed construction or modification of transmission facilities in the State;
- (B) the applicant for a permit is a transmitting utility under this chapter but does not qualify to apply for a permit or siting approval for the proposed project in a State because the applicant does not serve end-use customers in the State; or
- (C) a State commission or other entity that has authority to approve the siting of the facilities has—
- (i) withheld approval for more than 1 year after the filing of an application seeking approval pursuant to applicable law or 1 year after the designation of the relevant national interest electric transmission corridor, whichever is later; or
- (ii) conditioned its approval in such a manner that the proposed construction or modification will not significantly reduce transmission congestion in interstate commerce or is not economically feasible;
- (A) a State in which the transmission facilities are to be constructed or modified does not have authority to—
- (2) the facilities to be authorized by the permit will be used for the transmission of electric energy in interstate commerce;
- (3) the proposed construction or modification is consistent with the public interest;
- (4) the proposed construction or modification will significantly reduce transmission congestion in interstate commerce and protects or benefits consumers;
- (5) the proposed construction or modification is consistent with sound national energy policy and will enhance energy independence; and
- (6) the proposed modification will maximize, to the extent reasonable and economical, the transmission capabilities of existing towers or structures.
- (1)
- (c)
- (1) Permit applications under subsection (b) shall be made in writing to the Commission.
- (2) The Commission shall issue rules specifying—
- (A) the form of the application;
- (B) the information to be contained in the application; and
- (C) the manner of service of notice of the permit application on interested persons.
- (d) In any proceeding before the Commission under subsection (b), the Commission shall afford each State in which a transmission facility covered by the permit is or will be located, each affected Federal agency and Indian tribe, private property owners, and other interested persons, a reasonable opportunity to present their views and recommendations with respect to the need for and impact of a facility covered by the permit.
- (e)
- (1) In the case of a permit under subsection (b) for electric transmission facilities to be located on property other than property owned by the United States or a State, if the permit holder cannot acquire by contract, or is unable to agree with the owner of the property to the compensation to be paid for, the necessary right-of-way to construct or modify the transmission facilities, the permit holder may acquire the right-of-way by the exercise of the right of eminent domain in the district court of the United States for the district in which the property concerned is located, or in the appropriate court of the State in which the property is located.
- (2) Any right-of-way acquired under paragraph (1) shall be used exclusively for the construction or modification of electric transmission facilities within a reasonable period of time after the acquisition.
- (3) The practice and procedure in any action or proceeding under this subsection in the district court of the United States shall conform as nearly as practicable to the practice and procedure in a similar action or proceeding in the courts of the State in which the property is located.
- (4) Nothing in this subsection shall be construed to authorize the use of eminent domain to acquire a right-of-way for any purpose other than the construction, modification, operation, or maintenance of electric transmission facilities and related facilities. The right-of-way cannot be used for any other purpose, and the right-of-way shall terminate upon the termination of the use for which the right-of-way was acquired.
- (f)
- (1) Any right-of-way acquired pursuant to subsection (e) shall be considered a taking of private property for which just compensation is due.
- (2) Just compensation shall be an amount equal to the fair market value (including applicable severance damages) of the property taken on the date of the exercise of eminent domain authority.
- (g) Nothing in this section precludes any person from constructing or modifying any transmission facility in accordance with State law.
- (h)
- (1) In this subsection:
- (A) The term “Federal authorization” means any authorization required under Federal law in order to site a transmission facility.
- (B) The term “Federal authorization” includes such permits, special use authorizations, certifications, opinions, or other approvals as may be required under Federal law in order to site a transmission facility.
- (2) The Department of Energy shall act as the lead agency for purposes of coordinating all applicable Federal authorizations and related environmental reviews of the facility.
- (3) To the maximum extent practicable under applicable Federal law, the Secretary shall coordinate the Federal authorization and review process under this subsection with any Indian tribes, multistate entities, and State agencies that are responsible for conducting any separate permitting and environmental reviews of the facility, to ensure timely and efficient review and permit decisions.
- (4)
- (A) As head of the lead agency, the Secretary, in consultation with agencies responsible for Federal authorizations and, as appropriate, with Indian tribes, multistate entities, and State agencies that are willing to coordinate their own separate permitting and environmental reviews with the Federal authorization and environmental reviews, shall establish prompt and binding intermediate milestones and ultimate deadlines for the review of, and Federal authorization decisions relating to, the proposed facility.
- (B) The Secretary shall ensure that, once an application has been submitted with such data as the Secretary considers necessary, all permit decisions and related environmental reviews under all applicable Federal laws shall be completed—
- (i) within 1 year; or
- (ii) if a requirement of another provision of Federal law does not permit compliance with clause (i), as soon thereafter as is practicable.
- (C) The Secretary shall provide an expeditious pre-application mechanism for prospective applicants to confer with the agencies involved to have each such agency determine and communicate to the prospective applicant not later than 60 days after the prospective applicant submits a request for such information concerning—
- (i) the likelihood of approval for a potential facility; and
- (ii) key issues of concern to the agencies and public.
- (5)
- (A) As lead agency head, the Secretary, in consultation with the affected agencies, shall prepare a single environmental review document, which shall be used as the basis for all decisions on the proposed project under Federal law.
- (B) The Secretary and the heads of other agencies shall streamline the review and permitting of transmission within corridors designated under section 503 of the Federal Land Policy and Management Act 1 1 So in original. Probably should be followed by “of 1976”. ( 43 U.S.C. 1763 ) by fully taking into account prior analyses and decisions relating to the corridors.
- (C) The document shall include consideration by the relevant agencies of any applicable criteria or other matters as required under applicable law.
- (6)
- (A) If any agency has denied a Federal authorization required for a transmission facility, or has failed to act by the deadline established by the Secretary pursuant to this section for deciding whether to issue the authorization, the applicant or any State in which the facility would be located may file an appeal with the President, who shall, in consultation with the affected agency, review the denial or failure to take action on the pending application.
- (B) Based on the overall record and in consultation with the affected agency, the President may—
- (i) issue the necessary authorization with any appropriate conditions; or
- (ii) deny the application.
- (C) The President shall issue a decision not later than 90 days after the date of the filing of the appeal.
- (D) In making a decision under this paragraph, the President shall comply with applicable requirements of Federal law, including any requirements of—
- (i) the National Forest Management Act of 1976 ( 16 U.S.C. 472a et seq.);
- (ii) the Endangered Species Act of 1973 ( 16 U.S.C. 1531 et seq.);
- (iii) the Federal Water Pollution Control Act ( 33 U.S.C. 1251 et seq.);
- (iv) the National Environmental Policy Act of 1969 ( 42 U.S.C. 4321 et seq.); and
- (v) the Federal Land Policy and Management Act of 1976 ( 43 U.S.C. 1701 et seq.).
- (7)
- (A) Not later than 18 months after August 8, 2005 , the Secretary shall issue any regulations necessary to implement this subsection.
- (B)
- (i) Not later than 1 year after August 8, 2005 , the Secretary and the heads of all Federal agencies with authority to issue Federal authorizations shall enter into a memorandum of understanding to ensure the timely and coordinated review and permitting of electricity transmission facilities.
- (ii) Interested Indian tribes, multistate entities, and State agencies may enter the memorandum of understanding.
- (C) The head of each Federal agency with authority to issue a Federal authorization shall designate a senior official responsible for, and dedicate sufficient other staff and resources to ensure, full implementation of the regulations and memorandum required under this paragraph.
- (8)
- (A) Each Federal land use authorization for an electricity transmission facility shall be issued—
- (i) for a duration, as determined by the Secretary, commensurate with the anticipated use of the facility; and
- (ii) with appropriate authority to manage the right-of-way for reliability and environmental protection.
- (B) On the expiration of the authorization (including an authorization issued before August 8, 2005 ), the authorization shall be reviewed for renewal taking fully into account reliance on such electricity infrastructure, recognizing the importance of the authorization for public health, safety, and economic welfare and as a legitimate use of Federal land.
- (A) Each Federal land use authorization for an electricity transmission facility shall be issued—
- (9) In exercising the responsibilities under this section, the Secretary shall consult regularly with—
- (A) the Federal Energy Regulatory Commission;
- (B) electric reliability organizations (including related regional entities) approved by the Commission; and
- (C) Transmission Organizations approved by the Commission.
- (1) In this subsection:
- (i)
- (1) The consent of Congress is given for three or more contiguous States to enter into an interstate compact, subject to approval by Congress, establishing regional transmission siting agencies to—
- (A) facilitate siting of future electric energy transmission facilities within those States; and
- (B) carry out the electric energy transmission siting responsibilities of those States.
- (2) The Secretary may provide technical assistance to regional transmission siting agencies established under this subsection.
- (3) The regional transmission siting agencies shall have the authority to review, certify, and permit siting of transmission facilities, including facilities in national interest electric transmission corridors (other than facilities on property owned by the United States).
- (4) The Commission shall have no authority to issue a permit for the construction or modification of an electric transmission facility within a State that is a party to a compact, unless the members of the compact are in disagreement and the Secretary makes, after notice and an opportunity for a hearing, the finding described in subsection (b)(1)(C).
- (1) The consent of Congress is given for three or more contiguous States to enter into an interstate compact, subject to approval by Congress, establishing regional transmission siting agencies to—
- (j)
- (1) Except as specifically provided, nothing in this section affects any requirement of an environmental law of the United States, including the National Environmental Policy Act of 1969 ( 42 U.S.C. 4321 et seq.).
- (2) Subsection (h)(6) shall not apply to any unit of the National Park System, the National Wildlife Refuge System, the National Wild and Scenic Rivers System, the National Trails System, the National Wilderness Preservation System, or a National Monument.
- (k) This section shall not apply within the area referred to in section 824k(k)(2)(A) of this title .
§ 824q. Native load service obligation
- (a) In this section:
- (1) The term “distribution utility” means an electric utility that has a service obligation to end-users or to a State utility or electric cooperative that, directly or indirectly, through one or more additional State utilities or electric cooperatives, provides electric service to end-users.
- (2) The term “load-serving entity” means a distribution utility or an electric utility that has a service obligation.
- (3) The term “service obligation” means a requirement applicable to, or the exercise of authority granted to, an electric utility under Federal, State, or local law or under long-term contracts to provide electric service to end-users or to a distribution utility.
- (4) The term “State utility” means a State or any political subdivision of a State, or any agency, authority, or instrumentality of any one or more of the foregoing, or a corporation that is wholly owned, directly or indirectly, by any one or more of the foregoing, competent to carry on the business of developing, transmitting, utilizing, or distributing power.
- (b)
- (1) Paragraph (2) applies to any load-serving entity that, as of August 8, 2005 —
- (A) owns generation facilities, markets the output of Federal generation facilities, or holds rights under one or more wholesale contracts to purchase electric energy, for the purpose of meeting a service obligation; and
- (B) by reason of ownership of transmission facilities, or one or more contracts or service agreements for firm transmission service, holds firm transmission rights for delivery of the output of the generation facilities or the purchased energy to meet the service obligation.
- (2) Any load-serving entity described in paragraph (1) is entitled to use the firm transmission rights, or, equivalent tradable or financial transmission rights, in order to deliver the output or purchased energy, or the output of other generating facilities or purchased energy to the extent deliverable using the rights, to the extent required to meet the service obligation of the load-serving entity.
- (3)
- (A) To the extent that all or a portion of the service obligation covered by the firm transmission rights or equivalent tradable or financial transmission rights is transferred to another load-serving entity, the successor load-serving entity shall be entitled to use the firm transmission rights or equivalent tradable or financial transmission rights associated with the transferred service obligation.
- (B) Subsequent transfers to another load-serving entity, or back to the original load-serving entity, shall be entitled to the same rights.
- (4) The Commission shall exercise the authority of the Commission under this chapter in a manner that facilitates the planning and expansion of transmission facilities to meet the reasonable needs of load-serving entities to satisfy the service obligations of the load-serving entities, and enables load-serving entities to secure firm transmission rights (or equivalent tradable or financial rights) on a long-term basis for long-term power supply arrangements made, or planned, to meet such needs.
- (1) Paragraph (2) applies to any load-serving entity that, as of August 8, 2005 —
- (c) Nothing in subsections (b)(1), (b)(2), and (b)(3) of this section shall affect any existing or future methodology employed by a Transmission Organization for allocating or auctioning transmission rights if such Transmission Organization was authorized by the Commission to allocate or auction financial transmission rights on its system as of January 1, 2005 , and the Commission determines that any future allocation or auction is just, reasonable and not unduly discriminatory or preferential, provided, however, that if such a Transmission Organization never allocated financial transmission rights on its system that pertained to a period before January 1, 2005 , with respect to any application by such Transmission Organization that would change its methodology the Commission shall exercise its authority in a manner consistent with the 1 1 So in original. Probably should be “this”. chapter and that takes into account the policies expressed in subsections (b)(1), (b)(2), and (b)(3) as applied to firm transmission rights held by a load-serving entity as of January 1, 2005 , to the extent the associated generation ownership or power purchase arrangements remain in effect.
- (d) The Commission may exercise authority under this chapter to make transmission rights not used to meet an obligation covered by subsection (b) available to other entities in a manner determined by the Commission to be just, reasonable, and not unduly discriminatory or preferential.
- (e) Nothing in this chapter relieves a load-serving entity from any obligation under State or local law to build transmission or distribution facilities adequate to meet the service obligations of the load-serving entity.
- (f) Nothing in this section shall provide a basis for abrogating any contract or service agreement for firm transmission service or rights in effect as of August 8, 2005 . If an ISO in the Western Interconnection had allocated financial transmission rights prior to August 8, 2005 , but had not done so with respect to one or more load-serving entities’ firm transmission rights held under contracts to which the preceding sentence applies (or held by reason of ownership or future ownership of transmission facilities), such load-serving entities may not be required, without their consent, to convert such firm transmission rights to tradable or financial rights, except where the load-serving entity has voluntarily joined the ISO as a participating transmission owner (or its successor) in accordance with the ISO tariff.
- (g) The Commission shall ensure that any entity described in section 824(f) of this title that owns transmission facilities used predominately to support its own water pumping facilities shall have, with respect to the facilities, protections for transmission service comparable to those provided to load-serving entities pursuant to this section.
- (h) This section shall not apply within the area referred to in section 824k(k)(2)(A) of this title .
- (i) This section does not authorize the Commission to take any action not otherwise within the jurisdiction of the Commission.
- (j)
- (1) Subject to paragraphs (2) and (3), for purposes of subsection (b)(1)(B), a load-serving entity that is located within the service area of the Tennessee Valley Authority and that has a firm wholesale power supply contract with the Tennessee Valley Authority shall be considered to hold firm transmission rights for the transmission of the power provided.
- (2) Nothing in this subsection affects the requirements of section 824k(j) of this title .
- (3) The Commission shall not issue an order on the basis of this subsection that is contrary to the purposes of section 824k(j) of this title .
- (k) An entity that to the extent required to meet its service obligations exercises rights described in subsection (b) shall not be considered by such action as engaging in undue discrimination or preference under this chapter.
§ 824r. Protection of transmission contracts in the Pacific Northwest
- (a) In this section, the term “electric utility or person” means an electric utility or person that—
- (1) as of August 8, 2005 , holds firm transmission rights pursuant to contract or by reason of ownership of transmission facilities; and
- (2) is located—
- (A) in the Pacific Northwest, as that region is defined in section 839a of this title ; or
- (B) in that portion of a State included in the geographic area proposed for a regional transmission organization in Commission Docket Number RT01–35 on the date on which that docket was opened.
- (b) Nothing in this chapter confers on the Commission the authority to require an electric utility or person to convert to tradable or financial rights—
- (1) firm transmission rights described in subsection (a); or
- (2) firm transmission rights obtained by exercising contract or tariff rights associated with the firm transmission rights described in subsection (a).
§ 824s. Transmission infrastructure investment
- (a) Not later than 1 year after August 8, 2005 , the Commission shall establish, by rule, incentive-based (including performance-based) rate treatments for the transmission of electric energy in interstate commerce by public utilities for the purpose of benefitting consumers by ensuring reliability and reducing the cost of delivered power by reducing transmission congestion.
- (b) The rule shall—
- (1) promote reliable and economically efficient transmission and generation of electricity by promoting capital investment in the enlargement, improvement, maintenance, and operation of all facilities for the transmission of electric energy in interstate commerce, regardless of the ownership of the facilities;
- (2) provide a return on equity that attracts new investment in transmission facilities (including related transmission technologies);
- (3) encourage deployment of transmission technologies and other measures to increase the capacity and efficiency of existing transmission facilities and improve the operation of the facilities; and
- (4) allow recovery of—
- (A) all prudently incurred costs necessary to comply with mandatory reliability standards issued pursuant to section 824 o of this title; and
- (B) all prudently incurred costs related to transmission infrastructure development pursuant to section 824p of this title .
- (c) In the rule issued under this section, the Commission shall, to the extent within its jurisdiction, provide for incentives to each transmitting utility or electric utility that joins a Transmission Organization. The Commission shall ensure that any costs recoverable pursuant to this subsection may be recovered by such utility through the transmission rates charged by such utility or through the transmission rates charged by the Transmission Organization that provides transmission service to such utility.
- (d) All rates approved under the rules adopted pursuant to this section, including any revisions to the rules, are subject to the requirements of sections 824d and 824e of this title that all rates, charges, terms, and conditions be just and reasonable and not unduly discriminatory or preferential.
§ 824t. Electricity market transparency rules
- (a)
- (1) The Commission is directed to facilitate price transparency in markets for the sale and transmission of electric energy in interstate commerce, having due regard for the public interest, the integrity of those markets, fair competition, and the protection of consumers.
- (2) The Commission may prescribe such rules as the Commission determines necessary and appropriate to carry out the purposes of this section. The rules shall provide for the dissemination, on a timely basis, of information about the availability and prices of wholesale electric energy and transmission service to the Commission, State commissions, buyers and sellers of wholesale electric energy, users of transmission services, and the public.
- (3) The Commission may—
- (A) obtain the information described in paragraph (2) from any market participant; and
- (B) rely on entities other than the Commission to receive and make public the information, subject to the disclosure rules in subsection (b).
- (4) In carrying out this section, the Commission shall consider the degree of price transparency provided by existing price publishers and providers of trade processing services, and shall rely on such publishers and services to the maximum extent possible. The Commission may establish an electronic information system if it determines that existing price publications are not adequately providing price discovery or market transparency. Nothing in this section, however, shall affect any electronic information filing requirements in effect under this chapter as of August 8, 2005 .
- (b)
- (1) Rules described in subsection (a)(2), if adopted, shall exempt from disclosure information the Commission determines would, if disclosed, be detrimental to the operation of an effective market or jeopardize system security.
- (2) In determining the information to be made available under this section and time to make the information available, the Commission shall seek to ensure that consumers and competitive markets are protected from the adverse effects of potential collusion or other anticompetitive behaviors that can be facilitated by untimely public disclosure of transaction-specific information.
- (c)
- (1) Within 180 days of August 8, 2005 , the Commission shall conclude a memorandum of understanding with the Commodity Futures Trading Commission relating to information sharing, which shall include, among other things, provisions ensuring that information requests to markets within the respective jurisdiction of each agency are properly coordinated to minimize duplicative information requests, and provisions regarding the treatment of proprietary trading information.
- (2) Nothing in this section may be construed to limit or affect the exclusive jurisdiction of the Commodity Futures Trading Commission under the Commodity Exchange Act ( 7 U.S.C. 1 et seq.).
- (d) The Commission shall not require entities who have a de minimis market presence to comply with the reporting requirements of this section.
- (e)
- (1) Except as provided in paragraph (2), no person shall be subject to any civil penalty under this section with respect to any violation occurring more than 3 years before the date on which the person is provided notice of the proposed penalty under section 825 o –1 of this title.
- (2) Paragraph (1) shall not apply in any case in which the Commission finds that a seller that has entered into a contract for the sale of electric energy at wholesale or transmission service subject to the jurisdiction of the Commission has engaged in fraudulent market manipulation activities materially affecting the contract in violation of section 824v of this title .
- (f) This section shall not apply to a transaction for the purchase or sale of wholesale electric energy or transmission services within the area described in section 824k(k)(2)(A) of this title .
§ 824u. Prohibition on filing false information
No entity (including an entity described in section 824(f) of this title ) shall willfully and knowingly report any information relating to the price of electricity sold at wholesale or the availability of transmission capacity, which information the person or any other entity knew to be false at the time of the reporting, to a Federal agency with intent to fraudulently affect the data being compiled by the Federal agency.
§ 824v. Prohibition of energy market manipulation
- (a) It shall be unlawful for any entity (including an entity described in section 824(f) of this title ), directly or indirectly, to use or employ, in connection with the purchase or sale of electric energy or the purchase or sale of transmission services subject to the jurisdiction of the Commission, any manipulative or deceptive device or contrivance (as those terms are used in section 78j(b) of title 15 ), in contravention of such rules and regulations as the Commission may prescribe as necessary or appropriate in the public interest or for the protection of electric ratepayers.
- (b) Nothing in this section shall be construed to create a private right of action.
§ 824w. Joint boards on economic dispatch
- (a) The Commission shall convene joint boards on a regional basis pursuant to section 824h of this title to study the issue of security constrained economic dispatch for the various market regions. The Commission shall designate the appropriate regions to be covered by each such joint board for purposes of this section.
- (b) The Commission shall request each State to nominate a representative for the appropriate regional joint board, and shall designate a member of the Commission to chair and participate as a member of each such board.
- (c) The sole authority of each joint board convened under this section shall be to consider issues relevant to what constitutes “security constrained economic dispatch” and how such a mode of operating an electric energy system affects or enhances the reliability and affordability of service to customers in the region concerned and to make recommendations to the Commission regarding such issues.
- (d) Within 1 year after August 8, 2005 , the Commission shall issue a report and submit such report to the Congress regarding the recommendations of the joint boards under this section and the Commission may consolidate the recommendations of more than one such regional joint board, including any consensus recommendations for statutory or regulatory reform.
§ 825. Accounts and records
- (a) Every licensee and public utility shall make, keep, and preserve for such periods, such accounts, records of cost-accounting procedures, correspondence, memoranda, papers, books, and other records as the Commission may by rules and regulations prescribe as necessary or appropriate for purposes of the administration of this chapter, including accounts, records, and memoranda of the generation, transmission, distribution, delivery, or sale of electric energy, the furnishing of services or facilities in connection therewith, and receipts and expenditures with respect to any of the foregoing: Provided, however , That nothing in this chapter shall relieve any public utility from keeping any accounts, memoranda, or records which such public utility may be required to keep by or under authority of the laws of any State. The Commission may prescribe a system of accounts to be kept by licensees and public utilities and may classify such licensees and public utilities and prescribe a system of accounts for each class. The Commission, after notice and opportunity for hearing, may determine by order the accounts in which particular outlays and receipts shall be entered, charged, or credited. The burden of proof to justify every accounting entry questioned by the Commission shall be on the person making, authorizing, or requiring such entry, and the Commission may suspend a charge or credit pending submission of satisfactory proof in support thereof.
- (b) The Commission shall at all times have access to and the right to inspect and examine all accounts, records, and memoranda of licensees and public utilities, and it shall be the duty of such licensees and public utilities to furnish to the Commission, within such reasonable time as the Commission may order, any information with respect thereto which the Commission may by order require, including copies of maps, contracts, reports of engineers, and other data, records, and papers, and to grant to all agents of the Commission free access to its property and its accounts, records, and memoranda when requested so to do. No member, officer, or employee of the Commission shall divulge any fact or information which may come to his knowledge during the course of examination of books or other accounts, as hereinbefore provided, except insofar as he may be directed by the Commission or by a court.
- (c) The books, accounts, memoranda, and records of any person who controls, directly or indirectly, a licensee or public utility subject to the jurisdiction of the Commission, and of any other company controlled by such person, insofar as they relate to transactions with or the business of such licensee or public utility, shall be subject to examination on the order of the Commission.
§ 825a. Rates of depreciation; notice to State authorities before fixing
- (a) The Commission may, after hearing, require licensees and public utilities to carry a proper and adequate depreciation account in accordance with such rules, regulations, and forms of account as the Commission may prescribe. The Commission may, from time to time, ascertain and determine, and by order fix, the proper and adequate rates of depreciation of the several classes of property of each licensee and public utility. Each licensee and public utility shall conform its depreciation accounts to the rates so ascertained, determined, and fixed. The licensees and public utilities subject to the jurisdiction of the Commission shall not charge to operating expenses any depreciation charges on classes of property other than those prescribed by the Commission, or charge with respect to any class of property a percentage of depreciation other than that prescribed therefor by the Commission. No such licensee or public utility shall in any case include in any form under its operating or other expenses any depreciation or other charge or expenditure included elsewhere as a depreciation charge or otherwise under its operating or other expenses. Nothing in this section shall limit the power of a State commission to determine in the exercise of its jurisdiction, with respect to any public utility, the percentage rate of depreciation to be allowed, as to any class of property of such public utility, or the composite depreciation rate, for the purpose of determining rates or charges.
- (b) The Commission, before prescribing any rules or requirements as to accounts, records, or memoranda, or as to depreciation rates, shall notify each State commission having jurisdiction with respect to any public utility involved, and shall give reasonable opportunity to each such commission to present its views, and shall receive and consider such views and recommendations.
§ 825b. Requirements applicable to agencies of United States
All agencies of the United States engaged in the generation and sale of electric energy for ultimate distribution to the public shall be subject, as to all facilities used for such generation and sale, and as to the electric energy sold by such agency, to the provisions of sections 825 and 825a of this title, so far as may be practicable, and shall comply with the provisions of such sections and with the rules and regulations of the Commission thereunder to the same extent as may be required in the case of a public utility.
§ 825c. Periodic and special reports; obstructing filing reports or keeping accounts, etc.
- (a) Every licensee and every public utility shall file with the Commission such annual and other periodic or special reports as the Commission may by rules and regulations or order prescribe as necessary or appropriate to assist the Commission in the proper administration of this chapter. The Commission may prescribe the manner and form in which such reports shall be made, and require from such persons specific answers to all questions upon which the Commission may need information. The Commission may require that such reports shall include, among other things, full information as to assets and liabilities, capitalization, net investment, and reduction thereof, gross receipts, interest due and paid, depreciation, and other reserves, cost of project and other facilities, cost of maintenance and operation of the project and other facilities, cost of renewals and replacement of the project works and other facilities, depreciation, generation, transmission, distribution, delivery, use, and sale of electric energy. The Commission may require any such person to make adequate provision for currently determining such costs and other facts. Such reports shall be made under oath unless the Commission otherwise specifies.
- (b) It shall be unlawful for any person willfully to hinder, delay, or obstruct the making, filing, or keeping of any information, document, report, memorandum, record, or account required to be made, filed, or kept under this chapter or any rule, regulation, or order thereunder.
§ 825d. Officials dealing in securities
- (a) It shall be unlawful for any officer or director of any public utility to receive for his own benefit, directly or indirectly, any money or thing of value in respect of the negotiation, hypothecation, or sale by such public utility of any security issued or to be issued by such public utility, or to share in any of the proceeds thereof, or to participate in the making or paying of any dividends of such public utility from any funds properly included in capital account.
- (b)
- (1) After 6 months from August 26, 1935 , it shall be unlawful for any person to hold the position of officer or director of more than one public utility or to hold the position of officer or director of a public utility and the position of officer or director of any bank, trust company, banking association, or firm that is authorized by law to underwrite or participate in the marketing of securities of a public utility, or officer or director of any company supplying electrical equipment to such public utility, unless the holding of such positions shall have been authorized by order of the Commission, upon due showing in form and manner prescribed by the Commission, that neither public nor private interests will be adversely affected thereby. The Commission shall not grant any such authorization in respect of such positions held on August 26, 1935 , unless application for such authorization is filed with the Commission within sixty days after that date.
- (2)
- (A) In the circumstances described in subparagraph (B), paragraph (1) shall not apply to a person that holds or proposes to hold the positions of—
- (i) officer or director of a public utility; and
- (ii) officer or director of a bank, trust company, banking association, or firm authorized by law to underwrite or participate in the marketing of securities of a public utility.
- (B) The circumstances described in this subparagraph are that—
- (i) a person described in subparagraph (A) does not participate in any deliberations or decisions of the public utility regarding the selection of a bank, trust company, banking association, or firm to underwrite or participate in the marketing of securities of the public utility, if the person serves as an officer or director of a bank, trust company, banking association, or firm that is under consideration in the deliberation process;
- (ii) the bank, trust company, banking association, or firm of which the person is an officer or director does not engage in the underwriting of, or participate in the marketing of, securities of the public utility of which the person holds the position of officer or director;
- (iii) the public utility for which the person serves or proposes to serve as an officer or director selects underwriters by competitive procedures; or
- (iv) the issuance of securities of the public utility for which the person serves or proposes to serve as an officer or director has been approved by all Federal and State regulatory agencies having jurisdiction over the issuance.
- (A) In the circumstances described in subparagraph (B), paragraph (1) shall not apply to a person that holds or proposes to hold the positions of—
- (c)
- (1) On or before April 30 of each year, any person, who, during the calendar year preceding the filing date under this subsection, was an officer or director of a public utility and who held, during such calendar year, the position of officer, director, partner, appointee, or representative of any other entity listed in paragraph (2) shall file with the Commission, in such form and manner as the Commission shall by rule prescribe, a written statement concerning such positions held by such person. Such statement shall be available to the public.
- (2) The entities listed for purposes of paragraph (1) are as follows—
- (A) any investment bank, bank holding company, foreign bank or subsidiary thereof doing business in the United States, insurance company, or any other organization primarily engaged in the business of providing financial services or credit, a mutual savings bank, or a savings and loan association;
- (B) any company, firm, or organization which is authorized by law to underwrite or participate in the marketing of securities of a public utility;
- (C) any company, firm, or organization which produces or supplies electrical equipment or coal, natural gas, oil, nuclear fuel, or other fuel, for the use of any public utility;
- (D) any company, firm, or organization which during any one of the 3 calendar years immediately preceding the filing date was one of the 20 purchasers of electric energy which purchased (for purposes other than for resale) one of the 20 largest annual amounts of electric energy sold by such public utility (or by any public utility which is part of the same holding company system) during any one of such three calendar years;
- (E) any entity referred to in subsection (b); and
- (F) any company, firm, or organization which is controlled by any company, firm, or organization referred to in this paragraph.
- (3) For purposes of this subsection—
- (A) The term “public utility” includes any company which is a part of a holding company system which includes a registered holding company, unless no company in such system is an electric utility.
- (B) The terms “holding company”, “registered holding company”, and “holding company system” have the same meaning as when used in the Public Utility Holding Company Act of 1935. 1 1 See References in Text note below.
§ 825e. Complaints
Any person, electric utility, State, municipality, or State commission complaining of anything done or omitted to be done by any licensee, transmitting utility, or public utility in contravention of the provisions of this chapter may apply to the Commission by petition which shall briefly state the facts, whereupon a statement of the complaint thus made shall be forwarded by the Commission to such licensee, transmitting utility, or public utility, who shall be called upon to satisfy the complaint or to answer the same in writing within a reasonable time to be specified by the Commission. If such licensee, transmitting utility, or public utility shall not satisfy the complaint within the time specified or there shall appear to be any reasonable ground for investigating such complaint, it shall be the duty of the Commission to investigate the matters complained of in such manner and by such means as it shall find proper.
§ 825f. Investigations by Commission
- (a) The Commission may investigate any facts, conditions, practices, or matters which it may find necessary or proper in order to determine whether any person, electric utility, transmitting utility, or other entity has violated or is about to violate any provision of this chapter or any rule, regulation, or order thereunder, or to aid in the enforcement of the provisions of this chapter or in prescribing rules or regulations thereunder, or in obtaining information to serve as a basis for recommending further legislation concerning the matters to which this chapter relates, or in obtaining information about the sale of electric energy at wholesale in interstate commerce and the transmission of electric energy in interstate commerce. The Commission may permit any person, electric utility, transmitting utility, or other entity to file with it a statement in writing under oath or otherwise, as it shall determine, as to any or all facts and circumstances concerning a matter which may be the subject of investigation. The Commission, in its discretion, may publish or make available to State commissions information concerning any such subject.
- (b) For the purpose of any investigation or any other proceeding under this chapter, any member of the Commission, or any officer designated by it, is empowered to administer oaths and affirmations, subpena witnesses, compel their attendance, take evidence, and require the production of any books, papers, correspondence, memoranda, contracts, agreements, or other records which the Commission finds relevant or material to the inquiry. Such attendance of witnesses and the production of any such records may be required from any place in the United States at any designated place of hearing. Witnesses summoned by the Commission to appear before it shall be paid the same fees and mileage that are paid witnesses in the courts of the United States.
- (c) In case of contumacy by, or refusal to obey a subpena issued to, any person, the Commission may invoke the aid of any court of the United States within the jurisdiction of which such investigation or proceeding is carried on, or where such person resides or carries on business, in requiring the attendance and testimony of witnesses and the production of books, papers, correspondence, memoranda, contracts, agreements, and other records. Such court may issue an order requiring such person to appear before the Commission or member or officer designated by the Commission, there to produce records, if so ordered, or to give testimony touching the matter under investigation or in question; and any failure to obey such order of the court may be punished by such court as a contempt thereof. All process in any such case may be served in the judicial district whereof such person is an inhabitant or wherever he may be found or may be doing business. Any person who willfully shall fail or refuse to attend and testify or to answer any lawful inquiry or to produce books, papers, correspondence, memoranda, contracts, agreements, or other records, if in his or its power so to do, in obedience to the subpena of the Commission, shall be guilty of a misdemeanor and, upon conviction, shall be subject to a fine of not more than $1,000 or to imprisonment for a term of not more than one year, or both.
- (d) The testimony of any witness may be taken, at the instance of a party, in any proceeding or investigation pending before the Commission, by deposition, at any time after the proceeding is at issue. The Commission may also order testimony to be taken by deposition in any proceeding or investigation pending before it, at any stage of such proceeding or investigation. Such depositions may be taken before any person authorized to administer oaths not being of counsel or attorney to either of the parties, nor interested in the proceeding or investigation. Reasonable notice must first be given in writing by the party or his attorney proposing to take such deposition to the opposite party or his attorney of record, as either may be nearest, which notice shall state the name of the witness and the time and place of the taking of his deposition. Any person may be compelled to appear and depose, and to produce documentary evidence, in the same manner as witnesses may be compelled to appear and testify and produce documentary evidence before the Commission, as hereinbefore provided. Such testimony shall be reduced to writing by the person taking the deposition, or under his direction, and shall, after it has been reduced to writing, be subscribed by the deponent.
- (e) If a witness whose testimony may be desired to be taken by deposition be in a foreign country, the deposition may be taken before an officer or person designated by the Commission, or agreed upon by the parties by stipulation in writing to be filed with the Commission. All depositions must be promptly filed with the Commission.
- (f) Witnesses whose depositions are taken as authorized in this chapter, and the person or officer taking the same, shall be entitled to the same fees as are paid for like services in the courts of the United States.
§ 825g. Hearings; rules of procedure
- (a) Hearings under this chapter may be held before the Commission, any member or members thereof or any representative of the Commission designated by it, and appropriate records thereof shall be kept. In any proceeding before it, the Commission, in accordance with such rules and regulations as it may prescribe, may admit as a party any interested State, State commission, municipality, or any representative of interested consumers or security holders, or any competitor of a party to such proceeding, or any other person whose participation in the proceeding may be in the public interest.
- (b) All hearings, investigations, and proceedings under this chapter shall be governed by rules of practice and procedure to be adopted by the Commission, and in the conduct thereof the technical rules of evidence need not be applied. No informality in any hearing, investigation, or proceeding or in the manner of taking testimony shall invalidate any order, decision, rule, or regulation issued under the authority of this chapter.
§ 825h. Administrative powers of Commission; rules, regulations, and orders
The Commission shall have power to perform any and all acts, and to prescribe, issue, make, amend, and rescind such orders, rules, and regulations as it may find necessary or appropriate to carry out the provisions of this chapter. Among other things, such rules and regulations may define accounting, technical, and trade terms used in this chapter; and may prescribe the form or forms of all statements, declarations, applications, and reports to be filed with the Commission, the information which they shall contain, and the time within which they shall be filed. Unless a different date is specified therein, rules and regulations of the Commission shall be effective thirty days after publication in the manner which the Commission shall prescribe. Orders of the Commission shall be effective on the date and in the manner which the Commission shall prescribe. For the purposes of its rules and regulations, the Commission may classify persons and matters within its jurisdiction and prescribe different requirements for different classes of persons or matters. All rules and regulations of the Commission shall be filed with its secretary and shall be kept open in convenient form for public inspection and examination during reasonable business hours.
§ 825i. Appointment of officers and employees; compensation
The Commission is authorized to appoint and fix the compensation of such officers, attorneys, examiners, and experts as may be necessary for carrying out its functions under this chapter; and the Commission may, subject to civil-service laws, appoint such other officers and employees as are necessary for carrying out such functions and fix their salaries in accordance with chapter 51 and subchapter III of chapter 53 of title 5.
§ 825j. Investigations relating to electric energy; reports to Congress
In order to secure information necessary or appropriate as a basis for recommending legislation, the Commission is authorized and directed to conduct investigations regarding the generation, transmission, distribution, and sale of electric energy, however produced, throughout the United States and its possessions, whether or not otherwise subject to the jurisdiction of the Commission, including the generation, transmission, distribution, and sale of electric energy by any agency, authority, or instrumentality of the United States, or of any State or municipality or other political subdivision of a State. It shall, so far as practicable, secure and keep current information regarding the ownership, operation, management, and control of all facilities for such generation, transmission, distribution, and sale; the capacity and output thereof and the relationship between the two; the cost of generation, transmission, and distribution; the rates, charges, and contracts in respect of the sale of electric energy and its service to residential, rural, commercial, and industrial consumers and other purchasers by private and public agencies; and the relation of any or all such facts to the development of navigation, industry, commerce, and the national defense. The Commission shall report to Congress the results of investigations made under authority of this section.
§ 825k. Publication and sale of reports
The Commission may provide for the publication of its reports and decisions in such form and manner as may be best adapted for public information and use, and is authorized to sell at reasonable prices copies of all maps, atlases, and reports as it may from time to time publish. Such reasonable prices may include the cost of compilation, composition, and reproduction. The Commission is also authorized to make such charges as it deems reasonable for special statistical services and other special or periodic services. The amounts collected under this section shall be deposited in the Treasury to the credit of miscellaneous receipts. All printing for the Federal Power Commission making use of engraving, lithography, and photolithography, together with the plates for the same, shall be contracted for and performed under the direction of the Commission, under such limitations and conditions as the Joint Committee on Printing may from time to time prescribe, and all other printing for the Commission shall be done by the Director of the Government Publishing Office under such limitations and conditions as the Joint Committee on Printing may from time to time prescribe. The entire work may be done at, or ordered through, the Government Publishing Office whenever, in the judgment of the Joint Committee on Printing, the same would be to the interest of the Government: Provided , That when the exigencies of the public service so require, the Joint Committee on Printing may authorize the Commission to make immediate contracts for engraving, lithographing, and photolithographing, without advertisement for proposals: Provided further , That nothing contained in this chapter or any other Act shall prevent the Federal Power Commission from placing orders with other departments or establishments for engraving, lithographing, and photolithographing, in accordance with the provisions of sections 1535 and 1536 of title 31, providing for interdepartmental work.
§ 825l. Review of orders
- (a) Any person, electric utility, State, municipality, or State commission aggrieved by an order issued by the Commission in a proceeding under this chapter to which such person, electric utility, State, municipality, or State commission is a party may apply for a rehearing within thirty days after the issuance of such order. The application for rehearing shall set forth specifically the ground or grounds upon which such application is based. Upon such application the Commission shall have power to grant or deny rehearing or to abrogate or modify its order without further hearing. Unless the Commission acts upon the application for rehearing within thirty days after it is filed, such application may be deemed to have been denied. No proceeding to review any order of the Commission shall be brought by any entity unless such entity shall have made application to the Commission for a rehearing thereon. Until the record in a proceeding shall have been filed in a court of appeals, as provided in subsection (b), the Commission may at any time, upon reasonable notice and in such manner as it shall deem proper, modify or set aside, in whole or in part, any finding or order made or issued by it under the provisions of this chapter.
- (b) Any party to a proceeding under this chapter aggrieved by an order issued by the Commission in such proceeding may obtain a review of such order in the United States court of appeals for any circuit wherein the licensee or public utility to which the order relates is located or has its principal place of business, or in the United States Court of Appeals for the District of Columbia, by filing in such court, within sixty days after the order of the Commission upon the application for rehearing, a written petition praying that the order of the Commission be modified or set aside in whole or in part. A copy of such petition shall forthwith be transmitted by the clerk of the court to any member of the Commission and thereupon the Commission shall file with the court the record upon which the order complained of was entered, as provided in section 2112 of title 28 . Upon the filing of such petition such court shall have jurisdiction, which upon the filing of the record with it shall be exclusive, to affirm, modify, or set aside such order in whole or in part. No objection to the order of the Commission shall be considered by the court unless such objection shall have been urged before the Commission in the application for rehearing unless there is reasonable ground for failure so to do. The finding of the Commission as to the facts, if supported by substantial evidence, shall be conclusive. If any party shall apply to the court for leave to adduce additional evidence, and shall show to the satisfaction of the court that such additional evidence is material and that there were reasonable grounds for failure to adduce such evidence in the proceedings before the Commission, the court may order such additional evidence to be taken before the Commission and to be adduced upon the hearing in such manner and upon such terms and conditions as to the court may seem proper. The Commission may modify its findings as to the facts by reason of the additional evidence so taken, and it shall file with the court such modified or new findings which, if supported by substantial evidence, shall be conclusive, and its recommendation, if any, for the modification or setting aside of the original order. The judgment and decree of the court, affirming, modifying, or setting aside, in whole or in part, any such order of the Commission, shall be final, subject to review by the Supreme Court of the United States upon certiorari or certification as provided in section 1254 of title 28 .
- (c) The filing of an application for rehearing under subsection (a) shall not, unless specifically ordered by the Commission, operate as a stay of the Commission’s order. The commencement of proceedings under subsection (b) of this section shall not, unless specifically ordered by the court, operate as a stay of the Commission’s order.
§ 825m. Enforcement provisions
- (a) Whenever it shall appear to the Commission that any person is engaged or about to engage in any acts or practices which constitute or will constitute a violation of the provisions of this chapter, or of any rule, regulation, or order thereunder, it may in its discretion bring an action in the proper District Court of the United States or the United States courts of any Territory or other place subject to the jurisdiction of the United States, to enjoin such acts or practices and to enforce compliance with this chapter or any rule, regulation, or order thereunder, and upon a proper showing a permanent or temporary injunction or decree or restraining order shall be granted without bond. The Commission may transmit such evidence as may be available concerning such acts or practices to the Attorney General, who, in his discretion, may institute the necessary criminal proceedings under this chapter.
- (b) Upon application of the Commission the district courts of the United States and the United States courts of any Territory or other place subject to the jurisdiction of the United States shall have jurisdiction to issue writs of mandamus commanding any person to comply with the provisions of this chapter or any rule, regulation, or order of the Commission thereunder.
- (c) The Commission may employ such attorneys as it finds necessary for proper legal aid and service of the Commission or its members in the conduct of their work, or for proper representation of the public interests in investigations made by it or cases or proceedings pending before it, whether at the Commission’s own instance or upon complaint, or to appear for or represent the Commission in any case in court; and the expenses of such employment shall be paid out of the appropriation for the Commission.
- (d) In any proceedings under subsection (a), the court may prohibit, conditionally or unconditionally, and permanently or for such period of time as the court determines, any individual who is engaged or has engaged in practices constituting a violation of section 824u of this title (and related rules and regulations) from—
- (1) acting as an officer or director of an electric utility; or
- (2) engaging in the business of purchasing or selling—
- (A) electric energy; or
- (B) transmission services subject to the jurisdiction of the Commission.
§ 825n. Forfeiture for violations; recovery; applicability
- (a) Any licensee or public utility which willfully fails, within the time prescribed by the Commission, to comply with any order of the Commission, to file any report required under this chapter or any rule or regulation of the Commission thereunder, to submit any information or document required by the Commission in the course of an investigation conducted under this chapter, or to appear by an officer or agent at any hearing or investigation in response to a subpena issued under this chapter, shall forfeit to the United States an amount not exceeding $1,000 to be fixed by the Commission after notice and opportunity for hearing. The imposition or payment of any such forfeiture shall not bar or affect any penalty prescribed in this chapter but such forfeiture shall be in addition to any such penalty.
- (b) The forfeitures provided for in this chapter shall be payable into the Treasury of the United States and shall be recoverable in a civil suit in the name of the United States, brought in the district where the person is an inhabitant or has his principal place of business, or if a licensee or public utility, in any district in which such licensee or public utility transacts business. It shall be the duty of the various United States attorneys, under the direction of the Attorney General of the United States, to prosecute for the recovery of forfeitures under this chapter. The costs and expenses of such prosecution shall be paid from the appropriations for the expenses of the courts of the United States.
- (c) This section shall not apply in the case of any provision of section 824j, 824k, 824 l , or 824m of this title or any rule or order issued under any such provision.
§ 825o. Penalties for violations; applicability of section
- (a) Any person who willfully and knowingly does or causes or suffers to be done any act, matter, or thing in this chapter prohibited or declared to be unlawful, or who willfully and knowingly omits or fails to do any act, matter, or thing in this chapter required to be done, or willfully and knowingly causes or suffers such omission or failure, shall, upon conviction thereof, be punished by a fine of not more than $1,000,000 or by imprisonment for not more than 5 years, or both.
- (b) Any person who willfully and knowingly violates any rule, regulation, restriction, condition, or order made or imposed by the Commission under authority of this chapter, or any rule or regulation imposed by the Secretary of the Army under authority of subchapter I of this chapter shall, in addition to any other penalties provided by law, be punished upon conviction thereof by a fine of not exceeding $25,000 for each and every day during which such offense occurs.
§ 825p. Jurisdiction of offenses; enforcement of liabilities and duties
The District Courts of the United States, and the United States courts of any Territory or other place subject to the jurisdiction of the United States shall have exclusive jurisdiction of violations of this chapter or the rules, regulations, and orders thereunder, and of all suits in equity and actions at law brought to enforce any liability or duty created by, or to enjoin any violation of this chapter or any rule, regulation, or order thereunder. Any criminal proceeding shall be brought in the district wherein any act or transaction constituting the violation occurred. Any suit or action to enforce any liability or duty created by, or to enjoin any violation of, this chapter or any rule, regulation, or order thereunder may be brought in any such district or in the district wherein the defendant is an inhabitant, and process in such cases may be served wherever the defendant may be found. Judgments and decrees so rendered shall be subject to review as provided in sections 1254, 1291, and 1292 of title 28. No costs shall be assessed against the Commission in any judicial proceeding by or against the Commission under this chapter.
§ 825q. Repealed. Pub. L. 109–58, title XII, § 1277(a) , Aug. 8, 2005 , 119 Stat. 978
§ 825q. Repealed. Pub. L. 109–58, title XII, § 1277(a) , Aug. 8, 2005 , 119 Stat. 978
§ 825r. Separability
If any provision of this chapter, or the application of such provision to any person or circumstance, shall be held invalid, the remainder of the chapter, and the application of such provision to persons or circumstances other than those as to which it is held invalid, shall not be affected thereby.
§ 825s. Sale of electric power from reservoir projects; rate schedules; preference in sale; construction of transmission lines; disposition of moneys
Electric power and energy generated at reservoir projects under the control of the Department of the Army and in the opinion of the Secretary of the Army not required in the operation of such projects shall be delivered to the Secretary of Energy who shall transmit and dispose of such power and energy in such manner as to encourage the most widespread use thereof at the lowest possible rates to consumers consistent with sound business principles, the rate schedules to become effective upon confirmation and approval by the Secretary of Energy. Rate schedules shall be drawn having regard to the recovery (upon the basis of the application of such rate schedules to the capacity of the electric facilities of the projects) of the cost of producing and transmitting such electric energy, including the amortization of the capital investment allocated to power over a reasonable period of years. Preference in the sale of such power and energy shall be given to public bodies and cooperatives. The Secretary of Energy is authorized, from funds to be appropriated by the Congress, to construct or acquire, by purchase or other agreement, only such transmission lines and related facilities as may be necessary in order to make the power and energy generated at said projects available in wholesale quantities for sale on fair and reasonable terms and conditions to facilities owned by the Federal Government, public bodies, cooperatives, and privately owned companies. All moneys received from such sales shall be deposited in the Treasury of the United States as miscellaneous receipts.
§ 825t. Utilization of power revenues
No power revenues on any project shall be distributed as profits, before or after retirement of the project debt, and nothing contained in any previous appropriation Act shall be deemed to have authorized such distribution: Provided , That the application of such revenues to the cost of operation, maintenance, and debt service of the irrigation system of the project, or to other purposes in aid of such irrigation system, shall not be construed to be such a distribution.
§ 825u. Interest rate on power bonds held by Administrator of General Services
The Administrator of General Services or his successor in interest is authorized to reduce the rate of interest to 2½ per centum on all power bonds held by such Agency issued by States, public authorities, counties, municipalities, and other subdivisions of State governments for power projects financed by the Public Works Administration.
§ 828. Facilitation of development and construction of water conservation facilities; exemption from certain Federal requirements
In order to facilitate the development and construction by States and municipalities of water conservation facilities, certain requirements in the Federal Power Act [ 16 U.S.C. 791a et seq.] are made inapplicable to States and municipalities as provided in this subchapter.
§ 828a. Definitions
The words used in this subchapter shall have the same meanings ascribed to them in the Federal Power Act [ 16 U.S.C. 791a et seq.].
§ 828b. Exemption from formula, books and records, and project cost statement requirements; annual charges
Section 807 of this title pertaining to the taking over by the United States of any project upon or after the expiration of a license, and sections 825 and 825a of this title requiring certain records and accounting procedures and section 797(b) of this title requiring the preparation and filing of the statement of actual legitimate original cost of a project, shall not be applicable to any project owned by a State or municipality, and such rights and requirements shall not exist under any license heretofore or hereafter granted to any State or municipality. The Secretary of Energy in determining the amount of annual charges applicable to any such project may determine the annual charges with reference to the actual cost of services incurred by the Secretary with respect to the project.
§ 828c. Applicability of this subchapter
Except as herein provided, the provisions of this subchapter shall not be construed as repealing or affecting any of the provisions of the Federal Power Act [ 16 U.S.C. 791a et seq.].
§ 831. Creation; short title
For the purpose of maintaining and operating the properties now owned by the United States in the vicinity of Muscle Shoals, Alabama, in the interest of the National defense and for agricultural and industrial development, and to improve navigation in the Tennessee River and to control the destructive flood waters in the Tennessee River and Mississippi River Basins, there is created a body corporate by the name of the “Tennessee Valley Authority” (hereinafter referred to as the “Corporation”). The Board of Directors first appointed shall be deemed the incorporators, and the incorporation shall be held to have been effected from the date of the first meeting of the Board. This chapter may be cited as the “Tennessee Valley Authority Act of 1933.”
§ 831a. Membership, operation, and duties of the Board of Directors
- (a)
- (1) The Board of Directors of the Corporation (referred to in this chapter as the “Board”) shall be composed of 9 members appointed by the President by and with the advice and consent of the Senate, at least 7 of whom shall be a legal resident of the service area of the Corporation.
- (2) The members of the Board shall select 1 of the members to act as chairman of the Board.
- (b) To be eligible to be appointed as a member of the Board, an individual—
- (1) shall be a citizen of the United States;
- (2) shall have management expertise relative to a large for-profit or nonprofit corporate, government, or academic structure;
- (3) shall not be an employee of the Corporation;
- (4) shall make full disclosure to Congress of any investment or other financial interest that the individual holds in the energy industry; and
- (5) shall affirm support for the objectives and missions of the Corporation, including being a national leader in technological innovation, low-cost power, and environmental stewardship.
- (c) In appointing members of the Board, the President shall—
- (1) consider recommendations from such public officials as—
- (A) the Governors of States in the service area;
- (B) individual citizens;
- (C) business, industrial, labor, electric power distribution, environmental, civic, and service organizations; and
- (D) the congressional delegations of the States in the service area; and
- (2) seek qualified members from among persons who reflect the diversity, including the geographical diversity, and needs of the service area of the Corporation.
- (1) consider recommendations from such public officials as—
- (d)
- (1) A member of the Board shall serve a term of 5 years. A member of the Board whose term has expired may continue to serve after the member’s term has expired until the date on which a successor takes office, except that the member shall not serve beyond the end of the session of Congress in which the term of the member expires.
- (2) A member appointed to fill a vacancy on the Board occurring before the expiration of the term for which the predecessor of the member was appointed shall be appointed for the remainder of that term.
- (e)
- (1) Five of the members of the Board shall constitute a quorum for the transaction of business.
- (2) A vacancy on the Board shall not impair the power of the Board to act.
- (f)
- (1) A member of the Board shall be entitled to receive—
- (A) a stipend of—
- (i) $45,000 per year; or
- (ii)
- (I) in the case of the chairman of any committee of the Board created by the Board, $46,000 per year; or
- (II) in the case of the chairman of the Board, $50,000 per year; and
- (B) travel expenses, including per diem in lieu of subsistence, in the same manner as persons employed intermittently in Government service under section 5703 of title 5 .
- (A) a stipend of—
- (2) The amount of the stipends under paragraph (1)(A) shall be adjusted by the same percentage, at the same time and manner, and subject to the same limitations as are applicable to adjustments under section 5318 of title 5 .
- (1) A member of the Board shall be entitled to receive—
- (g)
- (1) The Board shall—
- (A) establish the broad goals, objectives, and policies of the Corporation that are appropriate to carry out this chapter;
- (B) develop long-range plans to guide the Corporation in achieving the goals, objectives, and policies of the Corporation and provide assistance to the chief executive officer to achieve those goals, objectives, and policies;
- (C) ensure that those goals, objectives, and policies are achieved;
- (D) approve an annual budget for the Corporation;
- (E) adopt and submit to Congress a conflict-of-interest policy applicable to members of the Board and employees of the Corporation;
- (F) establish a compensation plan for employees of the Corporation in accordance with subsection (i);
- (G) approve all compensation (including salary or any other pay, bonuses, benefits, incentives, and any other form of remuneration) of all managers and technical personnel that report directly to the chief executive officer (including any adjustment to compensation);
- (H) ensure that all activities of the Corporation are carried out in compliance with applicable law;
- (I) create an audit committee, composed solely of Board members independent of the management of the Corporation, which shall—
- (i) in consultation with the inspector general of the Corporation, recommend to the Board an external auditor;
- (ii) receive and review reports from the external auditor of the Corporation and inspector general of the Corporation; and
- (iii) make such recommendations to the Board as the audit committee considers necessary;
- (J) create such other committees of Board members as the Board considers to be appropriate;
- (K) conduct such public hearings as it deems appropriate on issues that could have a substantial effect on—
- (i) the electric ratepayers in the service area; or
- (ii) the economic, environmental, social, or physical well-being of the people of the service area;
- (L) establish the electricity rates charged by the Corporation; and
- (M) engage the services of an external auditor for the Corporation.
- (2) The Board shall meet at least 4 times each year.
- (1) The Board shall—
- (h)
- (1) The Board shall appoint a person to serve as chief executive officer of the Corporation.
- (2)
- (A) To serve as chief executive officer of the Corporation, a person—
- (i) shall have senior executive-level management experience in large, complex organizations;
- (ii) shall not be a current member of the Board or have served as a member of the Board within 2 years before being appointed chief executive officer; and
- (iii) shall comply with the conflict-of-interest policy adopted by the Board.
- (B) In appointing a chief executive officer, the Board shall give particular consideration to appointing an individual with expertise in the electric industry and with strong financial skills.
- (A) To serve as chief executive officer of the Corporation, a person—
- (3) The chief executive officer shall serve at the pleasure of the Board.
- (i)
- (1) The Board shall approve a compensation plan that specifies all compensation (including salary or any other pay, bonuses, benefits, incentives, and any other form of remuneration) for the chief executive officer and employees of the Corporation.
- (2) The compensation plan shall be based on an annual survey of the prevailing compensation for similar positions in private industry, including engineering and electric utility companies, publicly owned electric utilities, and Federal, State, and local governments.
- (3) The compensation plan shall provide that education, experience, level of responsibility, geographic differences, and retention and recruitment needs will be taken into account in determining compensation of employees.
- (4) The chief executive officer shall determine the salary and benefits of employees whose annual salary is not greater than the annual rate payable for positions at level IV of the Executive Schedule under section 5315 of title 5 .
- (5) On the recommendation of the chief executive officer, the Board shall approve the salaries of employees whose annual salaries would be in excess of the annual rate payable for positions at level IV of the Executive Schedule under section 5315 of title 5 .
§ 831aa. Laws repealed
All acts or parts of acts in conflict with this chapter are repealed, so far as they affect the operations contemplated by this chapter.
§ 831b. Officers and employees; wages of laborers and mechanics; application of employees’ compensation provisions
- (a) The chief executive officer shall appoint, with the advice and consent of the Board, and without regard to the provisions of the civil service laws applicable to officers and employees of the United States, such managers, assistant managers, officers, employees, attorneys, and agents as are necessary for the transaction of the business of the Corporation.
- (b) All contracts to which the Corporation is a party and which require the employment of laborers and mechanics in the construction, alteration, maintenance, or repair of buildings, dams, locks, or other projects shall contain a provision that not less than the prevailing rate of wages for work of a similar nature prevailing in the vicinity shall be paid to such laborers or mechanics. In the event any dispute arises as to what are the prevailing rates of wages, the question shall be referred to the Secretary of Labor for determination, and his decision shall be final. In the determination of such prevailing rate or rates, due regard shall be given to those rates which have been secured through collective agreement by representatives of employers and employees. Where such work as is described in the two preceding paragraphs is done directly by the Corporation the prevailing rate of wages shall be paid in the same manner as though such work had been let by contract. Insofar as applicable, the benefits of subchapter I of chapter 81 of title 5 shall extend to persons given employment under the provisions of this chapter.
§ 831bb. Reservation of right to amend or repeal
The right to alter, amend, or repeal this chapter is expressly declared and reserved, but no such amendment or repeal shall operate to impair the obligation of any contract made by said Corporation under any power conferred by this chapter.
§ 831c. Corporate powers generally; eminent domain; construction of dams, transmission lines, etc.
Except as otherwise specifically provided in this chapter, the Corporation—
- (a) Shall have succession in its corporate name.
- (b) May sue and be sued in its corporate name.
- (c) May adopt and use a corporate seal, which shall be judicially noticed.
- (d) May make contracts, as herein authorized.
- (e) May adopt, amend, and repeal bylaws.
- (f) May purchase or lease and hold such real and personal property as it deems necessary or convenient in the transaction of its business, and may dispose of any such personal property held by it. The Board shall select a treasurer and as many assistant treasurers as it deems proper: Provided , That any member of said Board may be removed from office at any time by a concurrent resolution of the Senate and the House of Representatives.
- (g) Shall have such powers as may be necessary or appropriate for the exercise of the powers herein specifically conferred upon the Corporation.
- (h) Shall have power in the name of the United States of America to exercise the right of eminent domain, and in the purchase of any real estate or the acquisition of real estate by condemnation proceedings, the title to such real estate shall be taken in the name of the United States of America, and thereupon all such real estate shall be entrusted to the Corporation as the agent of the United States to accomplish the purposes of this chapter.
- (i) Shall have power to acquire real estate for the construction of dams, reservoirs, transmission lines, power houses, and other structures, and navigation projects at any point along the Tennessee River, or any of its tributaries, and in the event that the owner or owners of such property shall fail and refuse to sell to the Corporation at a price deemed fair and reasonable by the Board, then the Corporation may proceed to exercise the right of eminent domain, and to condemn all property that it deems necessary for carrying out the purposes of this chapter, and all such condemnation proceedings shall be had pursuant to the provisions and requirements hereinafter specified, with reference to any and all condemnation proceedings: Provided , That nothing contained herein or elsewhere in this chapter shall be construed to deprive the Corporation of the rights conferred by sections 3114, 3115, and 3118 of title 40.
- (j) Shall have power to construct such dams, and reservoirs, in the Tennessee River and its tributaries, as in conjunction with Wilson Dam, and Norris, Wheeler, and Pickwick Landing Dams, now under construction, will provide a nine-foot channel in the said river and maintain a water supply for the same, from Knoxville to its mouth, and will best serve to promote navigation on the Tennessee River and its tributaries and control destructive flood waters in the Tennessee and Mississippi River drainage basins; and shall have power to acquire or construct power houses, power structures, transmission lines, navigation projects, and incidental works in the Tennessee River and its tributaries, and to unite the various power installations into one or more systems by transmission lines.
- (k) Shall have power in the name of the United States—
- (l) Shall have power to advise and cooperate in the readjustment of the population displaced by the construction of dams, the acquisition of reservoir areas, the protection of watersheds, the acquisition of rights-of-way, and other necessary acquisitions of land, in order to effectuate the purposes of the chapter; and may cooperate with Federal, State, and local agencies to that end.
§ 831cc. Separability
The sections of this chapter are declared to be separable, and in the event any one or more sections of this chapter be held to be unconstitutional, the same shall not affect the validity of other sections of this chapter.
§ 831d. Directors; maintenance and operation of plant for production, sale, and distribution of fertilizer and power
The Board is authorized—
- (a) To contract with commercial producers for the production of such fertilizers or fertilizer materials as may be needed in the Government’s program of development and introduction in excess of that produced by Government plants. Such contracts may provide either for outright purchase of materials by the Board or only for the payment of carrying charges on special materials manufactured at the board’s 1 1 So in original. Probably should be “Board’s”. request for its program.
- (b) To arrange with farmers and farm organizations for large-scale practical use of the new forms of fertilizers under conditions permitting an accurate measure of the economic return they produce.
- (c) To cooperate with National, State, district, or county experimental stations or demonstration farms, with farmers, landowners, and associations of farmers or landowners, for the use of new forms of fertilizer or fertilizer practices during the initial or experimental period of their introduction, and for promoting the prevention of soil erosion by the use of fertilizers and otherwise.
- (d) The Board, in order to improve and cheapen the production of fertilizer, is authorized to manufacture and sell fixed nitrogen, fertilizer, and fertilizer ingredients at Muscle Shoals by the employment of existing facilities, by modernizing existing plants, or by any other process or processes that in its judgment shall appear wise and profitable for the fixation of atmospheric nitrogen or the cheapening of the production of fertilizer.
- (e) Under the authority of this chapter the Board may make donations or sales of the product of the plant or plants operated by it to be fairly and equitably distributed through the agency of county demonstration agents, agricultural colleges, or otherwise as the Board may direct, for experimentation, education, and introduction of the use of such products in cooperation with practical farmers so as to obtain information as to the value, effect, and best methods of their use.
- (f) The Board is authorized to make alterations, modifications, or improvements in existing plants and facilities, and to construct new plants.
- (g) In the event it is not used for the fixation of nitrogen for agricultural purposes or leased, then the Board shall maintain in stand-by condition nitrate plant numbered 2, or its equivalent, for the fixation of atmospheric nitrogen, for the production of explosives in the event of war or a national emergency, until the Congress shall by joint resolution release the Board from this obligation, and if any part thereof be used by the Board for the manufacture of phosphoric acid or potash, the balance of nitrate plant numbered 2 shall be kept in stand-by condition.
- (h) To establish, maintain, and operate laboratories and experimental plants, and to undertake experiments for the purpose of enabling the Corporation to furnish nitrogen products for military purposes, and nitrogen and other fertilizer products for agricultural purposes in the most economical manner and at the highest standard of efficiency.
- (i) To request the assistance and advice of any officer, agent, or employee of any executive department or of any independent office of the United States, to enable the Corporation the better to carry out its powers successfully, and as far as practicable shall utilize the services of such officers, agents, and employees, and the President shall, if in his opinion the public interest, service, or economy so require, direct that such assistance, advice, and service be rendered to the Corporation, and any individual that may be by the President directed to render such assistance, advice, and service shall be thereafter subject to the orders, rules, and regulations of the Board: Provided , That any invention or discovery made by virtue of and incidental to such service by an employee of the Government of the United States serving under this section, or by any employee of the Corporation, together with any patents which may be granted thereon, shall be the sole and exclusive property of the Corporation, which is authorized to grant such licenses thereunder as shall be authorized by the Board: Provided further , That the Board may pay to such inventor such sum from the income from sale of licenses as it may deem proper.
- (j) Upon the requisition of the Secretary of the Army or the Secretary of the Navy to manufacture for and sell at cost to the United States explosives or their nitrogenous content.
- (k) Upon the requisition of the Secretary of the Army, the Corporation shall allot and deliver without charge to the Department of the Army so much power as shall be necessary in the judgment of said Department for use in operation of all locks, lifts, or other facilities in aid of navigation.
- (l) To produce, distribute, and sell electric power, as herein particularly specified.
§ 831dd. Liberal construction of chapter; sale of surplus lands
This chapter shall be liberally construed to carry out the purposes of Congress to provide for the disposition of and make needful rules and regulations respecting Government properties entrusted to the Authority, provide for the national defense, improve navigation, control destructive floods, and promote interstate commerce and the general welfare, but no real estate shall be held except what is necessary in the opinion of the Board to carry out plans and projects actually decided upon requiring the use of such land: Provided , That any land purchased by the Authority and not necessary to carry out plans and projects actually decided upon shall be sold by the Authority as agent of the United States, after due advertisement, at public auction to the highest bidder.
§ 831e. Officers and employees; nonpolitical appointment; removal for violation
In the appointment of officials and the selection of employees for said Corporation, and in the promotion of any such employees or officials, no political test or qualification shall be permitted or given consideration, but all such appointments and promotions shall be given and made on the basis of merit and efficiency. Any member of said Board who is found by the President of the United States to be guilty of a violation of this section shall be removed from office by the President of the United States, and any appointee of said Board who is found by the Board to be guilty of a violation of this section shall be removed from office by said Board.
§ 831ee. Essential stewardship activities
For essential stewardship activities for which appropriations were provided to the Tennessee Valley Authority in Public Law 104–206 , such sums as are necessary in fiscal year 1999 and thereafter, to be derived only from one or more of the following sources: nonpower fund balances and collections; investment returns of the nonpower program; applied programmatic savings in the power and nonpower programs; savings from the suspension of bonuses and awards; savings from reductions in memberships and contributions; increases in collections resulting from nonpower activities, including user fees; or increases in charges to private and public utilities both investor and cooperatively owned, as well as to direct load customers: Provided , That such funds are available to fund the stewardship activities under this section, notwithstanding sections 11, 14, 15, 29 [ 16 U.S.C. 831j , 831m, 831n, 831bb], or other provisions of the Tennessee Valley Authority Act [ 16 U.S.C. 831 et seq.], as amended, or provisions of the TVA power bond covenants: Provided further , That the savings from, and revenue adjustments to, the TVA budget in fiscal year 1999 and thereafter shall be sufficient to fund the aforementioned stewardship activities such that the net spending authority and resulting outlays for these activities shall not exceed $0 in fiscal year 1999 and thereafter.
§ 831f. Control of plants and property vested in Corporation; transfer of other property to Corporation
In order to enable the Corporation to exercise the powers and duties vested in it by this chapter—
- (a) The exclusive use, possession, and control of the United States nitrate plants numbered 1 and 2, including steam plants, located, respectively, at Sheffield, Alabama, and Muscle Shoals, Alabama, together with all real estate and buildings connected therewith, all tools and machinery, equipment, accessories, and materials belonging thereto, and all laboratories and plants used as auxiliaries thereto; the fixed-nitrogen research laboratory, the Waco limestone quarry, in Alabama, and Dam Numbered 2, located at Muscle Shoals, its power house, and all hydroelectric and operating appurtenances (except the locks), and all machinery, lands, and buildings in connection therewith, and all appurtenances thereof, and all other property to be acquired by the Corporation in its own name or in the name of the United States of America, are intrusted to the Corporation for the purposes of this chapter.
- (b) The President of the United States is authorized to provide for the transfer to the Corporation of the use, possession, and control of such other real or personal property of the United States as he may from time to time deem necessary and proper for the purposes of the Corporation as herein stated.
§ 831g. Principal office of Corporation; books; directors’ oath
- (a) The Corporation shall maintain its principal office in the immediate vicinity of Muscle Shoals, Alabama. The Corporation shall be held to be an inhabitant and resident of the northern judicial district of Alabama within the meaning of the laws of the United States relating to the venue of civil suits.
- (b) The Corporation shall at all times maintain complete and accurate books of accounts.
- (c) Each member of the Board, before entering upon the duties of his office, shall subscribe to an oath (or affirmation) to support the Constitution of the United States and to faithfully and impartially perform the duties imposed upon him by this chapter.
§ 831h. Annual financial statement; purchases and contracts; audit by Comptroller General
- (a) The Board shall file with the President and with the Congress, in March of each year, a financial statement and a complete report as to the business of the Corporation covering the preceding governmental fiscal year. This report shall include an itemized statement of the cost of power at each power station, the total number of employees and the names, salaries, and duties of those receiving compensation at the rate of more than $1,500 a year.
- (b) All purchases and contracts for supplies or services, except for personal services, made by the Corporation, shall be made after advertising, in such manner and at such times sufficiently in advance of opening bids, as the Board shall determine to be adequate to insure notice and opportunity for competition: Provided , That advertisement shall not be required when, (1) an emergency requires immediate delivery of the supplies or performance of the services; or (2) repair parts, accessories, supplemental equipment, or services are required for supplies or services previously furnished or contracted for; or (3) the aggregate amount involved in any purchase of supplies or procurement of services does not exceed $25,000; in which cases such purchases of supplies or procurement of services may be made in the open market in the manner common among businessmen: Provided further , That in comparing bids and in making awards the Board may consider such factors as relative quality and adaptability of supplies or services, the bidder’s financial responsibility, skill, experience, record of integrity in dealing, ability to furnish repairs and maintenance services, the time of delivery or performance offered, and whether the bidder has complied with the specifications.
- (c) The Comptroller General of the United States shall audit the transactions of the Corporation at such times as he shall determine, but not less frequently than once each governmental fiscal year, with personnel of his selection. In such connection he and his representatives shall have free and open access to all papers, books, records, files, accounts, plants, warehouses, offices, and all other things, property, and places belonging to or under the control of or used or employed by the Corporation, and shall be afforded full facilities for counting all cash and verifying transactions with and balances in depositaries. He shall make report of each such audit in quadruplicate, one copy for the President of the United States, one for the chairman of the Board, one for public inspection at the principal office of the Corporation, and the other to be retained by him for the uses of the Congress: Provided , That such report shall not be made until the Corporation shall have had reasonable opportunity to examine the exceptions and criticisms of the Comptroller General or the Government Accountability Office, to point out errors therein, explain or answer the same, and to file a statement which shall be submitted by the Comptroller General with his report. The expenses for each such audit shall be paid from any appropriation or appropriations for the Government Accountability Office, and such part of such expenses as may be allocated to the cost of generating, transmitting, and distributing electric energy shall be reimbursed promptly by the Corporation as billed by the Comptroller General. Nothing in this chapter shall be construed to relieve the Treasurer or other accountable officers or employees of the Corporation from compliance with the provisions of existing law requiring the rendition of accounts for adjustment and settlement pursuant to sections 3526(a) and 3702(a) of title 31, and accounts for all receipts and disbursements by or for the Corporation shall be rendered accordingly: Provided , That, subject only to the provisions of this chapter, the Corporation is authorized to make such expenditures and to enter into such contracts, agreements, and arrangements, upon such terms and conditions and in such manner as it may deem necessary, including the final settlement of all claims and litigation by or against the Corporation; and, notwithstanding the provisions of any other law governing the expenditure of public funds, the Government Accountability Office, in the settlement of the accounts of the Treasurer or other accountable officer or employee of the Corporation, shall not disallow credit for, nor withhold funds because of, any expenditure which the Board shall determine to have been necessary to carry out the provisions of said chapter.
- (d) The Corporation shall determine its own system of administrative accounts and the forms and contents of its contracts and other business documents except as otherwise provided in this chapter.
§ 831i. Sale of surplus power; preferences; experimental work; acquisition of existing electric facilities
The Board is empowered and authorized to sell the surplus power not used in its operations, and for operation of locks and other works generated by it, to States, counties, municipalities, corporations, partnerships, or individuals, according to the policies hereinafter set forth; and to carry out said authority, the Board is authorized to enter into contracts for such sale for a term not exceeding twenty years, and in the sale of such current by the Board it shall give preference to States, counties, municipalities, and cooperative organizations of citizens or farmers, not organized or doing business for profit, but primarily for the purpose of supplying electricity to its own citizens or members: Provided , That all contracts made with private companies or individuals for the sale of power, which power is to be resold for a profit, shall contain a provision authorizing the Board to cancel said contract upon five years’ notice in writing, if the Board needs said power to supply the demands of States, counties, or municipalities. In order to promote and encourage the fullest possible use of electric light and power on farms within reasonable distance of any of its transmission lines the Board in its discretion shall have power to construct transmission lines to farms and small villages that are not otherwise supplied with electricity at reasonable rates, and to make such rules and regulations governing such sale and distribution of such electric power as in its judgment may be just and equitable: Provided further , That the Board is authorized and directed to make studies, experiments, and determinations to promote the wider and better use of electric power for agricultural and domestic use, or for small or local industries, and it may cooperate with State governments, or their subdivisions or agencies, with educational or research institutions, and with cooperatives or other organizations, in the application of electric power to the fuller and better balanced development of the resources of the region: Provided further , That the Board is authorized to include in any contract for the sale of power such terms and conditions, including resale rate schedules, and to provide for such rules and regulations as in its judgment may be necessary or desirable for carrying out the purposes of this chapter, and in case the purchaser shall fail to comply with any such terms and conditions, or violate any such rules and regulations, said contract may provide that it shall be voidable at the election of the Board: Provided further , That in order to supply farms and small villages with electric power directly as contemplated by this section, the Board in its discretion shall have power to acquire existing electric facilities used in serving such farms and small villages: And provided further , That the terms “States”, “counties”, and “municipalities” as used in this chapter shall be construed to include the public agencies of any of them unless the context requires a different construction.
§ 831j. Equitable distribution of surplus power among States and municipalities; improvement in production of fertilizer
It is declared to be the policy of the Government so far as practical to distribute and sell the surplus power generated at Muscle Shoals equitably among the States, counties, and municipalities within transmission distance. This policy is further declared to be that the projects herein provided for shall be considered primarily as for the benefit of the people of the section as a whole and particularly the domestic and rural consumers to whom the power can economically be made available, and accordingly that sale to and use by industry shall be a secondary purpose, to be utilized principally to secure a sufficiently high load factor and revenue returns which will permit domestic and rural use at the lowest possible rates and in such manner as to encourage increased domestic and rural use of electricity. It is further declared to be the policy of the Government to utilize the Muscle Shoals properties so far as may be necessary to improve, increase, and cheapen the production of fertilizer and fertilizer ingredients by carrying out the provisions of this chapter.
§ 831k. Transmission lines; construction or lease; sale of power over other than Government lines; rates when sold for resale at profit
In order to place the Board upon a fair basis for making such contracts and for receiving bids for the sale of such power, it is expressly authorized, either from appropriations made by Congress or from funds secured from the sale of such power, or from funds, secured by the sale of bonds hereafter provided for, to construct, lease, purchase, or authorize the construction of transmission lines within transmission distance from the place where generated, and to interconnect with other systems. The Board is also authorized to lease to any person, persons, or corporation the use of any transmission line owned by the Government and operated by the Board, but no such lease shall be made that in any way interferes with the use of such transmission line by the Board: Provided , That if any State, county, municipality, or other public or cooperative organization of citizens or farmers, not organized or doing business for profit, but primarily for the purpose of supplying electricity to its own citizens or members, or any two or more of such municipalities or organizations, shall construct or agree to construct and maintain a properly designed and built transmission line to the Government reservation upon which is located a Government generating plant, or to a main transmission line owned by the Government or leased by the Board and under the control of the Board, the Board is authorized and directed to contract with such State, county, municipality, or other organization, or two or more of them, for the sale of electricity for a term not exceeding thirty years; and in any such case the Board shall give to such State, county, municipality, or other organization ample time to fully comply with any local law now in existence or hereafter enacted providing for the necessary legal authority for such State, county, municipality, or other organization to contract with the Board for such power: Provided further , That all contracts entered into between the Corporation and any municipality or other political subdivision or cooperative organization shall provide that the electric power shall be sold and distributed to the ultimate consumer without discrimination as between consumers of the same class, and such contract shall be voidable at the election of the Board if a discriminatory rate, rebate, or other special concession is made or given to any consumer or user by the municipality or other political subdivision or cooperative organization: And provided further , That as to any surplus power not so sold as above provided to States, counties, municipalities, or other said organizations, before the Board shall sell the same to any person or corporation engaged in the distribution and resale of electricity for profit, it shall require said person or corporation to agree that any resale of such electric power by said person or corporation shall be made to the ultimate consumer of such electric power at prices that shall not exceed a schedule fixed by the Board from time to time as reasonable, just, and fair; and in case of any such sale, if an amount is charged the ultimate consumer which is in excess of the price so deemed to be just, reasonable, and fair by the Board, the contract for such sale between the Board and such distributor of electricity shall be voidable at the election of the Board: And provided further , That the Board is authorized to enter into contracts with other power systems for the mutual exchange of unused excess power upon suitable terms, for the conservation of stored water, and as an emergency or break-down relief.
§ 831l. Financial assistance to States and local governments in lieu of taxation; apportionment; limitation on contracts for sale of power to municipalities; report to Congress
In order to render financial assistance to those States and local governments in which the power operations of the Corporation are carried on and in which the Corporation has acquired properties previously subject to State and local taxation, the Board is authorized and directed to pay to said States, and the counties therein, for each fiscal year, beginning July 1, 1940 , the following percentages of the gross proceeds derived from the sale of power by the Corporation for the preceding fiscal year as hereinafter provided, together with such additional amounts as may be payable pursuant to the provisions hereinafter set forth, said payments to constitute a charge against the power operations of the Corporation: For the fiscal year (beginning July 1) 1940, 10 per centum; 1941, 9 per centum; 1942, 8 per centum; 1943, 7½ per centum; 1944, 7 per centum; 1945, 6½ per centum; 1946, 6 per centum; 1947, 5½ per centum; 1948 and each fiscal year thereafter, 5 per centum. “Gross proceeds”, as used in this section, is defined as the total gross proceeds derived by the Corporation from the sale of power for the preceding fiscal year, excluding power used by the Corporation or sold or delivered to any other department or agency of the Government of the United States for any purpose other than the resale thereof. The payments herein authorized are in lieu of taxation, and the Corporation, its property, franchises and income, are expressly exempted from taxation in any manner or form by any State, county, municipality, or any subdivision or district thereof. The payment for each fiscal year shall be apportioned among said States in the following manner: One-half of said payment shall be apportioned by paying to each State the percentage thereof which the gross proceeds of the power sales by the Corporation within said State during the preceding fiscal year bears to the total gross proceeds from all power sales by the Corporation during the preceding fiscal year; the remaining one-half of said payment shall be apportioned by paying to each State the percentage thereof which the book value of the power property held by the Corporation within said State at the end of the preceding fiscal year bears to the total book value of all such property held by the Corporation on the same date. The book value of power property shall include that portion of the investment allocated or estimated to be allocable to power: Provided , That the minimum annual payment to each State (including payments to counties therein) shall not be less than an amount equal to the two-year average of the State and local ad valorem property taxes levied against power property purchased and operated by the Corporation in said State and against that portion of reservoir lands related to dams constructed by or on behalf of the United States Government and held or operated by the Corporation and allocated or estimated to be allocable to power. The said two-year average shall be calculated for the last two tax years during which said property was privately owned and operated or said land was privately owned: Provided further , That the minimum annual payment to each State in which the Corporation owns and operates power property (including payments to counties therein) shall not be less than $10,000 in any case: Provided further , That the corporation 1 1 So in original. Probably should be capitalized. shall pay directly to the respective counties the two-year average of county ad valorem property taxes (including taxes levied by taxing districts within the respective counties) upon power property and reservoir lands allocable to power, determined as above provided, and all payments to any such county within a State shall be deducted from the payment otherwise due to such State under the provisions of this section. The determination of the Board of the amounts due hereunder to the respective States and counties shall be final. The payments above provided shall in each case be made to the State or county in equal monthly installments beginning not later than July 31, 1940 . Nothing herein shall be construed to limit the authority of the Corporation in its contracts for the sale of power to municipalities, to permit or provide for the resale of power at rates which may include an amount to cover tax-equivalent payments to the municipality in lieu of State, county, and municipal taxes upon any distribution system or property owned by the municipality, or any agency thereof, conditioned upon a proper distribution by the municipality of any amounts collected by it in lieu of State or county taxes upon any such distribution system or property; it being the intention of Congress that either the municipality or the State in which the municipality is situated shall provide for the proper distribution to the State and county of any portion of tax equivalent so collected by the municipality in lieu of State or county taxes upon any such distribution system or property. The Corporation shall, not later than January 1, 1945 , submit to the Congress a report on the operation of the provisions of this section, including a statement of the distribution to the various States and counties hereunder; the effect of the operation of the provisions of this section on State and local finances; an appraisal of the benefits of the program of the Corporation to the States and counties receiving payments hereunder, and the effect of such benefits in increasing taxable values within such States and counties; and such other data, information, and recommendations as may be pertinent to future legislation.
§ 831m. Allocation and charge of value and cost of plants to particular objects; cost accounting; reports of costs of operation; sale of surplus power at profit
- (1) flood control,
- (2) navigation,
- (3) fertilizer,
- (4) national defense, and
- (5) the development of power. The findings thus made by the Board, when approved by the President of the United States, shall be final, and such findings shall thereafter be used in all allocation of value for the purpose of keeping the book value of said properties. In like manner, the cost and book value of any dams, steam plants, or other similar improvements hereafter constructed and turned over to said Board for the purpose of control and management shall be ascertained and allocated. The Board shall, on or before January 1, 1937 , file with Congress a statement of its allocation of the value of all such properties turned over to said Board, and which have been completed prior to the end of the preceding fiscal year, and shall thereafter in its annual report to Congress file a statement of its allocation of the value of such properties as have been completed during the preceding fiscal year. For the purpose of accumulating data useful to the Congress in the formulation of legislative policy in matters relating to the generation, transmission, and distribution of electric energy and the production of chemicals necessary to national defense and useful in agriculture, and to the Federal Power Commission and other Federal and State agencies, and to the public, the Board shall keep complete accounts of its costs of generation, transmission, and distribution of electric energy and shall keep a complete account of the total cost of generating and transmission facilities constructed or otherwise acquired by the Corporation, and of producing such chemicals, and a description of the major components of such costs according to such uniform systems of accounting for public utilities as the Federal Power Commission has, and if it have none, then it is empowered and directed to prescribe such uniform system of accounting, together with records of such other physical data and operating statistics of the Authority as may be helpful in determining the actual cost and value of services, and the practices, methods, facilities, equipment, appliances, and standards and sizes, types, location, and geographical and economic integration of plants and systems best suited to promote the public interest, efficiency, and the wider and more economical use of electric energy. Such data shall be reported to the Congress by the Board from time to time, with appropriate analyses and recommendations, and, so far as practicable, shall be made available to the Federal Power Commission and other Federal and State agencies which may be concerned with the administration of legislation relating to the generation, transmission, or distribution of electric energy and chemicals useful to agriculture. It is declared to be the policy of this chapter that, in order, as soon as practicable, to make the power projects self-supporting and self-liquidating, the surplus power shall be sold at rates which, in the opinion of the Board, when applied to the normal capacity of the Authority’s power facilities, will produce gross revenues in excess of the cost of production of said power and in addition to the statement of the cost of power at each power station as required by section 831h of this title , the Board shall file with each annual report, a statement of the total cost of all power generated by it at all power stations during each year, the average cost of such power per kilowatt hour, the rates at which sold, and to whom sold, and copies of all contracts for the sale of power.
§ 831n. Bonds for future construction; amount, terms, and conditions
In the construction of any future dam, steam plant, or other facility, to be used in whole or in part for the generation or transmission of electric power the Board is authorized and empowered to issue on the credit of the United States and to sell serial bonds not exceeding $50,000,000 in amount, having a maturity not more than fifty years from the date of issue thereof, and bearing interest not exceeding 3½ per centum per annum. Said bonds shall be issued and sold in amounts and prices approved by the Secretary of the Treasury, but all such bonds as may be so issued and sold shall have equal rank. None of said bonds shall be sold below par, and no fee, commission, or compensation whatever shall be paid to any person, firm, or corporation for handling, negotiating the sale, or selling the said bonds. All of such bonds so issued and sold shall have all the rights and privileges accorded by law to Panama Canal bonds, authorized by section 8 of the Act of June 28, 1902 , chapter 1302, as amended by the Act of December 21, 1905 (ch. 3, sec. 1, 34 Stat. 5 ). All funds derived from the sale of such bonds shall be paid over to the Corporation.
§ 831o. Completion of unfinished plants authorized
The Board, whenever the President deems it advisable, is empowered and directed to complete Dam Numbered 2 at Muscle Shoals, Alabama, and the steam plant at nitrate plant numbered 2, in the vicinity of Muscle Shoals, by installing in Dam Numbered 2 the additional power units according to the plans and specifications of said dam, and the additional power unit in the steam plant at nitrate plant numbered 2.
§ 831p. Repealed. Pub. L. 89–554, § 8(a) , Sept. 6, 1966 , 80 Stat. 648
§ 831q. Eminent domain; contracts for relocation of railroads, highways, industrial plants, etc.
In order to enable and empower the Secretary of the Army, the Secretary of the Interior, or the Board to carry out the authority conferred in this chapter, in the most economical and efficient manner, he or it is authorized and empowered in the exercise of the powers of national defense in aid of navigation, and in the control of the flood waters of the Tennessee and Mississippi Rivers, constituting channels of interstate commerce, to exercise the right of eminent domain for all purposes of this chapter, and to condemn all lands, easements, rights of way, and other area necessary in order to obtain a site for said Cove Creek Dam, and the flowage rights for the reservoir of water above said dam, and to negotiate and conclude contracts with States, counties, municipalities, and all State agencies and with railroads, railroad corporations, common carriers, and all public utility commissions and any other person, firm, or corporation, for the relocation of railroad tracks, highways, highway bridges, mills, ferries, electric-light plants, and any and all other properties, enterprises, and projects whose removal may be necessary in order to carry out the provisions of this chapter. When said Cove Creek Dam, transmission line, and power house shall have been completed, the possession, use, and control thereof shall be intrusted to the Corporation for use and operation in connection with the general Tennessee Valley project, and to promote flood control and navigation in the Tennessee River.
§ 831r. Patents; access to Patent and Trademark Office and right to copy patents; compensation to patentees
The Corporation, as an instrumentality and agency of the Government of the United States for the purpose of executing its constitutional powers, shall have access to the United States Patent and Trademark Office for the purpose of studying, ascertaining, and copying all methods, formula, and scientific information (not including access to pending applications for patents) necessary to enable the Corporation to use and employ the most efficacious and economical process for the production of fixed nitrogen, or any essential ingredient of fertilizer, or any method of improving and cheapening the production of hydroelectric power, and any owner of a patent whose patent rights may have been thus in any way copied, used, infringed, or employed by the exercise of this authority by the Corporation shall have as the exclusive remedy a cause of action against the Corporation to be instituted and prosecuted on the equity side of the appropriate district court of the United States, for the recovery of reasonable compensation for such infringement. The Under Secretary of Commerce for Intellectual Property and Director of the United States Patent and Trademark Office shall furnish to the Corporation, at its request and without payment of fees, copies of documents on file in his office: Provided , That the benefits of this section shall not apply to any art, machine, method of manufacture, or composition of matter, discovered or invented by such employee during the time of his employment or service with the Corporation or with the Government of the United States.
§ 831s. Possession by Government in time of war; damages to contract holders
The Government of the United States reserves the right, in case of war or national emergency declared by Congress, to take possession of all or any part of the property described or referred to in this chapter for the purpose of manufacturing explosives or for other war purposes; but, if this right is exercised by the Government, it shall pay the reasonable and fair damages that may be suffered by any party whose contract for the purchase of electric power or fixed nitrogen or fertilizer ingredients is violated, after the amount of the damages has been fixed by the United States Court of Federal Claims in proceedings instituted and conducted for that purpose under rules prescribed by the court.
§ 831t. Offenses; fines and punishment
- (a) All general penal statutes relating to the larceny, embezzlement, conversion, or to the improper handling, retention, use, or disposal of public moneys or property of the United States, shall apply to the moneys and property of the Corporation and to moneys and properties of the United States intrusted to the Corporation.
- (b) Any person who, with intent to defraud the Corporation, or to deceive any director, officer, or employee of the Corporation or any officer or employee of the United States (1) makes any false entry in any book of the Corporation, or (2) makes any false report or statement for the Corporation, shall, upon conviction thereof, be fined not more than $10,000 or imprisoned not more than five years, or both.
- (c) Any person who shall receive any compensation, rebate, or reward, or shall enter into any conspiracy, collusion, or agreement, express or implied, with intent to defraud the Corporation or wrongfully and unlawfully to defeat its purposes, shall, on conviction thereof, be fined not more than $5,000 or imprisoned not more than five years, or both.
§ 831u. Surveys; cooperation with States or other agencies
To aid further the proper use, conservation, and development of the natural resources of the Tennessee River drainage basin and of such adjoining territory as may be related to or materially affected by the development consequent to this chapter, and to provide for the general welfare of the citizens of said areas, the President is authorized, by such means or methods as he may deem proper within the limits of appropriations made therefor by Congress, to make such surveys of and general plans for said Tennessee basin and adjoining territory as may be useful to the Congress and to the several States in guiding and controlling the extent, sequence, and nature of development that may be equitably and economically advanced through the expenditure of public funds, or through the guidance or control of public authority, all for the general purpose of fostering an orderly and proper physical, economic, and social development of said areas; and the President is further authorized in making said surveys and plans to cooperate with the States affected thereby, or subdivisions or agencies of such States, or with cooperative or other organizations, and to make such studies, experiments, or demonstrations as may be necessary and suitable to that end.
§ 831v. Legislation to carry out purposes of chapter; recommendation by President
- (1) the maximum amount of flood control;
- (2) the maximum development of said Tennessee River for navigation purposes;
- (3) the maximum generation of electric power consistent with flood control and navigation;
- (4) the proper use of marginal lands;
- (5) the proper method of reforestation of all lands in said drainage basin suitable for reforestation; and
- (6) the economic and social well-being of the people living in said river basin.
§ 831w. Acquisition of real or personal property; payment by delivery of power; sale or lease of vacant land for industrial purposes
For the purpose of securing any rights of flowage, or obtaining title to or possession of any property, real or personal, that may be necessary or may become necessary, in the carrying out of any of the provisions of this chapter, the President of the United States for a period of three years from May 18, 1933 , is authorized to acquire title in the name of the United States to such rights or such property, and to provide for the payment for same by directing the Board to contract to deliver power generated at any of the plants now owned or hereafter owned or constructed by the Government or by said Corporation, such future delivery of power to continue for a period not exceeding thirty years. Likewise, for one year after May 18, 1933 , the President is further authorized to sell or lease any parcel or part of any vacant real estate now owned by the Government in said Tennessee River Basin, to persons, firms, or corporations who shall contract to erect thereon factories or manufacturing establishments, and who shall contract to purchase of said Corporation electric power for the operation of any such factory or manufacturing establishment. No contract shall be made by the President for the sale of any of such real estate as may be necessary for present or future use on the part of the Government for any of the purposes of this chapter. Any such contract made by the President of the United States shall be carried out by the Board: Provided , That no such contract shall be made that will in any way abridge or take away the preference right to purchase power given in this chapter to States, counties, municipalities, or farm organizations: Provided further , That no lease shall be for a term to exceed fifty years: Provided further , That any sale shall be on condition that said land shall be used for industrial purposes only.
§ 831x. Condemnation proceedings; institution by Corporation; venue
The Corporation may cause proceedings to be instituted for the acquisition by condemnation of any lands, easements, or rights-of-way which, in the opinion of the Corporation, are necessary to carry out the provisions of this chapter. The proceedings shall be instituted in the United States district court for the district in which the land, easement, right-of-way, or other interest, or any part thereof, is located, and such court shall have full jurisdiction to divest the complete title to the property sought to be acquired out of all persons or claimants and vest the same in the United States in fee simple, and to enter a decree quieting the title thereto in the United States of America.
§ 831y. Net proceeds over expense payable into Treasury
Commencing July 1, 1936 , the proceeds for each fiscal year derived by the Board from the sale of power or any other products manufactured by the Corporation, and from any other activities of the Corporation including the disposition of any real or personal property, shall be paid into the Treasury of the United States on March 31 of each year, save and except such part of such proceeds as in the opinion of the Board shall be necessary for the Corporation in the operation of dams and reservoirs, in conducting its business in generating, transmitting, and distributing electric energy and in manufacturing, selling, and distributing fertilizer and fertilizer ingredients. A continuing fund of $1,000,000 is also excepted from the requirements of this section and may be withheld by the Board to defray emergency expenses and to insure continuous operation: Provided , That nothing in this section shall be construed to prevent the use by the Board, after June 30, 1936 , of proceeds accruing prior to July 1, 1936 , for the payment of obligations lawfully incurred prior to such latter date.
§ 831z. Authorization of appropriations
All appropriations necessary to carry out the provisions of this chapter are authorized.
§ 832. Completion and maintenance of project; generation of electricity
For the purpose of improving navigation on the Columbia River, and for other purposes incidental thereto, the dam, locks, power plant, and appurtenant works under construction on August 20, 1937 , at Bonneville, Oregon and North Bonneville, Washington (called Bonneville project in this chapter), shall be completed, maintained, and operated under the direction of the Secretary of the Army and the supervision of the Chief of Engineers, subject to the provisions of this chapter relating to the powers and duties of the Bonneville power administrator provided for in section 832a(a) of this title (called the administrator in this chapter) respecting the transmission and sale of electric energy generated at said project. The Secretary of the Army shall provide, construct, operate, maintain, and improve at Bonneville project such machinery, equipment, and facilities for the generation of electric energy as the administrator may deem necessary to develop such electric energy as rapidly as markets may be found therefor. The electric energy thus generated and not required for the operation of the dam and locks at such project and the navigation facilities employed in connection therewith shall be delivered to the administrator, for disposition as provided in this chapter.
§ 832a. General administrative provisions
- (a) The electric energy generated in the operation of the said Bonneville project shall be disposed of by the said administrator as provided in this chapter. The administrator shall be appointed by the Secretary of Energy; shall be responsible to said Secretary of Energy; and shall maintain his principal office at a place selected by him in the vicinity of the Bonneville project. The Administrator shall, as in this chapter provided, make all arrangements for the sale and disposition of electric energy generated at Bonneville project not required for the operation of the dam and locks at such project and the navigation facilities employed in connection therewith. He shall act in consultation with the Secretary of Energy. The form of administration established in this chapter for the Bonneville project is intended to be provisional pending the establishment of a permanent administration for Bonneville and other projects in the Columbia River Basin. The Secretary of the Army shall install and maintain additional machinery, equipment, and facilities for the generation of electric energy at the Bonneville project when in the judgment of the administrator such additional generating facilities are desirable to meet actual or potential market requirements for such electric energy. The Secretary of the Army shall schedule the operations of the several electrical generating units and appurtenant equipment of the Bonneville project in accordance with the requirements of the administrator. The Secretary of the Army shall provide and maintain for the use of the administrator at said Bonneville project adequate station space and equipment, including such switches, switchboards, instruments, and dispatching facilities as may be required by the administrator for proper reception, handling, and dispatching of the electric energy produced at the said project, together with transformers and other equipment required by the administrator for the transmission of such energy from that place at suitable voltage to the markets which the administrator desires to serve. The office of the Administrator of the Bonneville project is constituted an office in the Department of Energy and shall be under the jurisdiction and control of the Secretary of Energy. All functions vested in the Administrator of the Bonneville project under this chapter may be exercised by the Secretary of Energy and, subject to his supervision and direction, by the Administrator and other personnel of the project.
- (b) In order to encourage the widest possible use of all electric energy that can be generated and marketed and to provide reasonable outlets therefor, and to prevent the monopolization thereof by limited groups, the administrator is authorized and directed to provide, construct, operate, maintain, and improve such electric transmission lines and substations, and facilities and structures appurtenant thereto, as he finds necessary, desirable, or appropriate for the purpose of transmitting electric energy, available for sale, from the Bonneville project to existing and potential markets, and, for the purpose of interchange of electric energy, to interconnect the Bonneville project with other Federal projects and publicly owned power systems constructed on or after August 20, 1937 .
- (c) The administrator is authorized, in the name of the United States, to acquire, by purchase, lease, condemnation, or donation, such real and personal property, or any interest therein, including lands, easements, rights-of-way, franchises, electric transmission lines, substations, and facilities and structures appurtenant thereto, as the administrator finds necessary or appropriate to carry out the purposes of this chapter. Title to all property and property rights acquired by the administrator shall be taken in the name of the United States.
- (d) The administrator shall have power to acquire any property or property rights, including patent rights, which in his opinion are necessary to carry out the purposes of this chapter, by the exercise of the right of eminent domain and to institute condemnation proceedings therefor in the same manner as is provided by law for the condemnation of real estate.
- (e) The administrator is authorized, in the name of the United States, to sell, lease, or otherwise dispose of such personal property as in his judgment is not required for the purposes of this chapter and such real property and interests in land acquired in connection with construction or operation of electric transmission lines or substations as in his judgment are not required for the purposes of this chapter: Provided, however , That before the sale, lease, or disposition of real property or transmission lines, as herein provided, the administrator shall secure the approval of the President of the United States.
- (f) Subject only to the provisions of this chapter, the Administrator is authorized to enter into such contracts, agreements, and arrangements, including the amendment, modification, adjustment, or cancelation 1 1 So in original. Probably should be “cancellation”. thereof and the compromise or final settlement of any claim arising thereunder, and to make such expenditures, upon such terms and conditions and in such manner as he may deem necessary.
§ 832b. Definitions
As employed in this chapter, the term “public body”, or “public bodies”, means States, public power districts, counties, and municipalities, including agencies or subdivisions of any thereof. As employed in this chapter, the term “cooperative”, or “cooperatives”, means any form of nonprofit-making organization or organizations of citizens supplying, or which may be created to supply, members with any kind of goods, commodities, or services, as nearly as possible at cost.
§ 832c. Distribution of electricity; preference to public bodies and cooperatives
- (a) In order to insure that the facilities for the generation of electric energy at the Bonneville project shall be operated for the benefit of the general public, and particularly of domestic and rural consumers, the administrator shall at all times, in disposing of electric energy generated at said project, give preference and priority to public bodies and cooperatives.
- (b) To preserve and protect the preferential rights and priorities of public bodies and cooperatives as provided in section 1 1 So in original. Probably should be “subsection”. (a) and to effectuate the intent and purpose of this chapter that at all times up to January 1, 1942 , there shall be available for sale to public bodies and cooperatives not less than 50 per centum of the electric energy produced at the Bonneville project, it shall be the duty of the administrator in making contracts for the sale of such energy to so arrange such contracts as to make such 50 per centum of such energy available to said public bodies and cooperatives until January 1, 1942 : Provided , That the electric energy so reserved for but not actually purchased by and delivered to such public bodies and cooperatives prior to January 1, 1942 , may be disposed of temporarily so long as such temporary disposition will not interfere with the purchase by and delivery to such public bodies and cooperatives at any time prior to January 1, 1942 : Provided further , That nothing herein contained shall be construed to limit or impair the preferential and priority rights of such public bodies or cooperatives after January 1, 1942 ; and in the event that after such date there shall be conflicting or competing applications for an allocation of electric energy between any public body or cooperative on the one hand and a private agency of any character on the other, the application of such public body or cooperative shall be granted.
- (c) An application by any public body or cooperative for an allocation of electric energy shall not be denied, or another application competing or in conflict therewith be granted, to any private corporation, company, agency, or person, on the ground that any proposed bond or other security issue of any such public body or cooperative, the sale of which is necessary to enable such prospective purchaser to enter into the public business of selling and distributing the electric energy proposed to be purchased, has not been authorized or marketed, until after a reasonable time, to be determined by the administrator, has been afforded such public body or cooperative to have such bond or other security issue authorized or marketed.
- (d) It is declared to be the policy of the Congress, as expressed in this chapter, to preserve the said preferential status of the public bodies and cooperatives herein referred to, and to give to the people of the States within economic transmission distance of the Bonneville project reasonable opportunity and time to hold any election or elections or take any action necessary to create such public bodies and cooperatives as the laws of such States authorize and permit, and to afford such public bodies or cooperatives reasonable time and opportunity to take any action necessary to authorize the issuance of bonds or to arrange other financing necessary to construct or acquire necessary and desirable electric distribution facilities, and in all other respects legally to become qualified purchasers and distributors of electric energy available under this chapter.
§ 832d. Contracts for sale of electricity
- (a) Subject to the provisions of this chapter and to such rate schedules as the Secretary of Energy may approve, as provided in this chapter, the administrator shall negotiate and enter into contracts for the sale at wholesale of electric energy, either for resale or direct consumption, to public bodies and cooperatives and to private agencies and persons and for the disposition of electric energy to Federal agencies. Contracts for the sale of electric energy to any private person or agency other than a privately owned public utility engaged in selling electric energy to the general public, shall contain a provision forbidding such private purchaser to resell any of such electric energy so purchased to any private utility or agency engaged in the sale of electric energy to the general public, and requiring the immediate canceling of such contract of sale in the event of violation of such provision. Contracts entered into under this subsection shall be binding in accordance with the terms thereof and shall be effective for such period or periods, including renewals or extensions, as may be provided therein, not exceeding in the aggregate twenty years from the respective dates of the making of such contracts. Contracts entered into under this subsection shall contain (1) such provisions as the administrator and purchaser agree upon for the equitable adjustment of rates at appropriate intervals, not less frequently than once in every five years, and (2) in the case of a contract with any purchaser engaged in the business of selling electric energy to the general public, the contract shall provide that the administrator may cancel such contract upon five years’ notice in writing if in the judgment of the administrator any part of the electric energy purchased under such contract is likely to be needed to satisfy the requirements of the said public bodies or cooperatives referred to in this chapter, and that such cancelation may be with respect to all or any part of the electric energy so purchased under said contract to the end that the preferential rights and priorities accorded public bodies and cooperatives under this chapter shall at all times be preserved. Contracts entered into with any utility engaged in the sale of electric energy to the general public shall contain such terms and conditions, including among other things stipulations concerning resale and resale rates by any such utility, as the administrator may deem necessary, desirable or appropriate to effectuate the purposes of this chapter and to insure that resale by such utility to the ultimate consumer shall be at rates which are reasonable and nondiscriminatory. Such contracts shall also require such utility to keep on file in the office of the administrator a schedule of all its rates and charges to the public for electric energy and such alterations and changes therein as may be put into effect by such utility.
- (b) The administrator is authorized to enter into contracts with public or private power systems for the mutual exchange of unused excess power upon suitable exchange terms for the purpose of economical operation or of providing emergency or break-down relief.
§ 832e. Rate schedules
Schedules of rates and charges for electric energy produced at the Bonneville project and sold to purchasers as in this chapter provided shall be prepared by the administrator and become effective upon confirmation and approval thereof by the Secretary of Energy; and such rates and charges shall also be applicable to dispositions of electric energy to Federal agencies. Subject to confirmation and approval by the Secretary of Energy, such rate schedules may be modified from time to time by the administrator, and shall be fixed and established with a view to encouraging the widest possible diversified use of electric energy. The said rate schedules may provide for uniform rates or rates uniform throughout prescribed transmission areas in order to extend the benefits of an integrated transmission system and encourage the equitable distribution of the electric energy developed at the Bonneville project.
§ 832f. Elements in determining rates
It is the intent of Congress that rate schedules for the sale of electric energy which is or may be generated at the Bonneville project in excess of the amount required for operating the dam, locks, and appurtenant works at said project shall be determined with due regard to and predicated upon the fact that such electric energy is developed from water power created as an incident to the construction of the dam in the Columbia River at the Bonneville project for the purposes set forth in section 832 of this title . Rate schedules shall be drawn having regard to the recovery (upon the basis of the application of such rate schedules to the capacity of the electric facilities of Bonneville project) of the cost of producing and transmitting such electric energy, including the amortization of the capital investment over a reasonable period of years. Rate schedules shall be based upon an allocation of costs made by the Secretary of Energy. In computing the cost of electric energy developed from water power created as an incident to and a byproduct of the construction of the Bonneville project, the Secretary of Energy may allocate to the costs of electric facilities such a share of the cost of facilities having joint value for the production of electric energy and other purposes as the power development may fairly bear as compared with such other purposes.
§ 832g. Purchase of supplies and services
- (1) an emergency requires immediate delivery of the supplies or performance of the services; or
- (2) repair parts, accessories, supplemental equipment, or services are required for supplies or services previously furnished or contracted for; or
- (3) the aggregate amount involved in any purchase of supplies or procurement of services does not exceed $500; in which cases such purchases of supplies or procurement of services may be made in the open market in the manner common among businessmen. In comparing bids and in making awards, the administrator or the Secretary of the Army, as the case may be, may consider such factors as relative quality and adaptability of supplies or services, the bidder’s financial responsibility, skill, experience, record of integrity in dealing, and ability to furnish repairs and maintenance services, the time of delivery or performance offered, and whether the bidder has complied with the specifications.
§ 832h. Miscellaneous administrative provisions
- (a) The administrator, subject to the requirements of the Federal Power Act [ 16 U.S.C. 791a et seq.], shall keep complete and accurate accounts of operations, including all funds expended and received in connection with transmission and sale of electric energy generated at the Bonneville project, and in the maintenance of such accounts, appropriate obligations shall be established for annual and sick leave of absence as earned. The Administrator shall, after the close of each fiscal year, obtain an independent commercial-type audit of such accounts. The forms, systems, and procedures prescribed by the Comptroller General for the Administrator’s appropriation and fund accounting shall be in accordance with the requirements of the Federal Power Act with respect to accounts of electric operations of public utilities and the regulations of the Federal Energy Regulatory Commission pursuant thereto.
- (b) The administrator may make such expenditures for offices, vehicles, furnishings, equipment, supplies, and books; for attendance at meetings; and for such other facilities and services as he may find necessary for the proper administration of this chapter.
§ 832i. Employment of personnel
- (a) The Secretary of Energy shall appoint, without regard to the civil-service laws, an Assistant Administrator, chief engineer, and general counsel and shall fix the compensation of each in accordance with chapter 51 and subchapter III of chapter 53 of title 5. The Assistant Administrator shall perform the duties and exercise the powers of the Administrator, in the event of the absence or sickness of the Administrator until such absence or sickness shall cease and in the event of a vacancy in the office of Administrator until a successor is appointed
- (b) The Administrator, the Secretary of the Army, and the Secretary of Energy, respectively, are authorized to appoint, subject to the civil-service laws, such officers and employees as may be necessary to carry out the purposes of this chapter, the appointment of whom is not otherwise provided for, and to fix their compensation in accordance with chapter 51 and subchapter III of chapter 53 of title 5. The Administrator may employ laborers, mechanics, and workmen in connection with construction work or the operation and maintenance of electrical facilities (hereinafter called “laborers, mechanics, and workmen”), subject to the civil-service laws. The Administrator is further authorized to employ physicians, under agreement and without regard to civil-service laws or regulations, to make physical examinations of employees or prospective employees who are or may become laborers, mechanics, and workmen. The Administrator, the Secretary of the Army, and the Secretary of Energy, respectively, are also authorized to appoint, without regard to the civil-service laws, such experts as may be necessary for carrying out the functions entrusted to them under this chapter.
- (c) The Administrator may accept and utilize such voluntary and uncompensated services and with the consent of the agency concerned may utilize such officers, employees, or equipment of any agency of the Federal, State, or local governments which he finds helpful in carrying out the purposes of this chapter; in connection with the utilization of such services, reasonable payments may be allowed for necessary travel and other expenses.
§ 832j. Deposit of receipts; authorization of appropriations
All receipts from transmission and sale of electric energy generated at the Bonneville project shall be covered into the Treasury of the United States to the credit of miscellaneous receipts, save and except that the Treasury shall set up and maintain from such receipts a continuing fund of $500,000, to the credit of the administrator and subject to check by him, to defray emergency expenses and to insure continuous operation. There is authorized to be appropriated from time to time, out of moneys in the Treasury not otherwise appropriated, such sums as may be necessary to carry out the provisions of this chapter, including installation of equipment and machinery for the generation of electric energy and facilities for its transmission and sale.
§ 832k. Authority of Administrator
- (a) The Administrator is authorized to determine, settle, compromise, and pay claims and demands against the United States which are not in excess of $1,000 and are presented to the Administrator in writing within one year from the date of accrual thereof, for any losses, injuries, or damages to persons or property, or for the death of persons, resulting from acts or omissions of employees acting within the scope of their employment pursuant to this chapter. The Administrator is also authorized to determine, compromise, and settle any claims and demands of the United States for any losses, injuries, or damages to property under the Administrator’s control, against other persons or public or private corporations. The Administrator’s determination, compromise, settlement, or payment of any of the claims referred to in this subsection shall be final and conclusive upon all officers of the Government, notwithstanding the provisions of any other Act to the contrary. When claims presented to the Administrator under this subsection arise, in whole or in part, out of any damage done to private property, the Administrator may repair all or any part of such damage in lieu of making such payments.
- (b) The Administrator may, in the name of the United States, under the supervision of the Attorney General, bring such suits at law or in equity as in his judgment may be necessary to carry out the purposes of this chapter; and he shall be represented in the prosecution and defense of all litigation, affecting the status or operation of Bonneville project by the United States attorneys for the districts, respectively, in which such litigation may arise, or by such attorney or attorneys as the Attorney General may designate as authorized by law, in conjunction with the regularly employed attorneys of the Administrator.
§ 832l. Separability
If any provision of this chapter or the application of such provision to any person or circumstance shall be held invalid, the remainder of the chapter and the application of such provision to persons or circumstances other than those as to which it is held invalid shall not be affected thereby.
§ 832m. Sale of excess Federal power; fish and wildlife conservation within Federal Columbia River Power System; residential exchange; personnel flexibility
- (a) In this section:
- (1) The term “Administrator” means the Administrator of the Bonneville Power Administration.
- (2) The term “Council” means the Northwest Power and Conservation Planning Council.
- (3) The term “excess Federal power” means such electric power that has become surplus to the firm contractual obligations of the Administrator under section 839c(f) of this title due to either—
- (A) any reduction in the quantity of electric power that the Administrator is contractually required to supply under subsections (b) and (d) of section 839c of this title , due to the election by customers of the Bonneville Power Administration to purchase electric power from other suppliers, as compared to the quantity of electric power that the Administrator was contractually required to supply as of January 1, 1995 ; or
- (B) those operations of the Federal Columbia River Power System that are primarily for the benefit of fish and wildlife affected by the development, operation, or management of the System.
- (b) Notwithstanding section 837a of this title , subsections (a), (b), and (c) of section 837b of this title , and section 837f of this title , and section 839f(c) of this title , the Administrator may, as permitted by otherwise applicable law, sell or otherwise dispose of excess Federal power—
- (1) outside the Pacific Northwest on a firm basis for a contract term of not to exceed 7 years, if the excess Federal power is first offered for a reasonable period of time and under the same essential rate, terms and conditions to those Pacific Northwest public body, cooperative and investor-owned utilities and those direct service industrial customers identified in subsection (b) or (d)(1)(A) of section 839c of this title ; and
- (2) in any region without the prohibition on resale established by the second sentence of section 832d(a) of this title .
- (c)
- (1) 1 1 So in original. No par. (2) has been enacted. Within 180 days of November 13, 1995 , the Council shall review and report to Congress regarding the most appropriate governance structure to allow more effective regional control over efforts to conserve and enhance anadromous and resident fish and wildlife within the Federal Columbia River Power System.
- (d) The Assistant Secretary of the Army for Civil Works, acting through the North Pacific Division of the Corps of Engineers, is authorized to place orders for goods and services related to facilities for electric power generation and fish and wildlife mitigation associated with the Federal Columbia River Power System with and through the Administrator using the authorities available to the Administrator.
- (e) Notwithstanding the establishment, confirmation and approval of rates pursuant to section 839e of this title , and notwithstanding the provisions of section 839c(c) of this title , the cost benefits of eligible utilities’ total purchase and exchange sales under section 839c(c)(1) of this title shall be $145,000,000 for fiscal year 1997, and the net benefits paid to each eligible electric utility shall be $145,000,000 multiplied by the percentage of the total of such net benefits paid by the Administrator to such utility for fiscal year 1995.
- (f) The Administrator may offer employees voluntary separation incentives as deemed necessary which shall not exceed $25,000. Recipients who accept employment with the United States within five years after separation shall repay the entire amount to the Bonneville Power Administration.
- (g) Unless superseded by an Act of Congress, the authority provided by this section is expressly intended to extend beyond the fiscal year.
§ 833. Completion and maintenance of project; generation of electricity
For the purpose of improving navigation on the Missouri River, and for other purposes incidental thereto, the dam and appurtenant works now under construction at Fort Peck, Montana, and a suitable power plant for the production of hydroelectric power (which dam, power plant, and appurtenant works are hereinafter called Fort Peck project), shall be completed, maintained, and operated under the direction of the Secretary of the Army and the supervision of the Chief of Engineers, subject to the provisions of this chapter relating to the powers and duties of the Bureau of Reclamation (hereinafter called the Bureau), as provided for in section 833a(a) of this title , respecting the transmission and sale of electric energy generated at said project. The Secretary of the Army shall provide, construct, operate, maintain, and improve at Fort Peck project such machinery, equipment, and facilities for the generation of electric energy as the Bureau may deem necessary to develop such electric energy as rapidly as markets may be found therefor. The electric energy thus generated and not required for the operation of the dam at such project and the navigation facilities employed in connection therewith shall be delivered to the Bureau for disposition as provided in this chapter.
§ 833a. Administration of project
- (a) The electric energy generated in the operation of the said Fort Peck project shall be disposed of by the Bureau as hereinafter provided. The Bureau shall exercise the powers and perform the duties provided for in this chapter under the supervision and direction of the Secretary of the Interior in accordance with section 373a of title 43 . The Bureau shall, as hereinafter provided, make all arrangements for the sale and disposition of electric energy generated at the Fort Peck project not required for the operation of the dam at such project and the navigation facilities employed in connection therewith. The form of administration herein established for the Fort Peck project is intended to be provisional pending the establishment of a permanent administration for Fort Peck and other projects in the Missouri River Basin. The Secretary of the Army shall install and maintain additional machinery, equipment, and facilities for the generation of electric energy at the Fort Peck project when in the judgment of the Bureau such additional generating facilities are desirable to meet actual or potential market requirements for such electric energy. The Secretary of the Army shall schedule the operations of the several electrical generating units and appurtenant equipment of the Fort Peck project in accordance with the requirements of the Bureau. The Secretary of the Army shall provide and maintain for the use of the Bureau at said Fort Peck project adequate station space and equipment, including such switches, switchboards, instruments, and dispatching facilities as may be required by the Bureau for proper reception, handling, and dispatching of the electric energy produced at the said project, together with transformers and other equipment required by the Bureau for the transmission of such energy from that place at suitable voltage to the markets which the Bureau desires to serve.
- (b) In order to encourage the widest possible use of all electric energy that can be generated and marketed and to provide reasonable outlets therefor, and to prevent the monopolization thereof by limited groups, the Bureau is authorized and directed to provide, construct, operate, maintain, and improve such electric transmission lines and substations, and facilities and structures appurtenant thereto, as it finds necessary, desirable, or appropriate for the purpose of transmitting electric energy, available for sale, from the Fort Peck project to existing and potential markets, and, for the purpose of interchange of electric energy, to interconnect the Fort Peck project with either private or with other Federal projects and publicly owned power systems now or hereafter constructed.
- (c) The Secretary of the Interior is authorized, in the name of the United States, to acquire, by purchase, lease, condemnation, or donation, such real and personal property, or any interest therein, including lands, easements, rights-of-way, franchises, electric transmission lines, substations, and facilities and structures appurtenant thereto, as he finds necessary or appropriate to carry out the purposes of this chapter. Title to all property and property rights acquired by said Secretary shall be taken in the name of the United States.
- (d) The Secretary of the Interior shall have power to acquire any property or property rights, including patent rights, which in his opinion are necessary to carry out the purposes of this chapter, by purchase, lease, donation, or by the exercise of the right of eminent domain and to institute condemnation proceedings therefor in the same manner as is provided by law for the condemnation of real estate.
- (e) The Secretary of the Interior is authorized, in the name of the United States, to sell, lease, or otherwise dispose of such personal property as in his judgment is not required for the purposes of this chapter and such real property and interests in land acquired in connection with construction or operation of electric transmission lines or substations as in his judgment are not required for the purposes of this chapter.
- (f) Subject to the provisions of this chapter, the Bureau is authorized, in the name of the United States, to negotiate and enter into such contracts, agreements, and arrangements as it shall find necessary or appropriate to carry out the purposes of this chapter.
§ 833b. Definitions
As employed in this chapter, the term “public body,” or “public bodies,” means States, public power districts, counties, and municipalities, including agencies or subdivisions of any thereof. As employed in this chapter, the term “cooperative,” or “cooperatives,” means any form of nonprofit-making organization or organizations of citizens supplying, or which may be created to supply, members with any kind of goods, commodities, or services, as nearly as possible at cost.
§ 833c. Preference to public bodies and cooperatives
In order to insure that the facilities for the generation of electric energy at the Fort Peck project shall be operated for the benefit of the general public, and particularly of domestic and rural consumers, the Bureau shall at all times, in disposing of electric energy generated at said project, give preference and priority to public bodies and cooperatives.
§ 833d. Rate schedules; preparation, approval, and uniformity
Schedules of rates and charges for electric energy produced at the Fort Peck project and sold to purchasers as in this chapter provided shall be prepared by the Bureau and become effective upon confirmation and approval thereof by the Secretary of Energy. Subject to confirmation and approval by the Secretary of Energy, such rate schedules may be modified from time to time by the Bureau and shall be fixed and established with a view to encouraging the widest possible diversified use of electric energy. The said rate schedules may provide for uniform rate or rates uniform throughout prescribed transmission areas in order to extend the benefits of an integrated transmission system and encourage the equitable distribution of the electric energy developed at the Fort Peck project.
§ 833e. Factors in determining rate schedules
It is the intent of Congress that rate schedules for the sale of electric energy which is or may be generated at the Fort Peck project in excess of the amount required for operating the dam and appurtenant works at said project shall be determined with due regard to and predicated upon the fact that such electric energy is developed from water power created as an incident to the construction of the dam in the Missouri River at the Fort Peck project for the purposes set forth in section 833 of this title . Rate schedules shall be drawn having regard to the recovery (upon the basis of the application of such rate schedules to the capacity of the electric facilities of Fort Peck project) of the cost of producing and transmitting such electric energy, including the amortization of the capital investment over a reasonable period of years. Rate schedules shall be based upon an allocation of costs made by the Secretary of Energy. In computing the cost of electric energy developed from water power created as an incident to and a byproduct of the construction of Fort Peck project, the Secretary of Energy may allocate to the costs of electric facilities such a share of the cost of facilities having joint value for the production of electric energy and other purposes as the power development may fairly bear as compared with such other purposes.
§ 833f. Purchase of supplies and services
- (1) an emergency requires immediate delivery of the supplies or performance of the services; or
- (2) repair parts, accessories, supplemental equipment, or services are required for supplies or services previously furnished or contracted for; or
- (3) the aggregate amount involved in any purchase of supplies or procurement of services does not exceed $500; in which cases such purchase of supplies or procurement of services may be made in the open market in the manner common among businessmen. In comparing bids and in making awards, the Bureau or the Secretary of the Army, as the case may be, may consider such factors as relative quality and adaptability of supplies or services, the bidder’s financial responsibility, skill, experience, record of integrity in dealing, and ability to furnish repairs and maintenance services, the time of delivery or performance offered, and whether the bidder has complied with the specifications.
§ 833g. Miscellaneous administrative provisions
- (a) The Bureau, subject to the requirements of the Federal Power Act [ 16 U.S.C. 791a et seq.], shall keep complete and accurate accounts of operations, including all funds expended and received in connection with transmission and sale of electric energy generated at the Fort Peck project.
- (b) The Bureau may make such expenditures for offices, vehicles, furnishings, equipment, supplies, and books; for attendance at meetings; and for such other facilities and services as it may find necessary for the proper administration of this chapter.
§ 833h. Personnel; appointment and compensation
The Secretary of the Interior, the Secretary of the Army, and the Secretary of Energy, respectively, shall appoint such attorneys, engineers, and other experts as may be necessary for carrying out the functions entrusted to them under this chapter, and shall fix the compensation of each of such attorneys, engineers, and other experts; and they may, subject to the civil-service laws, appoint such other officers and employees as may be necessary to carry out such functions and fix their salaries in accordance with chapter 51 and subchapter III of chapter 53 of title 5. In the administration of this chapter the services of regular employees in the Bureau may be utilized and an equitable part of the salaries of such employees whose services are thus utilized may be charged by the Bureau to the operating costs of the power features of the Fort Peck project. The Bureau similarly may utilize and charge for facilities of the Bureau which economically can be used in connection with the administration of this chapter.
§ 833i. Deposit of receipts; establishment of continuing fund; authorization of appropriations
All receipts from transmission and sale of electric energy generated at the Fort Peck project shall be covered into the Treasury of the United States to the credit of miscellaneous receipts, save and except that the Treasury shall set up and maintain from such receipts a continuing fund of $500,000, to the credit of the Bureau and subject to expenditure by it, to defray the operating expense of generation and transmission of power delivered to the Bureau for disposal under this chapter, to defray emergency expenses and to insure continuous operation. There is authorized to be appropriated from time to time, out of moneys in the Treasury not otherwise appropriated, such sums as may be necessary to carry out the provisions of this chapter, including installation of equipment and machinery for the generation of electric energy, and facilities for its transmission and sale.
§ 833j. Suits for and against project; legal representation
The Secretary of the Interior may, in the name of the United States, under the supervision of the Attorney General, bring such suits at law or in equity as in his judgment may be necessary to carry out the purposes of this chapter; and he shall be represented in the prosecution and defense of all litigation affecting the status or operation of the Fort Peck project by the United States attorneys for the districts, respectively, in which such litigation may arise, or by such attorney or attorneys as the Attorney General may designate as authorized by law, in conjunction with the regularly employed attorneys of the Bureau.
§ 833k. Separability
If any provision of this chapter or the application of such provision to any person or circumstances shall be held invalid, the remainder of the chapter and the application of such provisions to persons or circumstances other than those as to which it is held invalid shall not be affected thereby.
§ 833l. Acquisition of Indian lands
In aid of the construction of the Fort Peck project, there is granted to the United States, subject to the provisions of sections 833 l to 833p of this title, such right, title, and interest of the Indians as may be required in and to such tribal and allotted lands as may be designated by the Secretary of the Interior from time to time for the construction, operation, and maintenance of electric transmission lines and other works of the project or for the relocation or reconstruction of properties made necessary by the construction of the project.
§ 833m. Determination of compensation for acquisition of Indian lands; funds payable from; disposition of moneys
As lands or interests in lands are designated from time to time under sections 833 l to 833p of this title, the Secretary of the Interior shall determine the amount of money to be paid to the Indians as just and equitable compensation therefor. The amounts due the tribe and the individual allottees or their heirs or devisees shall be paid from funds now or hereafter made available to the Department of the Interior for the Fort Peck project to the superintendent of the appropriate Indian agency, or such other officer as may be designated by the Secretary of the Interior, for credit on the books of such agency to the accounts of the tribe and the individuals concerned.
§ 833n. Use of deposits by allottees; nontaxability of lands
Funds deposited to the credit of allottees, their heirs, or devisees may be used, in the discretion of the Secretary of the Interior, for the acquisition of other lands and improvements, or the relocation of existing improvements or construction of new improvements on the lands so acquired for the allottees or heirs whose lands and improvements are acquired under the provisions of sections 833 l to 833p of this title. Lands so acquired shall be held in the same status as those from which the funds were derived, and shall be nontaxable until otherwise provided by Congress.
§ 833o. Authority of Secretary of the Interior for acquisition of Indian land
The Secretary of the Interior is authorized to perform any and all acts and to prescribe such regulations as he may deem appropriate to carry out the provisions of sections 833 l to 833p of this title.
§ 833p. Reversion of title
All designations of Indian lands pursuant to sections 833 l to 833p of this title shall be made subject to the condition that in the event any such lands shall no longer be required for the purposes for which they were designated, then the right, title, or interest so acquired in lands so designated shall revert to the United States in trust for the Fort Peck Indian Tribes.
§ 833q. Educational costs of dependents of employees; payments to school districts; reimbursement from continuing fund
Under regulations prescribed by the Secretary of the Army, payments may be made, in advance or otherwise, from any funds available for the Fort Peck project, Montana, to the school district or districts serving that project as reimbursement for educational facilities (including, where appropriate, transportation to and from school) furnished by the said district or districts to pupils who are dependents of persons engaged in the construction, operation, and maintenance of the project and living at or near Fort Peck upon real property of the United States not subject to taxation by State or local agencies and upon which payments in lieu of taxes are not made by the United States, which payments for any school year shall not exceed that part of the cost of operating and maintaining such facilities which the number of pupils aforesaid in average daily attendance during that year bears to the whole number of pupils in average daily attendance at those schools during that year: Provided , That of the whole amount so paid in any fiscal year, the Bureau of Reclamation, Department of the Interior, shall reimburse the Secretary of the Army from the continuing fund provided in section 833i of this title , that part which is properly chargeable as an operation expense incident to the generation and transmission of power delivered to the Bureau under said section.
§ 835. Project authorized; laws applicable
In addition to the primary purposes for which the Grand Coulee Dam project (hereafter to be known as the Columbia Basin project and herein called the “project”) was authorized under the provisions of the Act of August 30, 1935 ( 49 Stat. 1028 ), the project is authorized and reauthorized as a project subject to the Reclamation Project Act of 1939; and the provisions of each of those two Acts together with the provisions of this Act shall govern the repayment of expenditures and the construction, operation, and maintenance of the works constructed as a part of the project.
§§ 835a, 835b. Repealed. Pub. L. 87–728, § 3 , Oct. 1, 1962 , 76 Stat. 678
§ 835c. Duties of Secretary of the Interior
- (a) For the purposes of assisting in the permanent settlement of farm families, protecting project land, and facilitating project development, the Secretary is authorized to administer public lands of the United States in the project area and lands acquired under this section; to sell, exchange, or lease such lands; to dedicate portions of such lands for public purposes in keeping with sound project development; to acquire in the name of the United States, at prices satisfactory to him, such lands or interests in lands, within or adjacent to the project area, as he deems appropriate for the protection, development, or improvement of the project; and to accept donations of real and personal property for the purposes of this Act. Any moneys realized on account of donations for purposes of this Act shall be covered into the Treasury as trust funds.
- (b) Contracts, exchanges, and leases made under this section shall be on terms that, in the Secretary’s judgment, are in keeping with sound project development. In addition, land sale and exchange contracts shall be on a basis that, in the Secretary’s judgment, provides for the return, in a reasonable period of years, of not less than the appraised value of the land and improvements thereon. Qualification of applicants for the purchase of land for irrigation farming shall be prescribed as provided in section 433 of title 43 , notwithstanding any other provisions of law. No farm unit shall be sold to, and no contract to sell a farm unit shall be entered into with, any person, corporation, or joint-stock association which has theretofore purchased or entered into a contract to purchase a farm unit from the United States on the Columbia Basin project. The foregoing provisions of this subsection shall apply only to the sale of farm units which are suitable for settlement purposes. Farm units which, in the opinion of the Secretary, are not suitable for settlement purposes may be sold with a preference to resident project landowners as supplemental units, subject to the applicable irrigable acreage limitations on the delivery of water, but the purchasers thereof shall not be entitled to benefits of the Act of August 13, 1953 ( 67 Stat. 566 ) [ 43 U.S.C. 451 et seq.] with respect thereto.
§ 835d. Acquisition of Indian lands, Spokane and Colville Reservations
- (a) all the right, title, and interest of the Indians in and to the tribal and allotted lands within the Spokane and Colville Reservations, including sites of agency and school buildings and related structures and unsold lands in the Klaxta town site, as may be designated therefor by the Secretary of the Interior from time to time: Provided , That no lands shall be taken for reservoir purposes above the elevation of one thousand three hundred and ten feet above sea level as shown by Bureau of Land Management surveys, except in Klaxta town site and except where in the judgment of the Secretary of the Interior, special circumstances concerning the reservoir or its operation and maintenance require the taking of land above that elevation; and
- (b) such other interests in or to any such lands and property within these reservations as may be required and as may be designated by the Secretary of the Interior from time to time for the construction of pipe lines, highways, railroads, telegraph, telephone, and electric-transmission lines in connection with the project, or for the relocation or reconstruction of such facilities made necessary by the construction of the project. The Secretary of the Interior, in lieu of reserving rights of hunting, fishing, and boating to the Indians in the areas granted under this section and sections 835e to 835h of this title, shall set aside approximately one-quarter of the entire reservoir area for the paramount use of the Indians of the Spokane and Colville Reservations for hunting, fishing, and boating purposes, which rights shall be subject only to such reasonable regulations as the Secretary may prescribe for the protection and conservation of fish and wildlife: Provided , That the exercise of the Indians’ rights shall not interfere with project operations. The Secretary shall also, where necessary, grant to the Indians reasonable rights of access to such area or areas across any project lands.
§ 835e. Payment for lands acquired from Spokane and Colville Reservations
As lands or interests in lands are designated from time to time under sections 835d to 835h of this title, the Secretary of the Interior shall determine the amount of money to be paid to the Indians as just and equitable compensation therefor. As to the tribal lands, the amounts so determined shall be transferred in the Treasury of the United States from the funds now or hereafter made available for the construction of the Columbia Basin project to the credit of the appropriate tribe pursuant to the provisions of section 155 of title 25 . The amounts due individual landowners or their heirs or devisees shall be paid from funds now or hereafter made available for the construction of said project to the superintendent of the Colville Indian Agency or such other officer as shall be designated by the Secretary of the Interior for credit on the books of said agency to the accounts of the individuals concerned.
§ 835f. Use of funds deposited to allottees; land and improvements
Funds deposited to the credit of allottees, their heirs or devisees may be used in the discretion of the Secretary of the Interior, for the acquisition of other lands and improvements, or the relocation of existing improvements or construction of new improvements on the lands so acquired for the allottees or heirs whose lands and improvements are acquired under the provisions of sections 835d to 835h of this title. Lands so acquired shall be held in the same status as those from which the funds were derived, and shall be nontaxable until otherwise provided by Congress.
§ 835g. Relocation of Indian cemeteries
As to any Indian cemetery lands required for the project, the Secretary of the Interior is authorized, in his discretion, in lieu of requiring payment therefor, to establish cemeteries on other lands that he may select and acquire for the purpose, and to remove bodies, markers, and other appurtenances to the new sites. All costs incurred in connection with any such relocation shall be paid from moneys appropriated for the project. All right, title, and interest of the Indians in the lands within any cemetery so relocated shall terminate and the grant of title under sections 835d to 835h of this title take effect as of the date the Secretary of the Interior authorizes the relocation. Sites of the relocated cemeteries shall be held in trust by the United States for the Spokane or Colville Tribe, as the case may be, and shall be nontaxable.
§ 835h. Acts and regulations by Secretary of the Interior
The Secretary of the Interior is authorized to perform any and all acts and to prescribe such regulations as he may deem appropriate to carry out the provisions of sections 835d to 835g of this title.
§ 835i. Contracts with State of Washington for maintenance and operation of fish hatcheries
In connection with fish hatcheries built or to be built as a part of the fish-protection program required on the Columbia Basin Dam project, the Secretary of the Interior is authorized to contract with the State of Washington for the maintenance and operation of any of them at the expense of said State.
§ 835j. Projects marketing commercial power and energy; consolidated financial statement to President and Congress; adjustment of rates to assure return of reimbursable construction costs within prescribed period
The Secretary of the Interior shall prepare, maintain, and present annually to the President and the Congress a consolidated financial statement for all projects heretofore or hereafter authorized, including the third powerplant at Grand Coulee Dam, from or by means of which commercial power and energy is marketed through the facilities of the Federal Columbia River power system and for all other projects associated therewith to the extent that the costs of these projects are required by law to be charged to and returned from net revenues derived from the power and energy, or any power and energy, so marketed, and he shall, if said consolidated statement indicates that the reimbursable construction costs of the projects, or any of the projects, covered thereby which are chargeable to and returnable from the commercial power and energy so marketed are likely not to be returned within the period prescribed by law, take prompt action to adjust the rates charged for such power and energy to the extent necessary to assure such return.
§ 835k. Return of construction costs from marketing revenues in event of inability of irrigation water users to repay within repayment period and lack of other sources of revenue
Subject to the provisions of section 835 l of this title, that portion of the construction cost of any project hereafter authorized to be constructed, operated, and maintained by the Secretary of the Interior under the Federal reclamation laws (Act of June 17, 1902 , 32 Stat. 388 , and Acts amendatory thereof or supplementary thereto) within the Pacific Northwest which, though allocated to irrigation, is beyond the ability of the irrigation water users to repay within the repayment period prescribed by law for that project and cannot be returned within the same period from other project sources of revenue shall be charged to and returned within that period from net revenues derived from the marketing of commercial power and energy through the Federal Columbia River power system, unless otherwise provided by law. As used in this section, the term “Pacific Northwest” has the meaning ascribed to it in section 837 of this title .
§ 835l. Congressional declaration of financial policy; limitations on assistance; analyses and studies; “net revenues” defined
- (1) all costs allocated to power at projects in the Pacific Northwest then existing or authorized, including the cost of acquiring power by purchase or exchange, and
- (2) presently authorized assistance from power to irrigation at projects in the Pacific Northwest existing and authorized prior to September 7, 1966 .
§ 835m. Recommendations for changes in limitations on financial assistance; time and frequency of submission
On December 20, 1974 , and thereafter at intervals coinciding with anniversary dates of Federal Energy Regulatory Commission general review of the rates and charges of the Bonneville Power Administration, the Secretary of the Interior shall recommend to the Congress any changes in the dollar limitations herein placed upon financial assistance to Pacific Northwest reclamation projects that he believes justified by changes in the cost-price levels existing on July 1, 1966 , or by other relevant changes of circumstances.
§ 836. Authorization to license construction and operation; licensing conditions
- (a) The Federal Energy Regulatory Commission is expressly authorized and directed to issue a license to the Power Authority of the State of New York for the construction and operation of a power project with capacity to utilize all of the United States share of the water of the Niagara River permitted to be used by international agreement.
- (b) The Federal Energy Regulatory Commission shall include among the licensing conditions, in addition to those deemed necessary and required under the terms of the Federal Power Act [ 16 U.S.C. 791a et seq.], the following:
- (1) In order to assure that at least 50 per centum of the project power shall be available for sale and distribution primarily for the benefit of the people as consumers, particularly domestic and rural consumers, to whom such power shall be made available at the lowest rates reasonably possible and in such manner as to encourage the widest possible use, the licensee in disposing of 50 per centum of the project power shall give preference and priority to public bodies and nonprofit cooperatives within economic transmission distance. In any case in which project power subject to the preference provisions of this paragraph is sold to utility companies organized and administered for profit, the licensee shall make flexible arrangements and contracts providing for the withdrawal upon reasonable notice and fair terms of enough power to meet the reasonably foreseeable needs of the preference customers.
- (2) The licensee shall make a reasonable portion of the project power subject to the preference provisions of paragraph (1) of this subsection available for use within reasonable economic transmission distance in neighboring States, but this paragraph shall not be construed to require more than 20 per centum of the project power subject to such preference provisions to be made available for use in such States. The licensee shall cooperate with the appropriate agencies in such States to insure compliance with this requirement. In the event of disagreement between the licensee and the power-marketing agencies of any of such States, the Federal Energy Regulatory Commission may, after public hearings, determine and fix the applicable portion of power to be made available and the terms applicable thereto: Provided , That if any such State shall have designated a bargaining agency for the procurement of such power on behalf of such State, the licensee shall deal only with such agency in that State. The arrangements made by the licensee for the sale of power to or in such States shall include observance of the preferences in paragraph (1) of this subsection.
- (3) The licensee shall contract, with the approval of the Governor of the State of New York, pursuant to the procedure established by New York law, to sell to the licensee of Federal Energy Regulatory Commission project 16 for a period ending not later than the final maturity date of the bonds initially issued to finance the project works herein specifically authorized, four hundred and forty-five thousand kilowatts of the remaining project power, which is equivalent to the amount produced by project 16 prior to June 7, 1956 , for resale generally to the industries which purchased power produced by project 16 prior to such date, or their successors, in order as nearly as possible to restore low power costs to such industries and for the same general purposes for which power from project 16 was utilized: Provided , That the licensee of project 16 consents to the surrender of its license at the completion of the construction of such project works upon terms agreed to by both licensees and approved by the Federal Energy Regulatory Commission which shall include the following: (a) the licensee of project 16 shall waive and release any claim for compensation or damages from the Power Authority of the State of New York or from the State of New York, except just compensation for tangible property and rights-of-way actually taken, and (b) without limiting the generality of the foregoing, the licensee of project 16 shall waive all claims to compensation or damages based upon loss of or damage to riparian rights, diversionary rights, or other rights relating to the diversion or use of water, whether founded on legislative grant or otherwise.
- (4) The licensee shall, if available on reasonable terms and conditions, acquire by purchase or other agreement, the ownership or use of, or if unable to do so, construct such transmission lines as may be necessary to make the power and energy generated at the project available in wholesale quantities for sale on fair and reasonable terms and conditions to privately owned companies, to the preference customers enumerated in paragraph (1) of this subsection, and to the neighboring States in accordance with paragraph (2) of this subsection.
- (5) In the event project power is sold to any purchaser for resale, contracts for such sale shall include adequate provisions for establishing resale rates, to be approved by the licensee, consistent with paragraphs (1) and (3) of this subsection.
- (6) The licensee, in cooperation with the appropriate agency of the State of New York which is concerned with the development of parks in such State, may construct a scenic drive and park on the American side of the Niagara River, near the Niagara Falls, pursuant to a plan the general outlines of which shall be approved by the Federal Energy Regulatory Commission; and the cost of such drive and park shall be considered a part of the cost of the power project and part of the licensee’s net investment in said project: Provided , That the maximum part of the cost of such drive and park to be borne by the power project and to be considered a part of the licensee’s net investment shall not exceed $15,000,000.
- (7) The licensee shall pay to the United States and include in its net investment in the project herein authorized the United States share of the cost of the construction of the remedial works, including engineering and economic investigations, undertaken in accordance with article II of the treaty between the United States of America and Canada concerning uses of the waters of the Niagara River signed February 27, 1950 , whenever such remedial works are constructed.
§ 836a. Rules governing issuance of license
The license issued under the terms of this chapter shall be granted in conformance with Rules of Practice and Procedure of the Federal Energy Regulatory Commission, but in the event of any conflict, the provisions of this chapter shall govern in respect of the project herein authorized.
§ 837. Definitions
As used in this chapter—
- (a) “Secretary” means the Secretary of Energy.
- (b) “Pacific Northwest” means (1) the region consisting of the States of Oregon and Washington, the State of Montana west of the Continental Divide, and such portions of the States of Nevada, Utah, and Wyoming within the Columbia drainage basin and of the State of Idaho as the Secretary may determine to be within the marketing area of the Federal Columbia River power system, and (2) any contiguous areas, not in excess of seventy-five airline miles from said region, which are a part of the service area of a rural electric cooperative served by the Administrator on December 5, 1980 , which has a distribution system from which it serves both within and without said region.
- (c) “Surplus energy” means electric energy generated at Federal hydroelectric plants in the Pacific Northwest which would otherwise be wasted because of the lack of a market therefor in the Pacific Northwest at any established rate.
- (d) “Surplus peaking capacity” means electric peaking capacity at Federal hydroelectric plants in the Pacific Northwest for which there is no demand in the Pacific Northwest at any established rate.
- (e) “Non-Federal utility” means any utility not owned or controlled by the United States, including any entity (1) which such a utility owns or controls, in whole or in part, or is controlled by, (2) which is controlled by those controlling such utility, or (3) of which such utility is a member.
- (f) “Energy requirements of any Pacific Northwest customer” means the full requirements for electric energy of (1) any purchaser from the United States for direct consumption in the Pacific Northwest, and (2) any non-Federal utility in that region in excess of (i) the hydroelectric energy available for its own use from its generating plants in the Pacific Northwest, and (ii) any additional energy available for use in the Pacific Northwest which, under a then existing contract, the utility (A) can obtain at no higher incremental cost than the rate charged by the United States, or (B) is required to accept.
- (g) Terms not defined herein shall, unless the context requires otherwise, have the meaning given them in the March 1949 Glossary of Important Power and Rate Terms prepared under the supervision of the Federal Power Commission.
§ 837a. Limitation of sale, delivery, and exchange of electric energy and electric peaking capacity for use outside Pacific Northwest to surplus energy and surplus peaking capacity; notice to customers; inspection of contract drafts
Subject to the provisions of this chapter, the sale, delivery, and exchange of electric energy generated at, and peaking capacity of, Federal hydroelectric plants in the Pacific Northwest for use outside the Pacific Northwest shall be limited to surplus energy and surplus peaking capacity. At least 30 days prior to the execution of any contract for the sale, delivery, or exchange of surplus energy or surplus peaking capacity for use outside the Pacific Northwest, the Secretary shall give the then customers of the Bonneville Power Administration written notice that negotiations for such a contract are pending, and thereafter, at any customer’s request, make available for its inspection current drafts of the proposed contract.
§ 837b. Contract terms and conditions for use of electric energy outside Pacific Northwest
- (a) Any contract for the sale or exchange of surplus energy for use outside the Pacific Northwest, or as replacement, directly or indirectly, within the Pacific Northwest for hydroelectric energy delivered for use outside that region by a non-Federal utility, shall provide that the Secretary, after giving the purchaser notice not in excess of sixty days, will not deliver electric energy under such contract whenever it can reasonably be foreseen that such delivery would impair his ability to meet, either at or after the time of such delivery, the energy requirements of any Pacific Northwest customer. The purchaser shall obligate himself not to take delivery of or use any such energy to supply any load under such conditions that discontinuance of deliveries from the Pacific Northwest in sixty days would cause undue hardship to the purchaser or in his territory, and, further, the purchaser shall acknowledge full responsibility if any such hardship occurs. Deliveries by a non-Federal utility from its generating plants in the Pacific Northwest for use on its own distribution system in an area outside but contiguous to the Pacific Northwest (not including any extension of its outside service area by merger or acquisition after August 31, 1964 ) shall not be deemed deliveries by such utility for use outside the Pacific Northwest.
- (b) Electric energy generated at Federal hydroelectric plants in the Pacific Northwest which can be conserved, for which there is no immediate demand in the Pacific Northwest at any established rate, but for which the Secretary determines there may be a demand in meeting the future requirements of the Pacific Northwest, may be delivered for use outside that region only on a provisional basis under contracts providing that if the Secretary determines at a subsequent time that, by virtue of prior deliveries under such contract, the Secretary is or will be unable to meet the energy requirements of any Pacific Northwest customer, the purchaser will return the full amount of energy delivered to him, or such portion or portions thereof as may be required, at such time or times as may be specified by the Secretary, except that the Secretary shall not require return during the purchaser’s daily peak periods. The Secretary shall require the return of the energy provisionally delivered hereunder, to such extent and at such times, as may be necessary to meet demands at any established rate for use within the Pacific Northwest.
- (c) Any contract for the disposition of surplus peaking capacity shall provide that (1) the Secretary may terminate the contract upon notice not in excess of sixty months, and (2) the purchaser shall advance or return the energy necessary to supply the peaking capacity, except that the Secretary shall not require such advance or return during the purchaser’s daily peak periods. The Secretary may contract for the sale of such energy to the purchaser, in lieu of its return, under the conditions prescribed in subsection (a) of this section.
- (d) The Secretary, in making any determination of the energy requirements of any Pacific Northwest customer which is a non-Federal utility having hydroelectric generating facilities, shall exclude any amounts of hydroelectric energy generated in the Pacific Northwest and disposed of outside the Pacific Northwest by the utility which, through reasonable measures, could have been conserved or otherwise kept available for the utility’s own needs in the Pacific Northwest. The Secretary may sell the utility as a replacement therefor only what would otherwise be surplus energy.
§ 837c. Contract limitations and conditions for use of electric energy and peaking capacity of plants in other marketing areas for use within Pacific Northwest
Any contract of the Secretary for the sale or exchange of electric energy generated at, or peaking capacity of, Federal hydroelectric plants in marketing areas outside the Pacific Northwest for use within the Pacific Northwest shall be subject to limitations and conditions corresponding to those provided in sections 837a and 837b of this title for any contract for the sale or exchange of hydroelectric energy or peaking capacity generated within the Pacific Northwest for use outside the Pacific Northwest.
§ 837d. Exchange contracts
- (1) surplus energy during the Pacific Northwest storage refill period,
- (2) any hydroelectric energy during the Pacific Northwest storage refill period which will be returned to the Pacific Northwest in equal amounts during the same Pacific Northwest refill period or the succeeding storage drawdown period,
- (3) any hydroelectric energy which will be returned to the Pacific Northwest in equal amounts during the same Pacific Northwest storage drawdown period,
- (4) hydroelectric peaking capacity, or
- (5) surplus peaking capacity for energy. All benefits from such exchanges, including resulting increases of firm power, shall be shared equitably by the areas involved, having regard to the secondary energy and other contributions made by each.
§ 837e. Transmission lines for other electric energy; rates
Any capacity in Federal transmission lines connecting, either by themselves or with non-Federal lines, a generating plant in the Pacific Northwest or Canada with the other area or with any other area outside the Pacific Northwest, which is not required for the transmission of Federal energy or the energy described in section 837h of this title , shall be made available as a carrier for transmission of other electric energy between such areas. The transmission of other electric energy shall be at equitable rates determined by the Secretary, but such rates shall be subject to equitable adjustment at appropriate intervals not less frequently than once in every five years as agreed to by the parties. No contract for the transmission of non-Federal energy on a firm basis shall be affected by any increase, subsequent to the execution of such contract, in the requirements for transmission of Federal energy, the energy described in section 837h of this title , or other electric energy.
§ 837f. Purchaser priority on Pacific Northwest power; amendment of existing contracts and new contracts to include priority provisions
The Secretary shall offer to amend, without imposing any other requirements as a condition to such amendment, all existing contracts for the sale or exchange of electric power generated at Federal hydroelectric plants in the Pacific Northwest to include, and shall include in all new contracts, provisions giving the purchaser priority on electric power generated at such plants in conformity with the provisions of this chapter.
§ 837g. Transmission lines between Pacific Northwest and Pacific Southwest; prohibition against construction of lines or related facilities; exceptions of lines and facilities recommended by Secretary or authorized by Congress; authority of Secretary to construct other transmission lines unaffected
No electric transmission lines or related facilities shall be constructed by any Federal agency outside the Pacific Northwest for the purpose of transmitting electric energy between the Pacific Northwest and Pacific Southwest, nor shall any arrangement for transmission capacity be executed by any Federal agency for the purpose of financing such lines and related facilities to be constructed by non-Federal entities, except those lines and facilities recommended for Federal construction in the Report of the Secretary of the Interior submitted to Congress on June 24, 1964 , as supplemented on July 27, 1964 , or as hereafter specifically authorized by Congress: Provided , That, except with respect to electric transmission lines and related facilities for the purpose of transmitting electric energy between the two regions above mentioned, nothing herein shall be construed as expanding or diminishing in any way the present authority of the Secretary of Energy to construct transmission lines to market power and energy.
§ 837h. Provisions not applicable to Canyon Ferry project or benefits and exchanges under Treaty between Canada and United States; preference of power users in Montana not modified
The provisions of this chapter shall not be applicable to (1) the Canyon Ferry project and (2), except as provided in section 837e of this title , downstream power benefits to which Canada is entitled under the treaty between Canada and the United States relating to the cooperative development of the water resources of the Columbia River Basin, signed at Washington, January 17, 1961 , nor to energy or capacity disposed of to Canada in any exchange pursuant to paragraph 1 or 2 of article VIII thereof. Nothing in this chapter shall be construed to modify the geographical preference of power users in the State of Montana which is established by the Hungry Horse Dam Act (Act of June 4, 1944 , 58 Stat. 270 ), as amended.
§ 838. Congressional findings; authority and duties of Secretary of Energy relating to Federal Columbia River Power System unaffected
- (a) Congress finds that in order to enable the Secretary of Energy to carry out the policies of Public Law 88–552 [ 16 U.S.C. 837 et seq.] relating to the marketing of electric power from hydroelectric projects in the Pacific Northwest, Public Laws 89–448 and 89–561 relating to use of revenues of the Federal Columbia River Power System to provide financial assistance to reclamation projects in the Pacific Northwest, the treaty between the United States and Canada relating to the cooperative development of the resources of the Columbia River Basin, and other applicable law, it is desirable and appropriate that the revenues of the Federal Columbia River Power System and the proceeds of revenue bonds be used to further the operation, maintenance, and further construction of the Federal transmission system in the Pacific Northwest.
- (b) Other than as specifically provided herein, the present authority and duties of the Secretary of Energy relating to the Federal Columbia River Power System shall not be affected by this chapter. The authority and duties of the Administrator referred to herein are subject to the supervision and direction of the Secretary.
§ 838a. Definitions
As used in this chapter—
- (a) The term “Administrator” means the Administrator, Bonneville Power Administration.
- (b) The term “electric power” means electric peaking capacity or electric energy, or both.
- (c) The term “major transmission facilities” means transmission facilities intended to be used to provide services not previously provided by the Bonneville Power Administration with its own facilities.
§ 838b. Operation and maintenance of Federal transmission system; construction of improvements, betterments, additions and replacements; criteria
The Secretary of Energy, acting by and through the Administrator, shall operate and maintain the Federal transmission system within the Pacific Northwest and shall construct improvements, betterments, and additions to and replacements of such system within the Pacific Northwest as he determines are appropriate and required to:
- (a) integrate and transmit the electric power from existing or additional Federal or non-Federal generating units;
- (b) provide service to the Administrator’s customers;
- (c) provide interregional transmission facilities; or
- (d) maintain the electrical stability and electrical reliability of the Federal system: Provided, however , That the Administrator shall not construct any transmission facilities outside the Pacific Northwest, excepting customer service facilities within any contiguous areas, not in excess of seventy-five airline miles from said region, which are a part of the service area of a distribution cooperative which has (i) no generating facilities, and (ii) a distribution system from which it serves both within and without said region, nor shall he commence construction of any major transmission facility within the Pacific Northwest, unless the expenditure of the funds for the initiation of such construction is specifically approved by Act of Congress.
§ 838c. Acquisition by condemnation of transmission facilities
- (a) Unless specifically authorized by Act of Congress, the Administrator shall not expend funds made available under this chapter, other than funds specifically appropriated by the Congress for such purpose, to acquire any operating transmission facility by condemnation: Provided , That this provision shall not restrict the acquisition of the right to cross such a facility by condemnation.
- (b) At least sixty days prior to the time a request for approval or authority under this section or section 838b of this title is sent to Congress, the Administrator shall give notice of such request to entities in the Pacific Northwest with which the Administrator has power sales or exchange contracts or transmission contracts or which have a transmission interconnection with the Federal transmission system.
§ 838d. Transmission of non-Federal power
The Administrator shall make available to all utilities on a fair and nondiscriminatory basis, any capacity in the Federal transmission system which he determines to be in excess of the capacity required to transmit electric power generated or acquired by the United States.
§ 838e. Acquisition of property
Subject to the provisions of section 838c of this title the Administrator may purchase or lease or otherwise acquire and hold such real and personal property in the name of the United States as he deems necessary or appropriate to carry out his duties pursuant to law.
§ 838f. Marketing of Federal power; sales agent
The Administrator is hereby designated as the marketing agent for all electric power generated by Federal generating plants in the Pacific Northwest, constructed by, under construction by, or presently authorized for construction by the Bureau of Reclamation or the United States Corps of Engineers except electric power required for the operation of each Federal project and except electric power from the Green Springs project of the Bureau of Reclamation.
§ 838g. Schedules of rates and charges for sale of Federal power and transmission of non-Federal power; confirmation and approval; criteria for modification and establishment
- (1) with a view to encouraging the widest possible diversified use of electric power at the lowest possible rates to consumers consistent with sound business principles,
- (2) having regard to the recovery (upon the basis of the application of such rate schedules to the capacity of the electric facilities of the projects) of the cost of producing and transmitting such electric power, including the amortization of the capital investment allocated to power over a reasonable period of years and payments provided for in section 838i(b)(9) of this title , and
- (3) at levels to produce such additional revenues as may be required, in the aggregate with all other revenues of the Administrator, to pay when due the principal of, premiums, discounts, and expenses in connection with the issuance of and interest on all bonds issued and outstanding pursuant to this chapter, and amounts required to establish and maintain reserve and other funds and accounts established in connection therewith.
§ 838h. Uniform schedules of rates and charges for sale of Federal power and transmission of non-Federal power; allocation of cost recovery
The said schedules of rates and charges for transmission, the said schedules of rates and charges for the sale of electric power, or both such schedules, may provide, among other things, for uniform rates or rates uniform throughout prescribed transmission areas. The recovery of the cost of the Federal transmission system shall be equitably allocated between Federal and non-Federal power utilizing such system.
§ 838i. Bonneville Power Administration fund
- (a) There is hereby established in the Treasury of the United States a Bonneville Power Administration fund (hereinafter referred to as the “fund”). The fund shall consist of (1) all receipts, collections, and recoveries of the Administrator in cash from all sources, including trust funds, (2) all proceeds derived from the sale of bonds by the Administrator, (3) any appropriations made by the Congress for the fund, and (4) the following funds which are hereby transferred to the Administrator: (i) all moneys in the special account in the Treasury established pursuant to Executive Order Numbered 8526 dated August 26, 1940 , (ii) the unexpended balances in the continuing fund established by the provisions of section 832j of this title , and (iii) the unexpended balances of funds appropriated or otherwise made available for the Bonneville Power Administration. All funds transferred hereunder shall be available for expenditure by the Secretary of Energy, acting by and through the Administrator, as authorized in this chapter and any other Act relating to the Federal Columbia River transmission system, subject to such limitations as may be prescribed by any applicable appropriation act effective during such period as may elapse between their transfer and the approval by the Congress of the first subsequent annual budget program of the Administrator.
- (b) The Administrator may make expenditures from the fund, which shall have been included in his annual budget submitted to Congress, without further appropriation and without fiscal year limitation, but within such specific directives or limitations as may be included in appropriation acts, for any purpose necessary or appropriate to carry out the duties imposed upon the Administrator pursuant to law, including but not limited to—
- (1) construction, acquisition, and replacement of (i) the transmission system, including facilities and structures appurtenant thereto, and (ii) additions, improvements, and betterments thereto (hereinafter in this chapter referred to as “transmission system”);
- (2) operation, maintenance, repair, and relocation, to the extent such relocation is not provided for under subsection (1) above, of the transmission system;
- (3) electrical research, development, experimentation, test, and investigation related to construction, operation, and maintenance of transmission systems and facilities;
- (4) marketing of electric power;
- (5) transmission over facilities of others and rental, lease, or lease-purchase of facilities;
- (6) purchase of electric power (including the entitlement of electric plant capability) (i) on a short-term basis to meet temporary deficiencies in electric power which the Administrator is obligated by contract to supply, or 1 1 So in original. The word “or” probably should not appear. (ii) if such purchase has been heretofore authorized or is made with funds expressly appropriated for such purchase by the Congress, (iii) if to be paid for with funds provided by other entities for such purpose under a trust or agency arrangement, or (iv) on a short term basis to meet the Administrator’s obligations under section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act [ 16 U.S.C. 839b(h) ];
- (7) defraying emergency expenses or insuring continuous operation;
- (8) paying the interest on, premiums, discounts, and expenses, if any, in connection with the issuance of, and principal of all bonds issued under section 838k(a) of this title , including provision for and maintenance of reserve and other funds established in connection therewith;
- (9) making such payments to the credit of the reclamation fund or other funds as are required by or pursuant to law to be made into such funds in connection with reclamation projects in the Pacific Northwest: Provided , That this clause shall not be construed as permitting the use of revenues for repayment of costs allocated to irrigation at any project except as otherwise expressly authorized by law;
- (10) making payments to the credit of miscellaneous receipts of the Treasury for all unpaid costs required by or pursuant to law to be charged to and returned to the general fund of the Treasury for the repayment of the Federal investment in the Federal Columbia River Power System from electric power marketed by the Administrator;
- (11) acquiring such goods and services, and paying dues and membership fees in such professional, utility, industry, and other societies, associations, and institutes, together with expenses related to such memberships, including but not limited to the acquisitions and payments set forth in the general provisions of the annual appropriations Act for the Department of Energy, as the Administrator determines to be necessary or appropriate in carrying out the purposes of this chapter; and
- (12) making such payments, as shall be required to carry out the purposes and provisions of the Pacific Northwest Electric Power Planning and Conservation Act [ 16 U.S.C. 839 et seq.].
- (c) Moneys heretofore or hereafter appropriated shall be used only for the purposes for which appropriated, and moneys received by the Administrator in trust shall be used only for carrying out such trust. The provisions of chapter 91 of title 31 shall be applicable to the Administrator in the same manner as they are applied to the wholly owned Government corporations named in section 9101 of title 31 , but nothing in section 9105(d) 2 2 See References in Text note below. of title 31 shall be construed as affecting the powers granted in subsection (b)(11) of this section and in sections 832a(f), 832i(b), and 832k(a) of this title.
- (d) Notwithstanding the provisions of sections 9105 and 9106 of title 31, the financial transactions of the Administrator shall be audited by the Comptroller General at such times and to such extent as the Comptroller General deems necessary, and reports of the results of each such audit shall be made to the Congress within 6½ months following the end of the fiscal year covered by the audit.
§ 838j. Investment of excess moneys; deposit of moneys
- (a) If the Administrator determines that moneys in the fund are in excess of current needs he may request the investment of such amounts as he deems advisable by the Secretary of the Treasury in direct, general obligations of, or obligations guaranteed as to both principal and interest by, the United States of America.
- (b) With the approval of the Secretary of the Treasury, the Administrator may deposit moneys of the fund in any Federal Reserve bank or other depository for funds of the United States of America, or in such other banks and financial institutions and under such terms and conditions as the Administrator and the Secretary of the Treasury may mutually agree.
§ 838k. Bonneville Power Administration bonds
- (a) The Administrator is authorized to issue and sell to the Secretary of the Treasury from time to time in the name and for and on behalf of the Bonneville Power Administration bonds, notes, and other evidences of indebtedness (in this chapter collectively referred to as “bonds”) to assist in financing the construction, acquisition, and replacement of the transmission system, to implement the Administrator’s authority pursuant to the Pacific Northwest Electric Power Planning and Conservation Act [ 16 U.S.C. 839 et seq.] (including his authority to provide financial assistance for conservation measures, renewable resources, and fish and wildlife, but not including the authority to acquire under section 6 of that Act [ 16 U.S.C. 839d ] electric power from a generating facility having a planned capability greater than 50 average megawatts), and to issue and sell bonds to refund such bonds. Such bonds shall be in such forms and denominations, bear such maturities, and be subject to such terms and conditions as may be prescribed by the Secretary of the Treasury taking into account terms and conditions prevailing in the market for similar bonds, the useful life of the facilities for which the bonds are issued, and financing practices of the utility industry. Refunding provisions may be prescribed by the Administrator. Such bonds shall bear interest at a rate determined by the Secretary of the Treasury taking into consideration the current average market yield on outstanding marketable obligations of the United States of comparable maturities, plus an amount in the judgment of the Secretary of the Treasury to provide for a rate comparable to the rates prevailing in the market for similar bonds issued by Government corporations. Beginning in fiscal year 1982, if the Administrator fails to repay by the end of any fiscal year all of the amounts projected immediately prior to such year to be repaid to the Treasury by the end of such year under the repayment criteria of the Secretary of Energy and if such failure is due to reasons other than (A) a decrease in power sale revenues due to fluctuating streamflows or (B) other reasons beyond the control of the Administrator, the Secretary of the Treasury may increase the interest rate applicable to the outstanding bonds issued by the Administrator during such fiscal year. Such increase shall be effective commencing with the fiscal year immediately following the fiscal year during which such failure occurred and shall not exceed 1 per centum for each such fiscal year during which such repayments are not in accord with such criteria. The Secretary of the Treasury shall take into account amounts that the Administrator has repaid in advance of any repayment criteria in determining whether to increase such rate. Before such rate is increased, the Secretary of the Treasury, in consultation with the Administrator and the Federal Energy Regulatory Commission, must be satisfied that the Administrator will have the ability to pay such increased rate, taking into account the Administrator’s obligations. Such increase shall terminate with the fiscal year in which repayments (including repayments of the increased rate) are in accordance with the repayment criteria of the Secretary of Energy. The aggregate principal amount of any such bonds outstanding at any one time shall not exceed $1,250,000,000 prior to October 1, 1981 . Such aggregate principal limitation shall be increased by an additional $1,250,000,000 after October 1, 1981 , as provided in advance in annual appropriation Acts, and such increased amount shall be reserved for the purpose of providing funds for conservation and renewable resource loans and grants in a special revolving account created therefor in the Fund. The funds from such revolving account shall not be deemed State or local funds.
- (b) The principal of, premiums, if any, and interest on such bonds shall be payable solely from the Administrator’s net proceeds as hereinafter defined. “Net proceeds” shall mean for the purposes of this section the remainder of the Administrator’s gross receipts from all sources after first deducting trust funds and the costs listed in section 838i(b)(2) through (b)(7), (b)(11), and (b)(12) of this title, and shall include reserve or other funds created from such receipts.
- (c) The Secretary of the Treasury shall purchase forthwith any bonds issued by the Administrator under this chapter and for that purpose is authorized to use as a public debt transaction the proceeds from the sale of any securities issued under chapter 31 of title 31, as now or hereafter in force, and the purposes for which securities may be issued under chapter 31 of title 31, as now or hereafter in force, are extended to include any purchases of the bonds issued by the Administrator under this chapter. The Secretary of the Treasury may, at any time, sell any of the bonds acquired by him under this chapter. All redemptions, purchases, and sales by the Secretary of the Treasury of such bonds shall be treated as public debt transactions of the United States.
§ 838l. Bonneville Power Administration refinancing
- (a) For the purposes of this section—
- (1) “Administrator” means the Administrator of the Bonneville Power Administration;
- (2) “capital investment” means a capitalized cost funded by Federal appropriations that—
- (A) is for a project, facility, or separable unit or feature of a project or facility;
- (B) is a cost for which the Administrator is required by law to establish rates to repay to the United States Treasury through the sale of electric power, transmission, or other services;
- (C) excludes a Federal irrigation investment; and
- (D) excludes an investment financed by the current revenues of the Administrator or by bonds issued and sold, or authorized to be issued and sold, by the Administrator under section 838k of this title ;
- (3) “new capital investment” means a capital investment for a project, facility, or separable unit or feature of a project or facility, placed in service after September 30, 1996 ;
- (4) “old capital investment” means a capital investment the capitalized cost of which—
- (A) was incurred, but not repaid, before October 1, 1996 , and
- (B) was for a project, facility, or separable unit or feature of a project or facility, placed in service before October 1, 1996 ;
- (5) “repayment date” means the end of the period within which the Administrator’s rates are to assure the repayment of the principal amount of a capital investment; and
- (6) “Treasury rate” means—
- (A) for an old capital investment, a rate determined by the Secretary of the Treasury, taking into consideration prevailing market yields, during the month preceding October 1, 1996 , on outstanding interest-bearing obligations of the United States with periods to maturity comparable to the period between October 1, 1996 , and the repayment date for the old capital investment; and
- (B) for a new capital investment, a rate determined by the Secretary of the Treasury, taking into consideration prevailing market yields, during the month preceding the beginning of the fiscal year in which the related project, facility, or separable unit or feature is placed in service, on outstanding interest-bearing obligations of the United States with periods to maturity comparable to the period between the beginning of the fiscal year and the repayment date for the new capital investment.
- (b)
- (1) Effective October 1, 1996 , an old capital investment has a new principal amount that is the sum of—
- (A) the present value of the old payment amounts for the old capital investment, calculated using a discount rate equal to the Treasury rate for the old capital investment; and
- (B) an amount equal to $100,000,000 multiplied by a fraction whose numerator is the principal amount of the old payment amounts for the old capital investment and whose denominator is the sum of the principal amounts of the old payment amounts for all old capital investments.
- (2) With the approval of the Secretary of the Treasury based solely on consistency with this section, the Administrator shall determine the new principal amounts under subsection (b) and the assignment of interest rates to the new principal amounts under subsection (c).
- (3) For the purposes of this subsection, “old payment amounts” means, for an old capital investment, the annual interest and principal that the Administrator would have paid to the United States Treasury from October 1, 1996 , if this section had not been enacted, assuming that—
- (A) the principal were repaid—
- (i) on the repayment date the Administrator assigned before October 1, 1994 , to the old capital investment, or
- (ii) with respect to an old capital investment for which the Administrator has not assigned a repayment date before October 1, 1994 , on a repayment date the Administrator shall assign to the old capital investment in accordance with paragraph 10(d)(1) of the version of Department of Energy Order RA 6120.2 in effect on October 1, 1994 ; and
- (B) interest were paid—
- (i) at the interest rate the Administrator assigned before October 1, 1994 , to the old capital investment, or
- (ii) with respect to an old capital investment for which the Administrator has not assigned an interest rate before October 1, 1994 , at a rate determined by the Secretary of the Treasury, taking into consideration prevailing market yields, during the month preceding the beginning of the fiscal year in which the related project, facility, or separable unit or feature is placed in service, on outstanding interest-bearing obligations of the United States with periods to maturity comparable to the period between the beginning of the fiscal year and the repayment date for the old capital investment.
- (A) the principal were repaid—
- (1) Effective October 1, 1996 , an old capital investment has a new principal amount that is the sum of—
- (c) As of October 1, 1996 , the unpaid balance on the new principal amount established for an old capital investment under subsection (b) bears interest annually at the Treasury rate for the old capital investment until the earlier of the date that the new principal amount is repaid or the repayment date for the new principal amount.
- (d) As of October 1, 1996 , the repayment date for the new principal amount established for an old capital investment under subsection (b) is no earlier than the repayment date for the old capital investment assumed in subsection (b)(3)(A).
- (e) During the period October 1, 1996 , through September 30, 2001 , the total new principal amounts of old capital investments, as established under subsection (b), that the Administrator may pay before their respective repayment dates shall not exceed $100,000,000.
- (f)
- (1) The principal amount of a new capital investment includes interest in each fiscal year of construction of the related project, facility, or separable unit or feature at a rate equal to the one-year rate for the fiscal year on the sum of—
- (A) construction expenditures that were made from the date construction commenced through the end of the fiscal year, and
- (B) accrued interest during construction.
- (2) The Administrator is not required to pay, during construction of the project, facility, or separable unit or feature, the interest calculated, accrued, and capitalized under subsection (f)(1).
- (3) For the purposes of this section, “one-year rate” for a fiscal year means a rate determined by the Secretary of the Treasury, taking into consideration prevailing market yields, during the month preceding the beginning of the fiscal year, on outstanding interest-bearing obligations of the United States with periods to maturity of approximately one year.
- (1) The principal amount of a new capital investment includes interest in each fiscal year of construction of the related project, facility, or separable unit or feature at a rate equal to the one-year rate for the fiscal year on the sum of—
- (g) The unpaid balance on the principal amount of a new capital investment bears interest at the Treasury rate for the new capital investment from the date the related project, facility, or separable unit or feature is placed in service until the earlier of the date the new capital investment is repaid or the repayment date for the new capital investment.
- (h)
- (i) In each contract of the Administrator that provides for the Administrator to sell electric power, transmission, or related services, and that is in effect after September 30, 1996 , the Administrator shall offer to include, or as the case may be, shall offer to amend to include, provisions specifying that after September 30, 1996 —
- (1) the Administrator shall establish rates and charges on the basis that—
- (A) the principal amount of an old capital investment shall be no greater than the new principal amount established under subsection (b);
- (B) the interest rate applicable to the unpaid balance of the new principal amount of an old capital investment shall be no greater than the interest rate established under subsection (c);
- (C) any payment of principal of an old capital investment shall reduce the outstanding principal balance of the old capital investment in the amount of the payment at the time the payment is tendered; and
- (D) any payment of interest on the unpaid balance of the new principal amount of an old capital investment shall be a credit against the appropriate interest account in the amount of the payment at the time the payment is tendered;
- (2) apart from charges necessary to repay the new principal amount of an old capital investment as established under subsection (b) and to pay the interest on the principal amount under subsection (c), no amount may be charged for return to the United States Treasury as repayment for or return on an old capital investment, whether by way of rate, rent, lease payment, assessment, user charge, or any other fee;
- (3) amounts provided under section 1304 of title 31 shall be available to pay, and shall be the sole source for payment of, a judgment against or settlement by the Administrator or the United States on a claim for a breach of the contract provisions required by this Part; 1 1 So in original. Probably should be “section;” or “section”. and
- (4) the contract provisions specified in this Part 1 do not—
- (A) preclude the Administrator from recovering, through rates or other means, any tax that is generally imposed on electric utilities in the United States, or
- (B) affect the Administrator’s authority under applicable law, including section 839e(g) of this title , to—
- (i) allocate costs and benefits, including but not limited to fish and wildlife costs, to rates or resources, or
- (ii) design rates.
- (1) the Administrator shall establish rates and charges on the basis that—
- (j)
- (1) This section does not affect the obligation of the Administrator to repay the principal associated with each capital investment, and to pay interest on the principal, only from the “Administrator’s net proceeds,” as defined in section 838k(b) of this title .
- (2) Except as provided in subsection (e), this section does not affect the authority of the Administrator to pay all or a portion of the principal amount associated with a capital investment before the repayment date for the principal amount.
§ 839. Congressional declaration of purpose
The purposes of this chapter, together with the provisions of other laws applicable to the Federal Columbia River Power System, are all intended to be construed in a consistent manner. Such purposes are also intended to be construed in a manner consistent with applicable environmental laws. Such purposes are:
- (1) to encourage, through the unique opportunity provided by the Federal Columbia River Power System—
- (A) conservation and efficiency in the use of electric power, and
- (B) the development of renewable resources within the Pacific Northwest;
- (2) to assure the Pacific Northwest of an adequate, efficient, economical, and reliable power supply;
- (3) to provide for the participation and consultation of the Pacific Northwest States, local governments, consumers, customers, users of the Columbia River System (including Federal and State fish and wildlife agencies and appropriate Indian tribes), and the public at large within the region in—
- (A) the development of regional plans and programs related to energy conservation, renewable resources, other resources, and protecting, mitigating and enhancing fish and wildlife resources,
- (B) facilitating the orderly planning of the region’s power system, and
- (C) providing environmental quality;
- (4) to provide that the customers of the Bonneville Power Administration and their consumers continue to pay all costs necessary to produce, transmit, and conserve resources to meet the region’s electric power requirements, including the amortization on a current basis of the Federal investment in the Federal Columbia River Power System;
- (5) to insure, subject to the provisions of this chapter—
- (A) that the authorities and responsibilities of State and local governments, electric utility systems, water management agencies, and other non-Federal entities for the regulation, planning, conservation, supply, distribution, and use of electric power shall be construed to be maintained, and
- (B) that Congress intends that this chapter not be construed to limit or restrict the ability of customers to take actions in accordance with other applicable provisions of Federal or State law, including, but not limited to, actions to plan, develop, and operate resources and to achieve conservation, without regard to this chapter; and
- (6) to protect, mitigate and enhance the fish and wildlife, including related spawning grounds and habitat, of the Columbia River and its tributaries, particularly anadromous fish which are of significant importance to the social and economic well-being of the Pacific Northwest and the Nation and which are dependent on suitable environmental conditions substantially obtainable from the management and operation of the Federal Columbia River Power System and other power generating facilities on the Columbia River and its tributaries.
§ 839a. Definitions
As used in this chapter, the term—
- (1) “Acquire” and “acquisition” shall not be construed as authorizing the Administrator to construct, or have ownership of, under this chapter or any other law, any electric generating facility.
- (2) “Administrator” means the Administrator of the Bonneville Power Administration.
- (3) “Conservation” means any reduction in electric power consumption as a result of increases in the efficiency of energy use, production, or distribution.
- (4)
- (A) “Cost-effective”, when applied to any measure or resource referred to in this chapter, means that such measure or resource must be forecast—
- (i) to be reliable and available within the time it is needed, and
- (ii) to meet or reduce the electric power demand, as determined by the Council or the Administrator, as appropriate, of the consumers of the customers at an estimated incremental system cost no greater than that of the least-cost similarly reliable and available alternative measure or resource, or any combination thereof.
- (B) For purposes of this paragraph, the term “system cost” means an estimate of all direct costs of a measure or resource over its effective life, including, if applicable, the cost of distribution and transmission to the consumer and, among other factors, waste disposal costs, end-of-cycle costs, and fuel costs (including projected increases), and such quantifiable environmental costs and benefits as the Administrator determines, on the basis of a methodology developed by the Council as part of the plan, or in the absence of the plan by the Administrator, are directly attributable to such measure or resource.
- (C) In determining the amount of power that a conservation measure or other resource may be expected to save or to produce, the Council or the Administrator, as the case may be, shall take into account projected realization factors and plant factors, including appropriate historical experience with similar measures or resources.
- (D) For purposes of this paragraph, the “estimated incremental system cost” of any conservation measure or resource shall not be treated as greater than that of any nonconservation measure or resource unless the incremental system cost of such conservation measure or resource is in excess of 110 per centum of the incremental system cost of the nonconservation measure or resource.
- (A) “Cost-effective”, when applied to any measure or resource referred to in this chapter, means that such measure or resource must be forecast—
- (5) “Consumer” means any end user of electric power.
- (6) “Council” means, unless otherwise specifically provided, the members appointed to the Pacific Northwest Electric Power and Conservation Planning Council established pursuant to section 839b of this title .
- (7) “Customer” means anyone who contracts for the purchase of power from the Administrator pursuant to this chapter.
- (8) “Direct service industrial customer” means an industrial customer that contracts for the purchase of power from the Administrator for direct consumption.
- (9) “Electric power” means electric peaking capacity, or electric energy, or both.
- (10) “Federal base system resources” means—
- (A) the Federal Columbia River Power System hydroelectric projects;
- (B) resources acquired by the Administrator under long-term contracts in force on December 5, 1980 ; and
- (C) resources acquired by the Administrator in an amount necessary to replace reductions in capability of the resources referred to in subparagraphs (A) and (B) of this paragraph.
- (11) “Indian tribe” means any Indian tribe or band which is located in whole or in part in the region and which has a governing body which is recognized by the Secretary of the Interior.
- (12) “Major resource” means any resource that—
- (A) has a planned capability greater than fifty average megawatts, and
- (B) if acquired by the Administrator, is acquired for a period of more than five years.
- (13) “New large single load” means any load associated with a new facility, an existing facility, or an expansion of an existing facility—
- (A) which is not contracted for, or committed to, as determined by the Administrator, by a public body, cooperative, investor-owned utility, or Federal agency customer prior to September 1, 1979 , and
- (B) which will result in an increase in power requirements of such customer of ten average megawatts or more in any consecutive twelve-month period.
- (14) “Pacific Northwest”, “region”, or “regional” means—
- (A) the area consisting of the States of Oregon, Washington, and Idaho, the portion of the State of Montana west of the Continental Divide, and such portions of the States of Nevada, Utah, and Wyoming as are within the Columbia River drainage basin; and
- (B) any contiguous areas, not in excess of seventy-five air miles from the area referred to in subparagraph (A), which are a part of the service area of a rural electric cooperative customer served by the Administrator on December 5, 1980 , which has a distribution system from which it serves both within and without such region.
- (15) “Plan” means the Regional Electric Power and Conservation plan (including any amendments thereto) adopted pursuant to this chapter and such plan shall apply to actions of the Administrator as specified in this chapter.
- (16) “Renewable resource” means a resource which utilizes solar, wind, hydro, geothermal, biomass, or similar sources of energy and which either is used for electric power generation or will reduce the electric power requirements of a consumer, including by direct application.
- (17) “Reserves” means the electric power needed to avert particular planning or operating shortages for the benefit of firm power customers of the Administrator and available to the Administrator (A) from resources or (B) from rights to interrupt, curtail, or otherwise withdraw, as provided by specific contract provisions, portions of the electric power supplied to customers.
- (18) “Residential use” or “residential load” means all usual residential, apartment, seasonal dwelling and farm electrical loads or uses, but only the first four hundred horsepower during any monthly billing period of farm irrigation and pumping for any farm.
- (19) “Resource” means—
- (A) electric power, including the actual or planned electric power capability of generating facilities, or
- (B) actual or planned load reduction resulting from direct application of a renewable energy resource by a consumer, or from a conservation measure.
- (20) “Secretary” means the Secretary of Energy.
§ 839b. Regional planning and participation
- (a)
- (1) The purposes of this section are to provide for the prompt establishment and effective operation of the Pacific Northwest Electric Power and Conservation Planning Council, to further the purposes of this chapter by the Council promptly preparing and adopting (A) a regional conservation and electric power plan and (B) a program to protect, mitigate, and enhance fish and wildlife, and to otherwise expeditiously and effectively carry out the Council’s responsibilities and functions under this chapter.
- (2) To achieve such purposes and facilitate cooperation among the States of Idaho, Montana, Oregon, and Washington, and with the Bonneville Power Administration, the consent of Congress is given for an agreement described in this paragraph and not in conflict with this chapter, pursuant to which—
- (A) there shall be established a regional agency known as the “Pacific Northwest Electric Power and Conservation Planning Council” which (i) shall have its offices in the Pacific Northwest, (ii) shall carry out its functions and responsibilities in accordance with the provisions of this chapter, (iii) shall continue in force and effect in accordance with the provisions of this chapter, and (iv) except as otherwise provided in this chapter, shall not be considered an agency or instrumentality of the United States for the purpose of any Federal law; and
- (B) two persons from each State may be appointed, subject to the applicable laws of each such State, to undertake the functions and duties of members of the Council.
- (3) Except as otherwise provided by State law, each member appointed to the Council shall serve for a term of three years, except that, with respect to members initially appointed, each Governor shall designate one member to serve a term of two years and one member to serve a term of three years. The members of the Council shall select from among themselves a chairman. The members and officers and employees of the Council shall not be deemed to be officers or employees of the United States for any purpose. The Council shall appoint, fix compensation, assign and delegate duties to such executive and additional personnel as the Council deems necessary to fulfill its functions under this chapter, taking into account such information and analyses as are, or are likely to be, available from other sources pursuant to provisions of this chapter. The compensation of the members shall be fixed by State law. The compensation of the members and the officers shall not exceed the rate prescribed for Federal officers and positions at step 1 of level GS–18 of the General Schedule.
- (4) For the purpose of providing a uniform system of laws, in addition to this chapter, applicable to the Council relating to the making of contracts, conflicts-of-interest, financial disclosure, open meetings of the Council, advisory committees, disclosure of information, judicial review of Council functions and actions under this chapter, and related matters, the Federal laws applicable to such matters in the case of the Bonneville Power Administration shall apply to the Council to the extent appropriate, except that with respect to open meetings, the Federal laws applicable to open meetings in the case of the Federal Energy Regulatory Commission shall apply to the Council to the extent appropriate. In applying the Federal laws applicable to financial disclosure under the preceding sentence, such laws shall be applied to members of the Council without regard to the duration of their service on the Council or the amount of compensation received for such service. No contract, obligation, or other action of the Council shall be construed as an obligation of the United States or an obligation secured by the full faith and credit of the United States. For the purpose of judicial review of any action of the Council or challenging any provision of this chapter relating to functions and responsibilities of the Council, notwithstanding any other provision of law, the courts of the United States shall have exclusive jurisdiction of any such review.
- (b)
- (1) If the Council is not established and its members are not timely appointed in accordance with subsection (a) of this section, or if, at any time after such Council is established and its members are appointed in accordance with subsection (a)—
- (A) any provision of this chapter relating to the establishment of the Council or to any substantial function or responsibility of the Council (including any function or responsibility under subsection (d) or (h) of this section or under section 839d(c) of this title ) is held to be unlawful by a final determination of any Federal court, or
- (B) the plan or any program adopted by such Council under this section is held by a final determination of such a court to be ineffective by reason of subsection (a)(2)(B),
- (2) As soon as practicable, but not more than thirty days after the publication of the notice referred to in paragraph (1) of this subsection, and thereafter within forty-five days after a vacancy occurs, the Governors of the States of Washington, Oregon, Idaho, and Montana may each (under applicable State laws, if any) provide to the Secretary a list of nominations from such State for each of the State’s positions to be selected for such Council. The Secretary may extend this time an additional thirty days. The list shall include at least two persons for each such position. The list shall include such information about such nominees as the Secretary may request. The Secretary shall appoint the Council members from each Governor’s list of nominations for each State’s positions, except that the Secretary may decline to appoint for any reason any of a Governor’s nominees for a position and shall so notify the Governor. The Governor may thereafter make successive nominations within forty-five days of receipt of such notice until nominees acceptable to the Secretary are appointed for each position. In the event the Governor of any such State fails to make the required nominations for any State position on such Council within the time specified for such nominations, the Secretary shall select from such State and appoint the Council member or members for such position. The members of the Council shall select from among themselves one member of the Council as Chairman.
- (3) The members of the Council established by this subsection who are not employed by the United States or a State shall receive compensation at a rate equal to the rate prescribed for offices and positions at level GS–18 of the General Schedule for each day such members are engaged in the actual performance of duties as members of such Council, except that no such member may be paid more in any calendar year than an officer or employee at step 1 of level GS–18 is paid during such year. Members of such Council shall be considered officers or employees of the United States for purposes of title II of the Ethics in Government Act of 1978 (5 U.S.C. app.) 1 1 See References in Text note below. and shall also be allowed travel expenses, including per diem in lieu of subsistence, in the same manner as persons employed intermittently in Government service are allowed expenses under section 5703 of title 5 . Such Council may appoint, and assign duties to, an executive director who shall serve at the pleasure of such Council and who shall be compensated at the rate established for GS–18 of the General Schedule. The executive director shall exercise the powers and duties delegated to such director by such Council, including the power to appoint and fix compensation of additional personnel in accordance with applicable Federal law to carry out the functions and responsibilities of such Council.
- (4) When a Council is established under this subsection after a Council was established pursuant to subsection (a) of this section, the Secretary shall provide, to the greatest extent feasible, for the transfer to the Council established by this subsection of all funds, books, papers, documents, equipment, and other matters in order to facilitate the Council’s capability to achieve the requirements of subsections (d) and (h) of this section. In order to carry out its functions and responsibilities under this chapter expeditiously, the Council shall take into consideration any actions of the Council under subsection (a) and may review, modify, or confirm such actions without further proceedings.
- (5)
- (A) At any time beginning one year after the plan referred to in such subsection (d) and the program referred to in such subsection (h) of this section are both finally adopted in accordance with this chapter, the Council established pursuant to this subsection shall be terminated by the Secretary 90 days after the Governors of three of the States referred to in this subsection jointly provide for any reason to the Secretary a written request for such termination. Except as provided in subparagraph (B), upon such termination all functions and responsibilities of the Council under this chapter shall also terminate.
- (B) Upon such termination of the Council, the functions and responsibilities of the Council set forth in subsection (h) of this section shall be transferred to, and continue to be funded and carried out, jointly, by the Administrator, the Secretary of the Interior, and the Administrator of the National Marine Fisheries Service, in the same manner and to the same extent as required by such subsection and in cooperation with the Federal and the region’s State fish and wildlife agencies and Indian tribes referred to in subsection (h) of this section and the Secretary shall provide for the transfer to them of all records, books, documents, funds, and personnel of such Council that relate to subsection (h) matters. In order to carry out such functions and responsibilities expeditiously, the Administrator, the Secretary of the Interior, and the Administrator of the National Marine Fisheries Service shall take into consideration any actions of the Council under this subsection, and may review, modify, or confirm such actions without further proceedings. In the event the Council is terminated pursuant to this paragraph, whenever any action of the Administrator requires any approval or other action by the Council, the Administrator may take such action without such approval or action, except that the Administrator may not implement any proposal to acquire a major generating resource or to grant billing credits involving a major generating resource until the expenditure of funds for that purpose is specifically authorized by Act of Congress enacted after such termination.
- (1) If the Council is not established and its members are not timely appointed in accordance with subsection (a) of this section, or if, at any time after such Council is established and its members are appointed in accordance with subsection (a)—
- (c)
- (1) The provisions of this subsection shall, except as specifically provided in this subsection, apply to the Council established pursuant to either subsection (a) or (b) of this section.
- (2) A majority of the members of the Council shall constitute a quorum. Except as otherwise provided specifically in this chapter, all actions and decisions of the Council shall be by majority vote of the members present and voting. The plan or any part thereof and any amendment thereto shall not be approved unless such plan or amendment receives the votes of—
- (A) a majority of the members appointed to the Council, including the vote of at least one member from each State with members on the Council; or
- (B) at least six members of the Council.
- (3) The Council shall meet at the call of the Chairman or upon the request of any three members of the Council. If any member of the Council disagrees with respect to any matter transmitted to any Federal or State official or any other person or wishes to express additional views concerning such matter, such member may submit a statement to accompany such matter setting forth the reasons for such disagreement or views.
- (4) The Council shall determine its organization and prescribe its practices and procedures for carrying out its functions and responsibilities under this chapter. The Council shall make available to the public a statement of its organization, practices, and procedures, and make available to the public its annual work program budget at the time the President submits his annual budget to Congress.
- (5) Upon request of the Council established pursuant to subsection (b) of this section, the head of any Federal agency is authorized to detail or assign to the Council, on a reimbursable basis, any of the personnel of such agency to assist the Council in the performance of its functions under this chapter.
- (6) At the Council’s request the Administrator of the General Services Administration shall furnish the Council established pursuant to subsection (b) of this section with such offices, equipment, supplies, and services in the same manner and to the same extent as such Administrator is authorized to furnish to any other Federal agency or instrumentality such offices, supplies, equipment, and services.
- (7) Upon the request of the Congress or any committee thereof, the Council shall promptly provide to the Congress, or to such committee, any record, report, document, material, and other information which is in the possession of the Council.
- (8) To obtain such information and advice as the Council determines to be necessary or appropriate to carry out its functions and responsibilities pursuant to this chapter, the Council shall, to the greatest extent practicable, solicit engineering, economic, social, environmental, and other technical studies from customers of the Administrator and from other bodies or organizations in the region with particular expertise.
- (9) The Administrator and other Federal agencies, to the extent authorized by other provisions of law, shall furnish the Council all information requested by the Council as necessary for performance of its functions, subject to such requirements of law concerning trade secrets and proprietary data as may be applicable.
- (10)
- (A) At the request of the Council, the Administrator shall pay from funds available to the Administrator the compensation and other expenses of the Council as are authorized by this chapter, including the reimbursement of those States with members on the Council for services and personnel to assist in preparing a plan pursuant to subsection (d) and a program pursuant to subsection (h) of this section, as the Council determines are necessary or appropriate for the performance of its functions and responsibilities. Such payments shall be included by the Administrator in his annual budgets submitted to Congress pursuant to the Federal Columbia River Transmission System Act [ 16 U.S.C. 838 et seq.] and shall be subject to the requirements of that Act, including the audit requirements of section 11(d) of such Act [ 16 U.S.C. 838i(d) ]. The records, reports, and other documents of the Council shall be available to the Comptroller General for review in connection with such audit or other review and examination by the Comptroller General pursuant to other provisions of law applicable to the Comptroller General. Funds provided by the Administrator for such payments shall not exceed annually an amount equal to 0.02 mill multiplied by the kilowatt hours of firm power forecast to be sold by the Administrator during the year to be funded. In order to assist the Council’s initial organization, the Administrator after December 5, 1980 , shall promptly prepare and propose an amended annual budget to expedite payment for Council activities.
- (B) Notwithstanding the limitation contained in the fourth sentence of subparagraph (A) of this paragraph, upon an annual showing by the Council that such limitation will not permit the Council to carry out its functions and responsibilities under this chapter the Administrator may raise such limit up to any amount not in excess of 0.10 mill multiplied by the kilowatt hours of firm power forecast to be sold by the Administrator during the year to be funded.
- (11) The Council shall establish a voluntary scientific and statistical advisory committee to assist in the development, collection, and evaluation of such statistical, biological, economic, social, environmental, and other scientific information as is relevant to the Council’s development and amendment of a regional conservation and electric power plan.
- (12) The Council may establish such other voluntary advisory committees as it determines are necessary or appropriate to assist it in carrying out its functions and responsibilities under this chapter.
- (13) The Council shall ensure that the membership for any advisory committee established or formed pursuant to this section shall, to the extent feasible, include representatives of, and seek the advice of, the Federal, and the various regional, State, local, and Indian Tribal Governments, consumer groups, and customers.
- (d)
- (1) Within two years after the Council is established and the members are appointed pursuant to subsection (a) or (b) of this section, the Council shall prepare, adopt, and promptly transmit to the Administrator a regional conservation and electric power plan. The adopted plan, or any portion thereof, may be amended from time to time, and shall be reviewed by the Council not less frequently than once every five years. Prior to such adoption, public hearings shall be held in each Council member’s State on the plan or substantial, nontechnical amendments to the plan proposed by the Council for adoption. A public hearing shall also be held in any other State of the region on the plan or amendments thereto, if the Council determines that the plan or amendments would likely have a substantial impact on that State in terms of major resources which may be developed in that State and which the Administrator may seek to acquire. Action of the Council under this subsection concerning such hearings shall be subject to section 553 of title 5 and such procedure as the Council shall adopt.
- (2) Following adoption of the plan and any amendment thereto, all actions of the Administrator pursuant to section 839d of this title shall be consistent with the plan and any amendment thereto, except as otherwise specifically provided in this chapter.
- (e)
- (1) The plan shall, as provided in this paragraph, give priority to resources which the Council determines to be cost-effective. Priority shall be given: first, to conservation; second, to renewable resources; third, to generating resources utilizing waste heat or generating resources of high fuel conversion efficiency; and fourth, to all other resources.
- (2) The plan shall set forth a general scheme for implementing conservation measures and developing resources pursuant to section 839d of this title to reduce or meet the Administrator’s obligations with due consideration by the Council for (A) environmental quality, (B) compatibility with the existing regional power system, (C) protection, mitigation, and enhancement of fish and wildlife and related spawning grounds and habitat, including sufficient quantities and qualities of flows for successful migration, survival, and propagation of anadromous fish, and (D) other criteria which may be set forth in the plan.
- (3) To accomplish the priorities established by this subsection, the plan shall include the following elements which shall be set forth in such detail as the Council determines to be appropriate:
- (A) an energy conservation program to be implemented under this chapter, including, but not limited to, model conservation standards;
- (B) recommendation for research and development;
- (C) a methodology for determining quantifiable environmental costs and benefits under section 839a(4) of this title ;
- (D) a demand forecast of at least twenty years (developed in consultation with the Administrator, the customers, the States, including State agencies with ratemaking authority over electric utilities, and the public, in such manner as the Council deems appropriate) and a forecast of power resources estimated by the Council to be required to meet the Administrator’s obligations and the portion of such obligations the Council determines can be met by resources in each of the priority categories referred to in paragraph (1) of this subsection which forecast (i) shall include regional reliability and reserve requirements, (ii) shall take into account the effect, if any, of the requirements of subsection (h) on the availability of resources to the Administrator, and (iii) shall include the approximate amounts of power the Council recommends should be acquired by the Administrator on a long-term basis and may include, to the extent practicable, an estimate of the types of resources from which such power should be acquired;
- (E) an analysis of reserve and reliability requirements and cost-effective methods of providing reserves designed to insure adequate electric power at the lowest probable cost;
- (F) the program adopted pursuant to subsection (h); and
- (G) if the Council recommends surcharges pursuant to subsection (f) of this section, a methodology for calculating such surcharges.
- (4) The Council, taking into consideration the requirement that it devote its principal efforts to carrying out its responsibilities under subsections (d) and (h) of this section, shall undertake studies of conservation measures reasonably available to direct service industrial customers and other major consumers of electric power within the region and make an analysis of the estimated reduction in energy use which would result from the implementation of such measures as rapidly as possible, consistent with sound business practices. The Council shall consult with such customers and consumers in the conduct of such studies.
- (f)
- (1) Model conservation standards to be included in the plan shall include, but not be limited to, standards applicable to (A) new and existing structures, (B) utility, customer, and governmental conservation programs, and (C) other consumer actions for achieving conservation. Model conservation standards shall reflect geographic and climatic differences within the region and other appropriate considerations, and shall be designed to produce all power savings that are cost-effective for the region and economically feasible for consumers, taking into account financial assistance made available to consumers under section 839d(a) of this title . These model conservation standards shall be adopted by the Council and included in the plan after consultation, in such manner as the Council deems appropriate, with the Administrator, States, and political subdivisions, customers of the Administrator, and the public.
- (2) The Council by a majority vote of the members of the Council is authorized to recommend to the Administrator a surcharge and the Administrator may thereafter impose such a surcharge, in accordance with the methodology provided in the plan, on customers for those portions of their loads within the region that are within States or political subdivisions which have not, or on the Administrator’s customers which have not, implemented conservation measures that achieve energy savings which the Administrator determines are comparable to those which would be obtained under such standards. Such surcharges shall be established to recover such additional costs as the Administrator determines will be incurred because such projected energy savings attributable to such conservation measures have not been achieved, but in no case may such surcharges be less than 10 per centum or more than 50 per centum of the Administrator’s applicable rates for such load or portion thereof.
- (g)
- (1) To insure widespread public involvement in the formulation of regional power policies, the Council and Administrator shall maintain comprehensive programs to—
- (A) inform the Pacific Northwest public of major regional power issues,
- (B) obtain public views concerning major regional power issues, and
- (C) secure advice and consultation from the Administrator’s customers and others.
- (2) In carrying out the provisions of this section, the Council and the Administrator shall—
- (A) consult with the Administrator’s customers;
- (B) include the comments of such customers in the record of the Council’s proceedings; and
- (C) recognize and not abridge the authorities of State and local governments, electric utility systems, and other non-Federal entities responsible to the people of the Pacific Northwest for the planning, conservation, supply, distribution, and use of electric power and the operation of electric generating facilities.
- (3) In the preparation, adoption, and implementation of the plan, the Council and the Administrator shall encourage the cooperation, participation, and assistance of appropriate Federal agencies, State entities, State political subdivisions, and Indian tribes. The Council and the Administrator are authorized to contract, in accordance with applicable law, with such agencies, entities, tribes, and subdivisions individually, in groups, or through associations thereof to (A) investigate possible measures to be included in the plan, (B) provide public involvement and information regarding a proposed plan or amendment thereto, and (C) provide services which will assist in the implementation of the plan. In order to assist in the implementation of the plan, particularly conservation, renewable resource, and fish and wildlife activities, the Administrator, when requested and subject to available funds, may provide technical assistance in establishing conservation, renewable resource, and fish and wildlife objectives by individual States or subdivisions thereof or Indian tribes. Such objectives, if adopted by a State or subdivision thereof or Indian tribes, may be submitted to the Council and the Administrator for review, and upon approval by the Council, may be incorporated as part of the plan.
- (1) To insure widespread public involvement in the formulation of regional power policies, the Council and Administrator shall maintain comprehensive programs to—
- (h)
- (1)
- (A) The Council shall promptly develop and adopt, pursuant to this subsection, a program to protect, mitigate, and enhance fish and wildlife, including related spawning grounds and habitat, on the Columbia River and its tributaries. Because of the unique history, problems, and opportunities presented by the development and operation of hydroelectric facilities on the Columbia River and its tributaries, the program, to the greatest extent possible, shall be designed to deal with that river and its tributaries as a system.
- (B) This subsection shall be applicable solely to fish and wildlife, including related spawning grounds and habitat, located on the Columbia River and its tributaries. Nothing in this subsection shall alter, modify, or affect in any way the laws applicable to rivers or river systems, including electric power facilities related thereto, other than the Columbia River and its tributaries, or affect the rights and obligations of any agency, entity, or person under such laws.
- (2) The Council shall request, in writing, promptly after the Council is established under either subsection (a) or (b) of this section and prior to the development or review of the plan, or any major revision thereto, from the Federal, and the region’s State, fish and wildlife agencies and from the region’s appropriate Indian tribes, recommendations for—
- (A) measures which can be expected to be implemented by the Administrator, using authorities under this chapter and other laws, and other Federal agencies to protect, mitigate, and enhance fish and wildlife, including related spawning grounds and habitat, affected by the development and operation of any hydroelectric project on the Columbia River and its tributaries;
- (B) establishing objectives for the development and operation of such projects on the Columbia River and its tributaries in a manner designed to protect, mitigate, and enhance fish and wildlife; and
- (C) fish and wildlife management coordination and research and development (including funding) which, among other things, will assist protection, mitigation, and enhancement of anadromous fish at, and between, the region’s hydroelectric dams.
- (3) Such agencies and tribes shall have 90 days to respond to such request, unless the Council extends the time for making such recommendations. The Federal, and the region’s, water management agencies, and the region’s electric power producing agencies, customers, and public may submit recommendations of the type referred to in paragraph (2) of this subsection. All recommendations shall be accompanied by detailed information and data in support of the recommendations.
- (4)
- (A) The Council shall give notice of all recommendations and shall make the recommendations and supporting documents available to the Administrator, to the Federal, and the region’s, State fish and wildlife agencies, to the appropriate Indian tribes, to Federal agencies responsible for managing, operating, or regulating hydroelectric facilities located on the Columbia River or its tributaries, and to any customer or other electric utility which owns or operates any such facility. Notice shall also be given to the public. Copies of such recommendations and supporting documents shall be made available for review at the offices of the Council and shall be available for reproduction at reasonable cost.
- (B) The Council shall provide for public participation and comment regarding the recommendations and supporting documents, including an opportunity for written and oral comments, within such reasonable time as the Council deems appropriate.
- (5) The Council shall develop a program on the basis of such recommendations supporting documents, and views and information obtained through public comment and participation, and consultation with the agencies, tribes, and customers referred to in subparagraph (A) of paragraph (4). The program shall consist of measures to protect, mitigate, and enhance fish and wildlife affected by the development, operation, and management of such facilities while assuring the Pacific Northwest an adequate, efficient economical, and reliable power supply. Enhancement measures shall be included in the program to the extent such measures are designed to achieve improved protection and mitigation.
- (6) The Council shall include in the program measures which it determines, on the basis set forth in paragraph (5), will—
- (A) complement the existing and future activities of the Federal and the region’s State fish and wildlife agencies and appropriate Indian tribes;
- (B) be based on, and supported by, the best available scientific knowledge;
- (C) utilize, where equally effective alternative means of achieving the same sound biological objective exist, the alternative with the minimum economic cost;
- (D) be consistent with the legal rights of appropriate Indian tribes in the region; and
- (E) in the case of anadromous fish—
- (i) provide for improved survival of such fish at hydroelectric facilities located on the Columbia River system; and
- (ii) provide flows of sufficient quality and quantity between such facilities to improve production, migration, and survival of such fish as necessary to meet sound biological objectives.
- (7) The Council shall determine whether each recommendation received is consistent with the purposes of this chapter. In the event such recommendations are inconsistent with each other, the Council, in consultation with appropriate entities, shall resolve such inconsistency in the program giving due weight to the recommendations, expertise, and legal rights and responsibilities of the Federal and the region’s State fish and wildlife agencies and appropriate Indian tribes. If the Council does not adopt any recommendation of the fish and wildlife agencies and Indian tribes as part of the program or any other recommendation, it shall explain in writing, as part of the program, the basis for its finding that the adoption of such recommendation would be—
- (A) inconsistent with paragraph (5) of this subsection;
- (B) inconsistent with paragraph (6) of this subsection; or
- (C) less effective than the adopted recommendations for the protection, mitigation, and enhancement of fish and wildlife.
- (8) The Council shall consider, in developing and adopting a program pursuant to this subsection, the following principles:
- (A) Enhancement measures may be used, in appropriate circumstances, as a means of achieving offsite protection and mitigation with respect to compensation for losses arising from the development and operation of the hydroelectric facilities of the Columbia River and its tributaries as a system.
- (B) Consumers of electric power shall bear the cost of measures designed to deal with adverse impacts caused by the development and operation of electric power facilities and programs only.
- (C) To the extent the program provides for coordination of its measures with additional measures (including additional enhancement measures to deal with impacts caused by factors other than the development and operation of electric power facilities and programs), such additional measures are to be implemented in accordance with agreements among the appropriate parties providing for the administration and funding of such additional measures.
- (D) Monetary costs and electric power losses resulting from the implementation of the program shall be allocated by the Administrator consistent with individual project impacts and system wide objectives of this subsection.
- (9) The Council shall adopt such program or amendments thereto within one year after the time provided for receipt of the recommendations. Such program shall also be included in the plan adopted by the Council under subsection (d).
- (10)
- (A) The Administrator shall use the Bonneville Power Administration fund and the authorities available to the Administrator under this chapter and other laws administered by the Administrator to protect, mitigate, and enhance fish and wildlife to the extent affected by the development and operation of any hydroelectric project of the Columbia River and its tributaries in a manner consistent with the plan, if in existence, the program adopted by the Council under this subsection, and the purposes of this chapter. Expenditures of the Administrator pursuant to this paragraph shall be in addition to, not in lieu of, other expenditures authorized or required from other entities under other agreements or provisions of law.
- (B) The Administrator may make expenditures from such fund which shall be included in the annual or supplementary budgets submitted to the Congress pursuant to the Federal Columbia River Transmission System Act [ 16 U.S.C. 838 et seq.]. Any amounts included in such budget for the construction of capital facilities with an estimated life of greater than 15 years and an estimated cost of at least $2,500,000 shall be funded in the same manner and in accordance with the same procedures as major transmission facilities under the Federal Columbia River Transmission System Act.
- (C) The amounts expended by the Administrator for each activity pursuant to this subsection shall be allocated as appropriate by the Administrator, in consultation with the Corps of Engineers and the Water and Power Resources Service, among the various hydroelectric projects of the Federal Columbia River Power System. Amounts so allocated shall be allocated to the various project purposes in accordance with existing accounting procedures for the Federal Columbia River Power System.
- (D)
- (i) The Northwest Power Planning Council (Council) shall appoint an Independent Scientific Review Panel (Panel), which shall be comprised of eleven members, to review projects proposed to be funded through that portion of the Bonneville Power Administration’s (BPA) annual fish and wildlife budget that implements the Council’s fish and wildlife program. Members shall be appointed from a list of no fewer than 20 scientists submitted by the National Academy of Sciences (Academy), provided that Pacific Northwest scientists with expertise in Columbia River anadromous and non-anadromous fish and wildlife and ocean experts shall be among those represented on the Panel. The Academy shall provide such nominations within 90 days of September 30, 1996 , and in any case not later than December 31, 1996 . If appointments are required in subsequent years, the Council shall request nominations from the Academy and the Academy shall provide nominations not later than 90 days after the date of this request. If the Academy does not provide nominations within these time requirements, the Council may appoint such members as the Council deems appropriate.
- (ii) The Council shall establish Scientific Peer Review Groups (Peer Review Groups), which shall be comprised of the appropriate number of scientists, from a list submitted by the Academy to assist the Panel in making its recommendations to the Council for projects to be funded through BPA’s annual fish and wildlife budget, provided that Pacific Northwest scientists with expertise in Columbia River anadromous and non-anadromous fish and wildlife and ocean experts shall be among those represented on the Peer Review Groups. The Academy shall provide such nominations within 90 days of September 30, 1996 , and in any case not later than December 31, 1996 . If appointments are required in subsequent years, the Council shall request nominations from the Academy and the Academy shall provide nominations not later than 90 days after the date of this request. If the Academy does not provide nominations within these time requirements, the Council may appoint such members as the Council deems appropriate.
- (iii) Panel and Peer Review Group members may be compensated and shall be considered subject to the conflict of interest standards that apply to scientists performing comparable work for the National Academy of Sciences; provided that a Panel or Peer Review Group members with a direct or indirect financial interest in a project, or projects, shall recuse himself or herself from review of, or recommendations associated with, such project or projects. All expenses of the Panel and the Peer Review Groups shall be paid by BPA as provided for under paragraph (vii). Neither the Panel nor the Peer Review Groups shall be deemed advisory committees within the meaning of the Federal Advisory Committee Act.
- (iv) The Peer Groups, in conjunction with the Panel, shall review projects proposed to be funded through BPA’s annual fish and wildlife budget and make recommendations on matters related to such projects to the Council no later than June 15 of each year. If the recommendations are not received by the Council by this date, the Council may proceed to make final recommendations on project funding to BPA, relying on the best information available. The Panel and Peer Review Groups shall review a sufficient number of projects to adequately ensure that the list of prioritized projects recommended is consistent with the Council’s program. Project recommendations shall be based on a determination that projects: are based on sound science principles; benefit fish and wildlife; and have a clearly defined objective and outcome with provisions for monitoring and evaluation of results. The Panel, with assistance from the Peer Review Groups, shall review, on an annual basis, the results of prior year expenditures based upon these criteria and submit its findings to the Council for its review.
- (v) Upon completion of the review of projects to be funded through BPA’s annual fish and wildlife budget, the Peer Review Groups shall submit its findings to the Panel. The Panel shall analyze the information submitted by the Peer Review Groups and submit recommendations on project priorities to the Council. The Council shall make the Panel’s findings available to the public and subject to public comment.
- (vi) The Council shall fully consider the recommendations of the Panel when making its final recommendations of projects to be funded through BPA’s annual fish and wildlife budget, and if the Council does not incorporate a recommendation of the Panel, the Council shall explain in writing its reasons for not accepting Panel recommendations. In making its recommendations to BPA, the Council shall consider the impact of ocean conditions on fish and wildlife populations and shall determine whether the projects employ cost-effective measures to achieve program objectives. The Council, after consideration of the recommendations of the Panel and other appropriate entities, shall be responsible for making the final recommendations of projects to be funded through BPA’s annual fish and wildlife budget.
- (vii) The annual cost of this provision shall not exceed $500,000 in 1997 dollars.
- (11)
- (A) The Administrator and other Federal agencies responsible for managing, operating, or regulating Federal or non-Federal hydroelectric facilities located on the Columbia River or its tributaries shall—
- (i) exercise such responsibilities consistent with the purposes of this chapter and other applicable laws, to adequately protect, mitigate, and enhance fish and wildlife, including related spawning grounds and habitat, affected by such projects or facilities in a manner that provides equitable treatment for such fish and wildlife with the other purposes for which such system and facilities are managed and operated;
- (ii) exercise such responsibilities, taking into account at each relevant stage of decisionmaking processes to the fullest extent practicable, the program adopted by the Council under this subsection. If, and to the extent that, such other Federal agencies as a result of such consideration impose upon any non-Federal electric power project measures to protect, mitigate, and enhance fish and wildlife which are not attributable to the development and operation of such project, then the resulting monetary costs and power losses (if any) shall be borne by the Administrator in accordance with this subsection.
- (B) The Administrator and such Federal agencies shall consult with the Secretary of the Interior, the Administrator of the National Marine Fisheries Service, and the State fish and wildlife agencies of the region, appropriate Indian tribes, and affected project operators in carrying out the provisions of this paragraph and shall, to the greatest extent practicable, coordinate their actions.
- (A) The Administrator and other Federal agencies responsible for managing, operating, or regulating Federal or non-Federal hydroelectric facilities located on the Columbia River or its tributaries shall—
- (12)
- (A) Beginning on October 1 of the first fiscal year after all members to the Council are appointed initially, the Council shall submit annually a detailed report to the Committee on Energy and Natural Resources of the Senate and to the Committees on Energy and Commerce and on Natural Resources of the House of Representatives. The report shall describe the actions taken and to be taken by the Council under this chapter, including this subsection, the effectiveness of the fish and wildlife program, and potential revisions or modifications to the program to be included in the plan when adopted. At least ninety days prior to its submission of such report, the Council shall make available to such fish and wildlife agencies, and tribes, the Administrator and the customers a draft of such report. The Council shall establish procedures for timely comments thereon. The Council shall include as an appendix to such report such comments or a summary thereof.
- (B) The Administrator shall keep such committees fully and currently informed of the actions taken and to be taken by the Administrator under this chapter, including this subsection.
- (1)
- (i) The Council may from time to time review the actions of the Administrator pursuant to this section and section 839d of this title to determine whether such actions are consistent with the plan and programs, the extent to which the plan and programs is being implemented, and to assist the Council in preparing amendments to the plan and programs.
- (j)
- (1) The Council may request the Administrator to take an action under section 839d of this title to carry out the Administrator’s responsibilities under the plan.
- (2) To the greatest extent practicable within ninety days after the Council’s request, the Administrator shall respond to the Council in writing specifying—
- (A) the means by which the Administrator will undertake the action or any modification thereof requested by the Council, or
- (B) the reasons why such action would not be consistent with the plan, or with the Administrator’s legal obligations under this chapter, or other provisions of law, which the Administrator shall specifically identify.
- (3) If the Administrator determines not to undertake the requested action, the Council, within sixty days after notice of the Administrator’s determination, may request the Administrator to hold an informal hearing and make a final decision.
- (k)
- (1) Not later than October 1, 1987 , or six years after the Council is established under this chapter, whichever is later, the Council shall complete a thorough analysis of conservation measures and conservation resources implemented pursuant to this chapter during the five-year period beginning on the date the Council is established under this chapter to determine if such measures or resources:
- (A) have resulted or are likely to result in costs to consumers in the region greater than the costs of additional generating resources or additional fuel which the Council determines would be necessary in the absence of such measures or resources;
- (B) have not been or are likely not to be generally equitable to all consumers in the region; or
- (C) have impaired or are likely to impair the ability of the Administrator to carry out his obligations under this chapter and other laws, consistent with sound business practices.
- (2) The Administrator may determine that section 839a(4)(D) of this title shall not apply to any proposed conservation measure or resource if the Administrator finds after receipt of such analysis from the Council that such measure or resource would have any result or effect described in subparagraph (A), (B) or (C) of paragraph (1).
- (1) Not later than October 1, 1987 , or six years after the Council is established under this chapter, whichever is later, the Council shall complete a thorough analysis of conservation measures and conservation resources implemented pursuant to this chapter during the five-year period beginning on the date the Council is established under this chapter to determine if such measures or resources:
§ 839c. Sale of power
- (a) All power sales under this chapter shall be subject at all times to the preference and priority provisions of the Bonneville Project Act of 1937 ( 16 U.S.C. 832 and following) and, in particular, sections 4 and 5 thereof [ 16 U.S.C. 832c and 832d]. Such sales shall be at rates established pursuant to section 839e of this title .
- (b)
- (1) Whenever requested, the Administrator shall offer to sell to each requesting public body and cooperative entitled to preference and priority under the Bonneville Project Act of 1937 [ 16 U.S.C. 832 et seq.] and to each requesting investor-owned utility electric power to meet the firm power load of such public body, cooperative or investor-owned utility in the Region to the extent that such firm power load exceeds—
- (A) the capability of such entity’s firm peaking and energy resources used in the year prior to December 5, 1980 , to serve its firm load in the region, and
- (B) such other resources as such entity determines, pursuant to contracts under this chapter, will be used to serve its firm load in the region.
- (2) Contracts with investor-owned utilities shall provide that the Administrator may reduce his obligations under such contracts in accordance with section 5(a) of the Bonneville Project Act of 1937 [ 16 U.S.C. 832d(a) ].
- (3) In addition to his authorities to sell electric power under paragraph (1), the Administrator is also authorized to sell electric power to Federal agencies in the region.
- (4) Sales under this subsection shall be made only if the public body, cooperative, Federal agency or investor-owned utility complies with the Administrator’s standards for service in effect on December 5, 1980 , or as subsequently revised.
- (5) The Administrator shall include in contracts executed in accordance with this subsection provisions that enable the Administrator to restrict his contractual obligations to meet the loads referred to in this subsection in the future if the Administrator determines, after a reasonable period of experience under this chapter, that the Administrator cannot be assured on a planning basis of acquiring sufficient resources to meet such loads during a specified period of insufficiency. Any such contract with a public body, cooperative, or Federal agency shall specify a reasonable minimum period between a notice of restriction and the earliest date such restriction may be imposed.
- (6) Contracts executed in accordance with this subsection with public body, cooperative, and Federal agency customers shall—
- (A) provide that the restriction referred to in paragraph (5) shall not be applicable to any such customers until the operating year in which the total of such customers’ firm loads to be served by the Administrator equals or exceeds the firm capability of the Federal base system resources;
- (B) not permit restrictions which would reduce the total contractual entitlement of such customers to an amount less than the firm capability of the Federal base system resources; and
- (C) contain a formula for determining annually, on a uniform basis, each such customer’s contractual entitlement to firm power during such a period of restriction, which formula shall not consider customer resources other than those the customer has determined, as of December 5, 1980 , to be used to serve its own firm loads.
- (7)
- (A) In this section, the term “joint operating entity” means an entity that is lawfully organized under State law as a public body or cooperative prior to September 22, 2000 , and is formed by and whose members or participants are two or more public bodies or cooperatives, each of which was a customer of the Bonneville Power Administration on or before January 1, 1999 .
- (B) Pursuant to paragraph (1), the Administrator shall sell, at wholesale to a joint operating entity, electric power solely for the purpose of meeting the regional firm power consumer loads of regional public bodies and cooperatives that are members of or participants in the joint operating entity.
- (C) A public body or cooperative to which a joint operating entity sells electric power under subparagraph (B) shall not resell that power except to retail customers of the public body or cooperative or to another regional member or participant of the same joint operating entity, or except as otherwise permitted by law.
- (1) Whenever requested, the Administrator shall offer to sell to each requesting public body and cooperative entitled to preference and priority under the Bonneville Project Act of 1937 [ 16 U.S.C. 832 et seq.] and to each requesting investor-owned utility electric power to meet the firm power load of such public body, cooperative or investor-owned utility in the Region to the extent that such firm power load exceeds—
- (c)
- (1) Whenever a Pacific Northwest electric utility offers to sell electric power to the Administrator at the average system cost of that utility’s resources in each year, the Administrator shall acquire by purchase such power and shall offer, in exchange, to sell an equivalent amount of electric power to such utility for resale to that utility’s residential users within the region.
- (2) The purchase and exchange sale referred to in paragraph (1) of this subsection with any electric utility shall be limited to an amount not in excess of 50 per centum of such utility’s Regional residential load in the year beginning July 1, 1980 , such 50 per centum limit increasing in equal annual increments to 100 per centum of such load in the year beginning July 1, 1985 , and each year thereafter.
- (3) The cost benefits, as specified in contracts with the Administrator, of any purchase and exchange sale referred to in paragraph (1) of this subsection which are attributable to any electric utility’s residential load within a State shall be passed through directly to such utility’s residential loads within such State, except that a State which lies partially within and partially without the region may require that such cost benefits be distributed among all of the utility’s residential loads in that State.
- (4) An electric utility may terminate, upon reasonable terms and conditions agreed to by the Administrator and such utility prior to such termination, its purchase and sale under this subsection if the supplemental rate charge provided for in section 839e(b)(3) of this title is applied and the cost of electric power sold to such utility under this subsection exceeds, after application of such rate charge, the average system cost of power sold by such utility to the Administrator under this subsection.
- (5) Subject to the provisions of sections 839b and 839d of this title, in lieu of purchasing any amount of electric power offered by a utility under paragraph (1) of this subsection, the Administrator may acquire an equivalent amount of electric power from other sources to replace power sold to such utility as part of an exchange sale if the cost of such acquisition is less than the cost of purchasing the electric power offered by such utility.
- (6) Exchange sales to a utility pursuant to this subsection shall not be restricted below the amounts of electric power acquired by the Administrator from, or on behalf of, such utility pursuant to this subsection.
- (7) The “average system cost” for electric power sold to the Administrator under this subsection shall be determined by the Administrator on the basis of a methodology developed for this purpose in consultation with the Council, the Administrator’s customers, and appropriate State regulatory bodies in the region. Such methodology shall be subject to review and approval by the Federal Energy Regulatory Commission. Such average system cost shall not include—
- (A) the cost of additional resources in an amount sufficient to serve any new large single load of the utility;
- (B) the cost of additional resources in an amount sufficient to meet any additional load outside the region occurring after December 5, 1980 ; and
- (C) any costs of any generating facility which is terminated prior to initial commercial operation.
- (d)
- (1)
- (A) The Administrator is authorized to sell in accordance with this subsection electric power to existing direct service industrial customers. Such sales shall provide a portion of the Administrator’s reserves for firm power loads within the region.
- (B) After December 5, 1980 , the Administrator shall offer in accordance with subsection (g) of this section to each existing direct service industrial customer an initial long term contract that provides such customer an amount of power equivalent to that to which such customer is entitled under its contract dated January or April 1975 providing for the sale of “industrial firm power.”
- (2) The Administrator shall not sell electric power, including reserves, directly to new direct service industrial customers.
- (3) The Administrator shall not sell amounts of electric power, including reserves, to existing direct service industrial customers in excess of the amount permitted under paragraph (1) unless the Administrator determines, after a plan has been adopted pursuant to section 839b of this title , that such proposed sale is consistent with the plan and that—
- (A) additional power system reserves are required for the region’s firm loads,
- (B) the proposed sale would provide a cost-effective method of supplying such reserves,
- (C) such loads or loads of similar character cannot provide equivalent operating or planning benefits to the region if served by an electric utility under contractual arrangements providing reserves, and
- (D) the Administrator has or can acquire sufficient electric power to serve such loads, and
- (4)
- (A) As used in this section, the term “existing direct service industrial customer” means any direct service industrial customer of the Administrator which has a contract for the purchase of electric power from the Administrator on December 5, 1980 .
- (B) The term “new direct service industrial customer” means any industrial entity other than an existing direct service industrial customer.
- (C)
- (i) Where a new contract is offered in accordance with subsection (g) to any existing direct service industrial customer which has not received electric power prior to December 5, 1980 , from the Administrator pursuant to a contract with the Administrator existing on December 5, 1980 , electric power delivered under such new contract shall be conditioned on the Administrator reasonably acquiring, in accordance with this chapter and within such estimated period of time (as specified in the contract) as he deems reasonable, sufficient resources to meet, on a planning basis, the load requirement of such customer. Such contract shall also provide that the obligation of the Administrator to acquire such resources to meet such load requirement shall, except as provided in clause (ii) of this subparagraph, apply only to such customer and shall not be sold or exchanged by such customer to any other person.
- (ii) Rights under a contract described in clause (i) of this subparagraph may be transferred by an existing direct service industrial customer referred to in clause (i) to a successor in interest in connection with a reorganization or other transfer of all major assets of such customer. Following such a transfer, such successor in interest (or any other subsequent successor in interest) may also transfer rights under such a contract only in connection with a reorganization or other transfer of all assets of such successor in interest.
- (iii) The limitations of clause (i) of this subparagraph shall not apply to any customer referred to in clause (i) whenever the Administrator determines that such customer is receiving electric power pursuant to a contract referred to in such clause (ii).
- (1)
- (e)
- (1) The contractual entitlement to firm power of any customer from whom, or on whose behalf, the Administrator has acquired electric power pursuant to section 839d of this title may not be restricted below the amount of electric power so acquired from, or on behalf of, such customer. If in any year such customer’s requirements are less than such entitlement, any excess of such entitlement shall be first made available to increase the entitlement of other customers of the same class before being available for the entitlement of other customers. For purposes of this paragraph, the following entities shall each constitute a class:
- (A) public bodies and cooperatives;
- (B) Federal agencies;
- (C) direct service industrial; and
- (D) investor owned utilities.
- (2) Any contractual entitlement to firm power which is based on electric power acquired from, or on behalf of, a customer pursuant to section 839d of this title shall be in addition to any other contractual entitlement to firm power not subject to restriction that such customer may have under this section. For the purposes of this subsection, references to amounts of power acquired by the Administrator pursuant to section 839d of this title shall be deemed to mean the amounts specified in the resource acquisition contracts exclusive of any amounts recognized in such contracts as replacement for Federal base system resources.
- (3) The Administrator shall, consistent with the provisions of this chapter, insure that any restrictions upon any particular customer class made pursuant to this subsection and subsection (b) of this section are distributed equitably throughout the region.
- (1) The contractual entitlement to firm power of any customer from whom, or on whose behalf, the Administrator has acquired electric power pursuant to section 839d of this title may not be restricted below the amount of electric power so acquired from, or on behalf of, such customer. If in any year such customer’s requirements are less than such entitlement, any excess of such entitlement shall be first made available to increase the entitlement of other customers of the same class before being available for the entitlement of other customers. For purposes of this paragraph, the following entities shall each constitute a class:
- (f) The Administrator is authorized to sell, or otherwise dispose of, electric power, including power acquired pursuant to this and other Acts, that is surplus to his obligations incurred pursuant to subsections (b), (c), and (d) of this section in accordance with this and other Acts applicable to the Administrator, including the Bonneville Project Act of 1937 ( 16 U.S.C. 832 and following), the Federal Columbia River Transmission System Act ( 16 U.S.C. 838 and following), and the Act of August 31, 1964 ( 16 U.S.C. 837–837h ).
- (g)
- (1) As soon as practicable within nine months after December 5, 1980 , the Administrator shall commence necessary negotiations for, and offer, initial long-term contracts (within the limitations of the third sentence of section 5(a) of the Bonneville Project Act [ 16 U.S.C. 832d(a) ]) simultaneously to—
- (A) existing public body and cooperative customers and investor-owned utility customers under subsection (b) of this section;
- (B) Federal agency customers under subsection (b) of this section;
- (C) electric utility customers under subsection (c) of this section; and
- (D) direct service industrial customers under subsection (d)(1).
- (2) Each customer offered a contract pursuant to this subsection shall have one year from the date of such offer to accept such contract. Such contract shall be effective as provided in this subsection.
- (3) An initial contract with a public body, cooperative or investor-owned electric utility customer or a Federal agency customer pursuant to subsection (b) of this section shall be effective on the date executed by such customer, unless another effective date is otherwise agreed to by the Administrator and the customer.
- (4) An initial contract with an electric utility customer pursuant to subsection (c) of this section shall be effective on the date executed by such customer, but no earlier than the first day of the tenth month after December 5, 1980 .
- (5) An initial contract with a direct service industrial customer pursuant to subsection (d)(1), shall be effective on the date agreed upon by the Administrator and such customer, but no later than the first day of the tenth month after December 5, 1980 . When such contract is executed, it may for rate purposes be given retroactive effect to such first day.
- (6) Initial contracts offered public body, cooperative and Federal agency customers in accordance with this subsection shall provide that during a period of insufficiency declared in accordance with subsection (b) of this section each customer’s contractual entitlement shall, to the extent of its requirements on the Administrator, be no less than the amount of firm power received from the Administrator in the year immediately preceding the period of insufficiency.
- (7) The Administrator shall be deemed to have sufficient resources for the purpose of entering into the initial contracts specified in paragraph (1)(A) through (D).
- (1) As soon as practicable within nine months after December 5, 1980 , the Administrator shall commence necessary negotiations for, and offer, initial long-term contracts (within the limitations of the third sentence of section 5(a) of the Bonneville Project Act [ 16 U.S.C. 832d(a) ]) simultaneously to—
§ 839d. Conservation and resource acquisition
- (a)
- (1) The Administrator shall acquire such resources through conservation, implement all such conservation measures, and acquire such renewable resources which are installed by a residential or small commercial consumer to reduce load, as the Administrator determines are consistent with the plan, or if no plan is in effect with the criteria of section 839b(e)(1) of this title and the considerations of section 839b(e)(2) of this title and, in the case of major resources, in accordance with subsection (c) of this section. Such conservation measures and such resources may include, but are not limited to—
- (A) loans and grants to consumers for insulation or weatherization, increased system efficiency, and waste energy recovery by direct application,
- (B) technical and financial assistance to, and other cooperation with, the Administrator’s customers and governmental authorities to encourage maximum cost-effective voluntary conservation and the attainment of any cost-effective conservation objectives adopted by individual States or subdivisions thereof,
- (C) aiding the Administrator’s customers and governmental authorities in implementing model conservation standards adopted pursuant to section 839b(f) of this title , and
- (D) conducting demonstration projects to determine the cost effectiveness of conservation measures and direct application of renewable energy resources.
- (2) In addition to acquiring electric power pursuant to section 839c(c) of this title , or on a short-term basis pursuant to section 11(b)(6)(i) of the Federal Columbia River Transmission System Act [ 16 U.S.C. 838i(b)(6)(i) ], the Administrator shall acquire, in accordance with this section, sufficient resources—
- (A) to meet his contractual obligations that remain after taking into account planned savings from measures provided for in paragraph (1) of this subsection, and
- (B) to assist in meeting the requirements of section 839b(h) of this title .
- (1) The Administrator shall acquire such resources through conservation, implement all such conservation measures, and acquire such renewable resources which are installed by a residential or small commercial consumer to reduce load, as the Administrator determines are consistent with the plan, or if no plan is in effect with the criteria of section 839b(e)(1) of this title and the considerations of section 839b(e)(2) of this title and, in the case of major resources, in accordance with subsection (c) of this section. Such conservation measures and such resources may include, but are not limited to—
- (b)
- (1) Except as specifically provided in this section, acquisition of resources under this chapter shall be consistent with the plan, as determined by the Administrator.
- (2) The Administrator may acquire resources (other than major resources) under this chapter which are not consistent with the plan, but which are determined by the Administrator to be consistent with the criteria of section 839b(e)(1) of this title and the considerations of section 839b(e)(2) of this title .
- (3) If no plan is in effect, the Administrator may acquire resources under this chapter which are determined by the Administrator to be consistent with the criteria of section 839b(e)(1) of this title and the considerations of section 839b(e)(2) of this title .
- (4) The Administrator shall acquire any non-Federal resources to replace Federal base system resources only in accordance with the provisions of this section. The Administrator shall include in the contracts for the acquisition of any such non-Federal replacement resources provisions which will enable him to ensure that such non-Federal replacement resources are developed and operated in a manner consistent with the considerations specified in section 839b(e)(2) of this title .
- (5) Notwithstanding any acquisition of resources pursuant to this section, the Administrator shall not reduce his efforts to achieve conservation and to acquire renewable resources installed by a residential or small commercial consumer to reduce load, pursuant to subsection (a)(1) of this section.
- (c)
- (1) For each proposal under subsection (a), (b), (f), (h), or ( l ) of this section to acquire a major resource, to implement a conservation measure which will conserve an amount of electric power equivalent to that of a major resource, to pay or reimburse investigation and preconstruction expenses of the sponsors of a major resource, or to grant billing credits or services involving a major resource, the Administrator shall—
- (A) publish notice of the proposed action in the Federal Register and provide a copy of such notice to the Council, the Governor of each State in which facilities would be constructed or a conservation measure implemented, and the Administrator’s customers;
- (B) not less than sixty days following publication of such notice, conduct one or more public hearings, presided over by a hearing officer, at which testimony and evidence shall be received, with opportunity for such rebuttal and cross-examination as the hearing officer deems appropriate in the development of an adequate hearing record;
- (C) develop a record to assist in evaluating the proposal which shall include the transcript of the public hearings, together with exhibits, and such other materials and information as may have been submitted to, or developed by, the Administrator; and
- (D) following completion of such hearings, promptly provide to the Council and make public a written decision that includes, in addition to a determination respecting the requirements of subsection (a), (b), (f), (h), ( l ), or (m) of this section, as appropriate—
- (i) if a plan is in effect, a finding that the proposal is either consistent or inconsistent with the plan or, notwithstanding its inconsistency with the plan, a finding that it is needed to meet the Administrator’s obligations under this chapter, or
- (ii) if no plan is in effect, a finding that the proposal is either consistent or inconsistent with the criteria of section 839b(e)(1) of this title and the considerations of section 839b(e)(2) of this title or notwithstanding its inconsistency, a finding that it is needed to meet the Administrator’s obligations under this chapter.
- (2) Within sixty days of the receipt of the Administrator’s decision pursuant to paragraph (1)(D) of this subsection, the Council may determine by a majority vote of all members of the Council, and notify the Administrator—
- (A) that the proposal is either consistent or inconsistent with the plan, or
- (B) if no plan is in effect, that the proposal is either consistent or inconsistent with the criteria of section 839b(e)(1) of this title and the considerations of section 839b(e)(2) of this title .
- (3) The Administrator may not implement any proposal referred to in paragraph (1) that is determined pursuant to paragraph (1) or (2) by either the Administrator or the Council to be inconsistent with the plan or, if no plan is in effect, with the criteria of section 839b(e)(1) of this title and the considerations of section 839b(e)(2) of this title —
- (A) unless the Administrator finds that, notwithstanding such inconsistency, such resource is needed to meet the Administrator’s obligations under this chapter, and
- (B) until the expenditure of funds for that purpose has been specifically authorized by Act of Congress enacted after December 5, 1980 .
- (4) Before the Administrator implements any proposal referred to in paragraph (1) of this subsection, the Administrator shall—
- (A) submit to the appropriate committees of the Congress the administrative record of the decision (including any determination by the Council under paragraph (2)) and a statement of the procedures followed or to be followed for compliance with the National Environmental Policy Act of 1969 [ 42 U.S.C. 4321 et seq.],
- (B) publish notice of the decision in the Federal Register, and
- (C) note the proposal in the Administrator’s annual or supplementary budget submittal made pursuant to the Federal Columbia River Transmission System Act ( 16 U.S.C. 838 and following).
- (5) The authority of the Council to make a determination under paragraph (2)(B) if no plan is in effect shall expire on the date two years after the establishment of the Council.
- (1) For each proposal under subsection (a), (b), (f), (h), or ( l ) of this section to acquire a major resource, to implement a conservation measure which will conserve an amount of electric power equivalent to that of a major resource, to pay or reimburse investigation and preconstruction expenses of the sponsors of a major resource, or to grant billing credits or services involving a major resource, the Administrator shall—
- (d) The Administrator is authorized to acquire a resource, other than a major resource, whether or not such resource meets the criteria of section 839b(e)(1) of this title and the considerations of section 839b(e)(2) of this title but which he determines is an experimental, developmental, demonstration, or pilot project of a type with a potential for providing cost-effective service to the region. The Administrator shall make no obligation for the acquisition of such resource until it is included in the annual budgets submitted to the Congress pursuant to the Federal Columbia River Transmission System Act [ 16 U.S.C. 838 et seq.].
- (e)
- (1) In order to effectuate the priority given to conservation measures and renewable resources under this chapter, the Administrator shall, to the maximum extent practicable, make use of his authorities under this chapter to acquire conservation measures and renewable resources, to implement conservation measures, and to provide credits and technical and financial assistance for the development and implementation of such resources and measures (including the funding of, and the securing of debt for, expenses incurred during the investigation and preconstruction of resources, as authorized in subsection (f) of this section).
- (2) To the extent conservation measures or acquisition of resources require direct arrangements with consumers, the Administrator shall make maximum practicable use of customers and local entities capable of administering and carrying out such arrangements.
- (f)
- (1) For resources which the Administrator determines may be eligible for acquisition under this section and satisfy the criteria of section 839b(e)(1) of this title and the considerations of section 839b(e)(2) of this title or, if a plan is in effect, to be consistent with the plan, the Administrator is authorized to enter into agreements with sponsors of—
- (A) a renewable resource, other than a major resource, to fund or secure debt incurred in the investigation and initial development of such resource, or
- (B) any other resource to provide for the reimbursement of the sponsor’s investigation and preconstruction expenses concerning such resource (which expenses shall not include procurement of capital equipment or construction material for such resource).
- (i) such resource is subsequently denied State siting approval or other necessary Federal or State permits, or approvals,
- (ii) such investigation subsequently demonstrates, as determined by the Administrator, that such resource does not meet the criteria of section 839b(e)(1) of this title and the considerations of section 839b(e)(2) of this title or is not acceptable because of environmental impacts, or
- (iii) after such investigation the Administrator determines not to acquire the resource and the sponsor determines not to construct the resource.
- (2) The Administrator may exercise the authority of this subsection only after he determines that the failure to do so would result in inequitable hardship to the consumers of such sponsors. The Administrator may provide reimbursement under this subsection only for expenses incurred after December 5, 1980 .
- (3) Any agreement under paragraph (1) of this subsection shall provide the Administrator an option to acquire any such resource, including a renewable resource, and shall include such other provisions, as the Administrator deems appropriate, for the Administrator’s recovery from such sponsors or any assignee of the sponsors, if such sponsor or assignee continues development of the resource, of any advances made by the Administrator pursuant to such agreement.
- (4) The Administrator shall not reimburse any expense incurred by the sponsors (except necessary expenses involved in the liquidation of the resource) after the date of a final denial of application for State siting approval or after the date the Administrator determines that the resource to be inconsistent with the plan or the criteria of section 839b(e)(1) of this title and the considerations of section 839b(e)(2) of this title .
- (1) For resources which the Administrator determines may be eligible for acquisition under this section and satisfy the criteria of section 839b(e)(1) of this title and the considerations of section 839b(e)(2) of this title or, if a plan is in effect, to be consistent with the plan, the Administrator is authorized to enter into agreements with sponsors of—
- (g) At the request of the appropriate State, any environmental impact statement which may be required with respect to a resource, to the extent determined possible by the Administrator in accordance with applicable law and regulations, may be prepared jointly and in coordination with any required environmental impact statement of the State or any other statement which serves the purpose of an environmental impact statement which is required by State law.
- (h)
- (1) If a customer so requests, the Administrator shall grant billing credits to such customer, and provide services to such customer at rates established for such services, for—
- (A) conservation activities independently undertaken or continued after December 5, 1980 , by such customer or political subdivision served by such customer which reduce the obligation of the Administrator that would otherwise have existed to acquire other resources under this chapter, or
- (B) resources constructed, completed, or acquired after December 5, 1980 , by a customer, an entity acting on behalf of such customer, or political subdivision served by the customer which reduce the obligation of the Administrator to acquire resources under this chapter. Such resources shall be renewable resources or multipurpose projects or other resources which are not inconsistent with the plan or, in the absence of a plan, not inconsistent with the criteria of section 839b(e)(1) of this title and the considerations of section 839b(e)(2) of this title .
- (2) The energy and capacity on which a credit under this subsection to a customer is based shall be the amount by which a conservation activity or resource actually changes the customer’s net requirement for supply of electric power or reserves from the Administrator.
- (3) The amount of credits for conservation under this subsection shall be set to credit the customer implementing or continuing the conservation activity for which the credit is granted for the savings resulting from such activity. The rate impact on the Administrator’s other customers of granting the credit shall be equal to the rate impact such customers would have experienced had the Administrator been obligated to acquire resources in an amount equal to that actually saved by the activity for which the credit is granted.
- (4) For resources other than conservation, the customer shall be credited for net costs actually incurred by such customer, an entity acting on behalf of such customer, or political subdivision served by such customer, in acquiring, constructing, or operating the resource for which the credit is granted. The rate impact to the Administrator’s other customers of granting the credit shall be no greater than the rate impact such customers would have experienced had the Administrator been obligated to acquire resources in an amount equal to that actually produced by the resource for which the credit is granted.
- (5) Retail rate structures which are voluntarily implemented by the Administrator’s customers and which induce conservation or installation of consumer-owned renewable resources shall be considered, for purposes of this subsection, to be (A) conservation activities independently undertaken or carried on by such customers, or (B) customer-owned renewable resources, and shall qualify for billing credits upon the same showing as that required for other conservation or renewable resource activities.
- (6) Prior to granting any credit or providing services pursuant to this subsection, the Administrator shall—
- (A) comply with the notice provisions of subsection (c) of this section, and include in such notice the methodology the Administrator proposes to use in determining the amount of any such credit;
- (B) include the cost of such credit in the Administrator’s annual or amended budget submittal to the Congress made pursuant to the Federal Columbia River Transmission System Act ( 16 U.S.C. 838(j) ) [ 16 U.S.C. 838 et seq.];
- (C) require that resources in excess of customer’s reasonable load growth shall have been offered to others for ownership, participation or other sponsorship pursuant to subsection (m) of this section, except in the case of conservation, multi-purpose projects uniquely suitable for development by the customer, or renewable resources; and
- (D) require that the operators of any generating resource for which a billing credit is to be granted agree to operate such resource in a manner compatible with the planning and operation of the region’s power system.
- (1) If a customer so requests, the Administrator shall grant billing credits to such customer, and provide services to such customer at rates established for such services, for—
- (i) Contracts for the acquisition of resources and for billing credits for major resources, including conservation activities, entered into pursuant to this section shall contain such terms and conditions, applicable after the contract is entered into, as will—
- (1) insure timely construction, scheduling, completion, and operation of resources,
- (2) insure that the costs of any acquisition are as low as reasonably possible, consistent (A) with sound engineering, operating, and safety practices, and (B) the protection, mitigation, and enhancement of fish and wildlife, including related spawning grounds and habitat affected by the development of such resources, and
- (3) insure that the Administrator exercises effective oversight, inspection, audit, and review of all aspects of such construction and operation.
- (j)
- (1) All contractual and other obligations required to be carried out by the Administrator pursuant to this chapter shall be secured solely by the Administrator’s revenues received from the sale of electric power and other services. Such obligations are not, nor shall they be construed to be, general obligations of the United States, nor are such obligations intended to be or are they secured by the full faith and credit of the United States.
- (2) All contracts entered into by the Administrator for the acquisition of resources pursuant to this chapter shall require that, in the sale of any obligations, all offerings and promotional material for the sale of such obligations shall include the language contained in the second sentence of paragraph (1) of this subsection. The Administrator shall monitor and enforce such requirement.
- (k) In the exercise of his authorities pursuant to this section, the Administrator shall, consistent with the provisions of this chapter and the Administrator’s obligations to particular customer classes, insure that benefits under this section, including financial and technical assistance, conduct of conservation demonstrations, and experimental projects, services, and billing credits, are distributed equitably throughout the region.
- (l)
- (1) The Administrator is authorized and directed to investigate opportunities for adding to the region’s resources or reducing the region’s power costs through the accelerated or cooperative development of resources located outside the States of Idaho, Montana, Oregon, and Washington if such resources are renewable resources, and are now or in the future planned or considered for eventual development by nonregional agencies or authorities that will or would own, sponsor, or otherwise develop them. The Administrator shall keep the Council fully and currently informed of such investigations, and seek the Council’s advice as to the desirability of pursuing such investigations.
- (2) The Administrator is authorized and directed to investigate periodically opportunities for mutually beneficial interregional exchanges of electric power that reduce the need for additional generation or generating capacity in the Pacific Northwest and the regions with which such exchanges may occur. The Council shall take into consideration in formulating a plan such investigations.
- (3) After the Administrator submits a report to Congress pursuant to paragraph (5) of this subsection, the Administrator is authorized to acquire resources consistent with such investigations and consistent with the plan or, if no plan is in effect, with the priorities of section 839b(e)(1) of this title and the considerations of section 839b(e)(2) of this title . Such acquisitions shall be in accordance with the provisions of this subsection.
- (4) The Administrator shall conduct the investigations and the acquisitions, if any, authorized under this subsection with the assistance of other Federal agencies as may be appropriate.
- (5) No later than July 1, 1981 , the Administrator shall submit to the Congress a report of the results of the investigations undertaken pursuant to this subsection, together with the prospects for obtaining additional resources under the authority granted by this subsection and for reductions in generation or generating capacity through exchanges.
- (m) Except as to resources under construction on December 5, 1980 , the Administrator shall determine in each case of a major resource acquisition that a reasonable share of the particular resource, or a reasonable equivalent, has been offered to each Pacific Northwest electric utility for ownership, participation, or other sponsorship, but not in excess of the amounts needed to meet such utility’s Regional load.
§ 839e. Rates
- (a)
- (1) The Administrator shall establish, and periodically review and revise, rates for the sale and disposition of electric energy and capacity and for the transmission of non-Federal power. Such rates shall be established and, as appropriate, revised to recover, in accordance with sound business principles, the costs associated with the acquisition, conservation, and transmission of electric power, including the amortization of the Federal investment in the Federal Columbia River Power System (including irrigation costs required to be repaid out of power revenues) over a reasonable period of years and the other costs and expenses incurred by the Administrator pursuant to this chapter and other provisions of law. Such rates shall be established in accordance with sections 9 and 10 of the Federal Columbia River Transmission System Act ( 16 U.S.C. 838 ) [ 16 U.S.C. 838g and 838h], section 5 of the Flood Control Act of 1944 [ 16 U.S.C. 825s ], and the provisions of this chapter.
- (2) Rates established under this section shall become effective only, except in the case of interim rules as provided in subsection (i)(6), upon confirmation and approval by the Federal Energy Regulatory Commission upon a finding by the Commission, that such rates—
- (A) are sufficient to assure repayment of the Federal investment in the Federal Columbia River Power System over a reasonable number of years after first meeting the Administrator’s other costs,
- (B) are based upon the Administrator’s total system costs, and
- (C) insofar as transmission rates are concerned, equitably allocate the costs of the Federal transmission system between Federal and non-Federal power utilizing such system.
- (b)
- (1) The Administrator shall establish a rate or rates of general application for electric power sold to meet the general requirements of public body, cooperative, and Federal agency customers within the Pacific Northwest, and loads of electric utilities under section 839c(c) of this title . Such rate or rates shall recover the costs of that portion of the Federal base system resources needed to supply such loads until such sales exceed the Federal base system resources. Thereafter, such rate or rates shall recover the cost of additional electric power as needed to supply such loads, first from the electric power acquired by the Administrator under section 839c(c) of this title and then from other resources.
- (2) After July 1, 1985 , the projected amounts to be charged for firm power for the combined general requirements of public body, cooperative and Federal agency customers, exclusive of amounts charged such customers under subsection (g) for the costs of conservation, resource and conservation credits, experimental resources and uncontrollable events, may not exceed in total, as determined by the Administrator, during any year after July 1, 1985 , plus the ensuing four years, an amount equal to the power costs for general requirements of such customers if, the Administrator assumes that—
- (A) the public body and cooperative customers’ general requirements had included during such five-year period the direct service industrial customer loads which are—
- (i) served by the Administrator, and
- (ii) located within or adjacent to the geographic service boundaries of such public bodies and cooperatives;
- (B) public body, cooperative, and Federal agency customers were served, during such five-year period, with Federal base system resources not obligated to other entities under contracts existing as of December 5, 1980 , (during the remaining term of such contracts) excluding obligations to direct service industrial customer loads included in subparagraph (A) of this paragraph;
- (C) no purchases or sales by the Administrator as provided in section 839c(c) of this title were made during such five-year period;
- (D) all resources that would have been required, during such five-year period, to meet remaining general requirements of the public body, cooperative and Federal agency customers (other than requirements met by the available Federal base system resources determined under subparagraph (B) of this paragraph) were—
- (i) purchased from such customers by the Administrator pursuant to section 839d of this title , or
- (ii) not committed to load pursuant to section 839c(b) of this title ,
- (E) the quantifiable monetary savings, during such five-year period, to public body, cooperative and Federal agency customers resulting from—
- (i) reduced public body and cooperative financing costs as applied to the total amount of resources, other than Federal base system resources, identified under subparagraph (D) of this paragraph, and
- (ii) reserve benefits as a result of the Administrator’s actions under this chapter 1 1 So in original. Probably should be followed by a comma.
- (A) the public body and cooperative customers’ general requirements had included during such five-year period the direct service industrial customer loads which are—
- (3) Any amounts not charged to public body, cooperative, and Federal agency customers by reason of paragraph (2) of this subsection shall be recovered through supplemental rate charges for all other power sold by the Administrator to all customers. Rates charged public body, cooperative, or Federal agency customers pursuant to this subsection shall not include any costs or benefits of a net revenue surplus or deficiency occurring for the period ending June 30, 1985 , to the extent such surplus or deficiency is caused by—
- (A) a difference between actual power deliveries and power deliveries projected for the purpose of establishing rates to direct service industrial customers under subsection (c)(1) of this subsection, and
- (B) an overrecovery or underrecovery of the net costs incurred by the Administrator under section 839c(c) of this title as a result of such difference.
- (4) The term “general requirements” as used in this section means the public body, cooperative or Federal agency customer’s electric power purchased from the Administrator under section 839c(b) of this title , exclusive of any new large single load.
- (c)
- (1) The rate or rates applicable to direct service industrial customers shall be established—
- (A) for the period prior to July 1, 1985 , at a level which the Administrator estimates will be sufficient to recover the cost of resources the Administrator determines are required to serve such customers’ load and the net costs incurred by the Administrator pursuant to section 839c(c) of this title , based upon the Administrator’s projected ability to make power available to such customers pursuant to their contracts, to the extent that such costs are not recovered through rates applicable to other customers; and
- (B) for the period beginning July 1, 1985 , at a level which the Administrator determines to be equitable in relation to the retail rates charged by the public body and cooperative customers to their industrial consumers in the region.
- (2) The determination under paragraph (1)(B) of this subsection shall be based upon the Administrator’s applicable wholesale rates to such public body and cooperative customers and the typical margins included by such public body and cooperative customers in their retail industrial rates but shall take into account—
- (A) the comparative size and character of the loads served,
- (B) the relative costs of electric capacity, energy, transmission, and related delivery facilities provided and other service provisions, and
- (C) direct and indirect overhead costs,
- (3) The Administrator shall adjust such rates to take into account the value of power system reserves made available to the Administrator through his rights to interrupt or curtail service to such direct service industrial customers.
- (1) The rate or rates applicable to direct service industrial customers shall be established—
- (d)
- (1) In order to avoid adverse impacts on retail rates of the Administrator’s customers with low system densities, the Administrator shall, to the extent appropriate, apply discounts to the rate or rates for such customers.
- (2) In order to avoid adverse impacts of increased rates pursuant to this chapter on any direct service industrial customer using raw minerals indigenous to the region as its primary resource, the Administrator, upon request of such customer showing such impacts and after considering the effect of such request on his other obligations under this chapter, is authorized, if the Administrator determines that such impacts will be significant, to establish a special rate applicable to such customer if all power sold to such customer may be interrupted, curtailed, or withdrawn to meet firm loads in the region. Such rate shall be established in accordance with this section and shall include such terms and conditions as the Administrator deems appropriate.
- (e) Nothing in this chapter prohibits the Administrator from establishing, in rate schedules of general application, a uniform rate or rates for sale of peaking capacity or from establishing time-of-day, seasonal rates, or other rate forms.
- (f) Rates for all other firm power sold by the Administrator for use in the Pacific Northwest shall be based upon the cost of the portions of Federal base system resources, purchases of power under section 839c(c) of this title and additional resources which, in the determination of the Administrator, are applicable to such sales.
- (g) Except to the extent that the allocation of costs and benefits is governed by provisions of law in effect on December 5, 1980 , or by other provisions of this section, the Administrator shall equitably allocate to power rates, in accordance with generally accepted ratemaking principles and the provisions of this chapter, all costs and benefits not otherwise allocated under this section, including, but not limited to, conservation, fish and wildlife measures, uncontrollable events, reserves, the excess costs of experimental resources acquired under section 839d of this title , the cost of credits granted pursuant to section 839d of this title , operating services, and the sale of or inability to sell excess electric power.
- (h) Notwithstanding any other provision of this section (except the provisions of subsection (a) of this section), the Administrator shall adjust power rates to include any surcharges arising under section 839b(f) of this title , and shall allocate any revenues from such charges in such manner as the Administrator determines will help achieve the purposes of section 839b(f) of this title .
- (i) In establishing rates under this section, the Administrator shall use the following procedures:
- (1) Notice of the proposed rates shall be published in the Federal Register with a statement of the justification and reasons supporting such rates. Such notice shall include a date for a hearing in accordance with paragraph (2) of this subsection.
- (2) One or more hearings shall be conducted as expeditiously as practicable by a hearing officer to develop a full and complete record and to receive public comment in the form of written and oral presentation of views, data, questions, and argument related to such proposed rates. In any such hearing—
- (A) any person shall be provided an adequate opportunity by the hearing officer to offer refutation or rebuttal of any material submitted by any other person or the Administrator, and
- (B) the hearing officer, in his discretion, shall allow a reasonable opportunity for cross examination, which, as determined by the hearing officer, is not dilatory, in order to develop information and material relevant to any such proposed rate.
- (3) In addition to the opportunity to submit oral and written material at the hearings, any written views, data, questions, and arguments submitted by persons prior to, or before the close of, hearings shall be made a part of the administrative record.
- (4) After such a hearing, the Administrator may propose revised rates, publish such proposed rates in the Federal Register, and conduct additional hearings in accordance with this subsection.
- (5) The Administrator shall make a final decision establishing a rate or rates based on the record which shall include the hearing transcript, together with exhibits, and such other materials and information as may have been submitted to, or developed by, the Administrator. The decision shall include a full and complete justification of the final rates pursuant to this section.
- (6) The final decision of the Administrator shall become effective on confirmation and approval of such rates by the Federal Energy Regulatory Commission pursuant to subsection (a)(2) of this section. The Commission shall have the authority, in accordance with such procedures, if any, as the Commission shall promptly establish and make effective within one year after December 5, 1980 , to approve the final rate submitted by the Administrator on an interim basis, pending the Commission’s final decision in accordance with such subsection. Pending the establishment of such procedures by the Commission, if such procedures are required, the Secretary is authorized to approve such interim rates during such one-year period in accordance with the applicable procedures followed by the Secretary prior to December 5, 1980 . Such interim rates, at the discretion of the Secretary, shall continue in effect until July 1, 1982 .
- (j) All rate schedules adopted, and all power billings rendered, by the Administrator pursuant to this section shall indicate—
- (1) the approximate cost contribution of different resource categories to the Administrator’s rates for the sale of energy and capacity, and
- (2) the cost of resources acquired to meet load growth within the region and the relation of such cost to the average cost of resources available to the Administrator.
- (k) Notwithstanding any other provision of this chapter, all rates or rate schedules for the sale of nonfirm electric power within the United States, but outside the region, shall be established after December 5, 1980 , by the Administrator in accordance with the procedures of subsection (i) of this section (other than the first sentence of paragraph (6) thereof) and in accordance with the Bonneville Project Act [ 16 U.S.C. 832 et seq.], the Flood Control Act of 1944, and the Federal Columbia River Transmission System Act [ 16 U.S.C. 838 et seq.]. Notwithstanding section 201(f) of the Federal Power Act [ 16 U.S.C. 824(f) ], such rates or rate schedules shall become effective after review by the Federal Energy Regulatory Commission for conformance with the requirements of such Acts and after approval thereof by the Commission. Such review shall be based on the record of proceedings established under subsection (i) of this section. The parties to such proceedings under subsection (i) shall be afforded an opportunity by the Commission for an additional hearing in accordance with the procedures established for ratemaking by the Commission pursuant to the Federal Power Act [ 16 U.S.C. 791a et seq.].
- (l) In order to further the purposes of this chapter and to protect the consumers of the region, the Administrator may negotiate, or establish, rates for electric power sold by the Administrator to any entity not located in the United States which shall be equitable in relation to rates for all electric power which is, or may be, purchased by the Administrator or the Administrator’s customers from entities outside the United States. In establishing rates other than by negotiation, the provisions of subsection (i) shall apply. In the case of any negotiation with an entity not located in the United States, the Administrator shall provide public notice of any proposal to negotiate such rates. Such negotiated rates shall be not less than the rates established under this chapter for nonfirm power sold within the United States but outside the region. The Administrator shall also afford notice of any rates negotiated pursuant to this subsection.
- (m)
- (1) Beginning the first fiscal year after the plan and program required by section 839b(d) and (h) of this title are finally adopted, the Administrator may, subject to the provisions of this section, make annual impact aid payments to the appropriate local governments within the region with respect to major transmission facilities of the Administrator, as defined in section 3(c) of the Federal Columbia River Transmission Act [ 16 U.S.C. 838a(c) ]—
- (A) which are located within the jurisdictional boundaries of such governments,
- (B) which are determined by the Administrator to have a substantial impact on such governments, and
- (C) where the construction of such facilities, or any modification thereof, is completed after December 5, 1980 , and, in the case of a modification of an existing facility, such modification substantially increases the capacity of such existing transmission facility.
- (2) Payments made under this subsection for any fiscal year shall be determined by the Administrator pursuant to a regionwide, uniform formula to be established by rule in accordance with the procedures set forth in subsection (i) of this section. Such rule shall become effective on its approval, after considering its effect on rates established pursuant to this section, by the Federal Energy Regulatory Commission. In developing such formula, the Administrator shall identify, and take into account, the local governmental services provided to the Administrator concerning such facilities and the associated costs to such governments as the result of such facilities.
- (3) Payments made pursuant to this subsection shall be made solely from the fund established by section 11 of the Federal Columbia River Transmission System Act [ 16 U.S.C. 838i ]. The provisions of section 13 of such Act [ 16 U.S.C. 838k ], and any appropriations provided to the Administrator under any law, shall not be available for such payments. The authorization of payments under this subsection shall not be construed as an obligation of the United States.
- (4) No payment may be made under this subsection with respect to any land or interests in land owned by the United States within the region and administered by any Federal agency (other than the Administrator), without regard to how the United States obtained ownership thereof, including lands or interests therein acquired or withdrawn by a Federal agency for purposes of such agency and subsequently made available to the Administrator for such facilities.
- (1) Beginning the first fiscal year after the plan and program required by section 839b(d) and (h) of this title are finally adopted, the Administrator may, subject to the provisions of this section, make annual impact aid payments to the appropriate local governments within the region with respect to major transmission facilities of the Administrator, as defined in section 3(c) of the Federal Columbia River Transmission Act [ 16 U.S.C. 838a(c) ]—
- (n) Notwithstanding any other provision of this section, rates established by the Administrator, under this section shall recover costs for protection, mitigation and enhancement of fish and wildlife, whether under this chapter or any other Act, not to exceed such amounts the Administrator forecasts will be expended during the fiscal year 2002–2006 rate period, while preserving the Administrator’s ability to establish appropriate reserves and maintain a high Treasury payment probability for the subsequent rate period.
§ 839f. Administrative provisions
- (a) Subject to the provisions of this chapter, the Administrator is authorized to contract in accordance with section 2(f) of the Bonneville Project Act of 1937 ( 16 U.S.C. 832a(f) ). Other provisions of law applicable to such contracts on December 5, 1980 , shall continue to be applicable.
- (b) The Administrator shall discharge the executive and administrative functions of his office in accordance with the policy established by the Bonneville Project Act of 1937 ( 16 U.S.C. 832 and following), section 7152(a)(2) and (3) of title 42, and this chapter. The Secretary of Energy, the Council, and the Administrator shall take such steps as are necessary to assure the timely implementation of this chapter in a sound and businesslike manner. Nothing in this chapter shall be construed by the Secretary, the Administrator, or any other official of the Department of Energy to modify, alter, or otherwise affect the requirements and directives expressed by the Congress in section 7152(a)(2) and (3) of title 42 or the operations of such officials as they existed prior to December 5, 1980 .
- (c) Any contract of the Administrator for the sale or exchange of electric power for use outside the Pacific Northwest shall be subject to limitations and conditions corresponding to those provided in sections 2 and 3 of the Act of August 31, 1964 ( 16 U.S.C. 837a and 837b) for any contract for the sale, delivery, or exchange of hydroelectric energy or peaking capacity generated within the Pacific Northwest for use outside the Pacific Northwest. In applying such sections for the purposes of this subsection, the term “surplus energy” shall mean electric energy for which there is no market in the Pacific Northwest at any rate established for the disposition of such energy, and the term “surplus peaking capacity” shall mean electric peaking capacity for which there is no demand in the Pacific Northwest at the rate established for the disposition of such capacity. The authority granted, and duties imposed upon, the Secretary by sections 5 and 7 of such Act ( 16 U.S.C. 837e and 837f) [ 16 U.S.C. 837d and 837f] shall also apply to the Administrator in connection with resources acquired by the Administrator pursuant to this chapter. The Administrator shall, in making any determination, under any contract executed pursuant to section 839c of this title , of the electric power requirements of any Pacific Northwest customer, which is a non-Federal entity having its own generation, exclude, in addition to hydroelectric generated energy excluded from such requirements pursuant to section 3(d) of such Act ( 16 U.S.C. 837b(d) ), any amount of energy included in the resources of such customer for service to firm loads in the region if (1) such amount was disposed of by such customer outside the region, and (2) as a result of such disposition, the firm energy requirements of such customer or other customers of the Administrator are increased. Such amount of energy shall not be excluded, if the Administrator determines that through reasonable measures such amount of energy could not be conserved or otherwise retained for service to regional loads. The Administrator may sell as replacement for any amount of energy so excluded only energy that would otherwise be surplus.
- (d) No restrictions contained in subsection (c) shall limit or interfere with the sale, exchange or other disposition of any power by any utility or group thereof from any existing or new non-Federal resource if such sale, exchange or disposition does not increase the amount of firm power the Administrator would be obligated to provide to any customer. In addition to the directives contained in subsections (i)(1)(B) and (i)(3) and subject to:
- (1) any contractual obligations of the Administrator,
- (2) any other obligations under existing law, and
- (3) the availability of capacity in the Federal transmission system,
- (e)
- (1) For purposes of sections 701 through 706 of title 5, the following actions shall be final actions subject to judicial review—
- (A) adoption of the plan or amendments thereto by the Council under section 839b of this title , adoption of the program by the Council, and any determination by the Council under section 839b(h) of this title ;
- (B) sales, exchanges, and purchases of electric power under section 839c of this title ;
- (C) the Administrator’s acquisition of resources under section 839d of this title ;
- (D) implementation of conservation measures under section 839d of this title ;
- (E) execution of contracts for assistance to sponsors under section 839d(f) of this title ;
- (F) granting of credits under section 839d(h) of this title ;
- (G) final rate determinations under section 839e of this title ; and
- (H) any rule prescribed by the Administrator under section 839e(m)(2) of this title .
- (2) The record upon review of such final actions shall be limited to the administrative record compiled in accordance with this chapter. The scope of review of such actions without a hearing or after a hearing shall be governed by section 706 of title 5 , except that final determinations regarding rates under section 839e of this title shall be supported by substantial evidence in the rulemaking record required by section 839e(i) of this title considered as a whole. The scope of review of an action under section 839d(c) of this title shall be governed by section 706 of title 5 . Nothing in this section shall be construed to require a hearing pursuant to section 554, 556, or 557 of title 5.
- (3) Nothing in this section shall be construed to preclude judicial review of other final actions and decisions by the Council or Administrator.
- (4) For purposes of this subsection—
- (A) major resources shall be deemed to be acquired upon publication in the Federal Register pursuant to section 839d(c)(4)(B) of this title ;
- (B) resources, other than major resources, shall be deemed to be acquired upon execution of the contract therefor;
- (C) conservation measures shall be deemed to be implemented upon execution of the contract or grant therefor; and
- (D) rate determinations pursuant to section 839e of this title shall be deemed final upon confirmation and approval by the Federal Energy Regulatory Commission.
- (5) Suits to challenge the constitutionality of this chapter, or any action thereunder, final actions and decisions taken pursuant to this chapter by the Administrator or the Council, or the implementation of such final actions, whether brought pursuant to this chapter, the Bonneville Project Act [ 16 U.S.C. 832 et seq.], the Act of August 31, 1964 ( 16 U.S.C. 837–837h ), or the Federal Columbia River Transmission System Act ( 16 U.S.C. 838 and following), shall be filed in the United States court of appeals for the region. Such suits shall be filed within ninety days of the time such action or decision is deemed final, or, if notice of the action is required by this chapter to be published in the Federal Register, within ninety days from such notice, or be barred. In the case of a challenge of the plan or programs or amendments thereto, such suit shall be filed within sixty days after publication of a notice of such final action in the Federal Register. Such court shall have jurisdiction to hear and determine any suit brought as provided in this section. The plan and program, as finally adopted or portions thereof, or amendments thereto, shall not thereafter be reviewable as a part of any other action under this chapter or any other law. Suits challenging any other actions under this chapter shall be filed in the appropriate court.
- (1) For purposes of sections 701 through 706 of title 5, the following actions shall be final actions subject to judicial review—
- (f) For purposes of enabling the Administrator to acquire resources necessary to meet the firm load of public bodies, cooperatives, and Federal agencies from a governmental unit at a cost no greater than the cost which would be applicable in the absence of such acquisition, the exemption from gross income of interest on certain governmental obligations provided in section 103(a)(1) 1 1 See References in Text note below. of title 26 shall not be affected by the Administrator’s acquisition of such resources if—
- (1) the Administrator, prior to contracting for such acquisition, certifies to his reasonable belief, that the persons for whom the Administrator is acquiring such resources for sale pursuant to section 839c of this title are public bodies, cooperatives, and Federal agencies, unless the Administrator also certifies that he is unable to acquire such resources without selling a portion thereof to persons who are not exempt persons (as defined in section 103(b) 1 of title 26), and
- (2) based upon such certification, the Secretary of the Treasury determines in accordance with applicable regulations that less than a major portion of the resource is to be furnished to persons who are not exempt persons (as defined in section 103(b) 1 of title 26).
- (g) When reviewing rates for the sale of power to the Administrator by an investor-owned utility customer under section 839c(c) or 839d of this title, the Federal Energy Regulatory Commission shall, in accordance with section 824h of this title —
- (1) convene a joint State board, and
- (2) invest such board with such duties and authority as will assist the Commission in its review of such rates.
- (h)
- (1) No “company” (as defined in section 79b(a)(2) 1 of title 15), which owns or operates facilities for the generation of electricity (together with associated transmission and other facilities) primarily for sale to the Administrator under section 839d of this title shall be deemed an “electric utility company” (as defined in section 79b(a)(3) 1 of title 15), within the meaning of any provision or provisions of chapter 2C 1 of title 15, if at least 90 per centum of the electricity generated by such company is sold to the Administrator under section 839d of this title , and if—
- (A) the organization of such company is consistent with the policies of section 79a(b) and (c) 1 of title 15, as determined by the Securities and Exchange Commission, with the concurrence of the Administrator, at the time of such organization; and
- (B) participation in any facilities of such “company” has been offered to public bodies and cooperatives in the region pursuant to section 839d(m) of this title .
- (2) The Administrator shall include in any contract for the acquisition of a major resource from such “company” provisions limiting the amount of equity investment, if any, in such “company” to that which the Administrator determines will be consistent with achieving the lowest attainable power costs attributable to such major resource.
- (3) In the case of any “company” which meets the requirements of paragraph (1), the Administrator, with the concurrence of such Commission, shall approve all significant contracts entered into by, and between, such “company” and any sponsor company or any subsidiary of such sponsor company which are determined to be consistent with the policies of section 79a(b) and (c) 1 of title 15 at the time such contracts are entered into. The Administrator and the Securities and Exchange Commission shall exercise such approval authority within sixty days after receipt of such contracts. Such contracts shall not be effective without such approval.
- (4) Paragraph (1) of this subsection shall continue to apply to any such “company” unless the Administrator or the Securities and Exchange Commission, or both, through periodic review, (A) determine at any time that the “company” no longer operates in a manner consistent with the policies of section 79a(b) and (c) 1 of title 15 and in accordance with this subsection, and (B) notify the “company” in writing of such preliminary determination. This subsection shall cease to apply to such “company” thirty days after receipt of notification of a final determination thereof. A final determination shall be made only after public notice of the preliminary determination and after a hearing completed not later than sixty days from the date of publication of such notice. Such final determination shall be made within thirty days after the date of completion of such hearing.
- (1) No “company” (as defined in section 79b(a)(2) 1 of title 15), which owns or operates facilities for the generation of electricity (together with associated transmission and other facilities) primarily for sale to the Administrator under section 839d of this title shall be deemed an “electric utility company” (as defined in section 79b(a)(3) 1 of title 15), within the meaning of any provision or provisions of chapter 2C 1 of title 15, if at least 90 per centum of the electricity generated by such company is sold to the Administrator under section 839d of this title , and if—
- (i)
- (1) At the request and expense of any customer or group of customers of the Administrator within the Pacific Northwest, the Administrator shall, to the extent practicable—
- (A) acquire any electric power required by (i) any customer or group of customers to enable them to replace resources determined to serve firm load under section 839c(b) of this title , or (ii) direct service industrial customers to replace electric power that is or may be curtailed or interrupted by the Administrator (other than power the Administrator is obligated to replace), with the cost of such replacement power to be distributed among the direct service industrial customers requesting such power; and
- (B) dispose of, or assist in the disposal of, any electric power that a customer or group of customers proposes to sell within or without the region at rates and upon terms specified by such customer or group of customers, if such disposition is not in conflict with the Administrator’s other marketing obligations and the policies of this chapter and other applicable laws.
- (2) In implementing the provisions of subparagraphs (A) and (B) of paragraph (1), the Administrator may prescribe policies and conditions for the independent acquisition or disposition of electric power by any direct service industrial customer or group of such customers for the purpose of assuring each direct service industrial customer an opportunity to participate in such acquisition or disposition.
- (3) The Administrator shall furnish services including transmission, storage, and load factoring unless he determines such services cannot be furnished without substantial interference with his power marketing program, applicable operating limitations or existing contractual obligations. The Administrator shall, to the extent practicable, give priority in making such services available for the marketing, within and without the Pacific Northwest, of capability from projects under construction on December 5, 1980 , if such capability has been offered for sale at cost, including a reasonable rate of return, to the Administrator pursuant to this chapter and such offer is not accepted within one year.
- (1) At the request and expense of any customer or group of customers of the Administrator within the Pacific Northwest, the Administrator shall, to the extent practicable—
- (j)
- (1) The Council, as soon as practicable after December 5, 1980 shall prepare, in consultation with the Administrator, the customers, appropriate State regulatory bodies, and the public, a report and shall make recommendations with respect to the various retail rate designs which will encourage conservation and efficient use of electric energy and the installation of consumer-owned renewable resources on a cost-effective basis, as well as areas for research and development for possible application to retail utility rates within the region. Studies undertaken pursuant to this subsection shall not affect the responsibilities of any customer or the Administrator which may exist under the Public Utility Regulatory Policies Act of 1978.
- (2) Upon request, and solely on behalf of customers so requesting, the Administrator is authorized to (A) provide assistance in analyzing and developing retail rate structures that will encourage cost-effective conservation and the installation of cost-effective consumer-owned renewable resources; (B) provide estimates of the probable power savings and the probable amount of billing credits under section 839d(h) of this title that might be realized by such customers as a result of adopting and implementing such retail rate structures; and (C) solicit additional information and analytical assistance from appropriate State regulatory bodies and the Administrator’s other customers.
- (k) There is hereby established within the administration an executive position for conservation and renewable resources. Such executive shall be appointed by the Administrator and shall be assigned responsibility for conservation and direct-application renewable resource programs (including the administration of financial assistance for such programs). Such position is hereby established in the senior executive service in addition to the number of such positions heretofore established in accordance with other provisions of law applicable to such positions.
§ 839g. Savings provisions
- (a) Nothing in this chapter shall be construed to affect or modify any right of any State or political subdivision thereof or electric utility to—
- (1) determine retail electric rates, except as provided by section 839c(c)(3) of this title ;
- (2) develop and implement plans and programs for the conservation, development, and use of resources; or
- (3) make energy facility siting decisions, including, but not limited to, determining the need for a particular facility, evaluating alternative sites, and considering alternative methods of meeting the determined need.
- (b) Nothing in this chapter shall alter, diminish, or abridge the rights and obligations of the Administrator or any customer under any contract existing as of December 5, 1980 .
- (c) Nothing in this chapter shall alter, diminish, abridge, or otherwise affect the provisions of other Federal laws by which public bodies and cooperatives are entitled to preference and priority in the sale of federally generated electric power.
- (d) If any provision of this chapter is found to be unconstitutional, then any contract entered into by the Administrator, prior to such finding and in accordance with such provisions, to sell power, acquire or credit resources, or to reimburse investigation and preconstruction expenses pursuant to section 839c of this title , and section 839d(a), (f) or (h) of this title shall not be affected by such finding.
- (e) Nothing in this chapter shall be construed to affect or modify any treaty or other right of an Indian tribe.
- (f) The reservation under law of electric power primarily for use in the State of Montana by reason of the construction of Hungry Horse and Libby Dams and Reservoirs within that State is hereby affirmed. Such reservation shall also apply to 50 per centum of any electric power produced at Libby Reregulating Dam if built. Electric power so reserved shall be sold at the rate or rates set pursuant to section 839e of this title .
- (g) Nothing in this chapter shall be construed to affect or modify the right of any State to prohibit utilities regulated by the appropriate State regulatory body from recovering, through their retail rates, costs during any period of resource construction.
- (h) Nothing in this chapter shall be construed as authorizing the appropriation of water by any Federal, State, or local agency, Indian tribe, or any other entity or individual. Nor shall any provision of this chapter of any plan or program adopted pursuant to the chapter (1) affect the rights or jurisdictions of the United States, the States, Indian tribes, or other entities over waters of any river or stream or over any groundwater resource, (2) alter, amend, repeal, interpret, modify, or be in conflict with any interstate compact made by the States, or (3) otherwise be construed to alter or establish the respective rights of States, the United States, Indian tribes, or any person with respect to any water or water-related right.
- (i) Nothing in this chapter shall be construed to affect the validity of any existing license, permit, or certificate issued by any Federal agency pursuant to any other Federal law.
§ 839h. Separability
If any provision of section 839b(a) through (c) of this title or any other provision of this chapter or the application thereof to any person, State, Indian tribe, entity, or circumstance is held invalid, neither the remainder of section 839b of this title or any other provisions of this chapter, nor the application of such provisions to other persons, States, Indian tribes, entities, or circumstances, shall be affected thereby.